| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance VILLAGE KHADED P O CHOWAI TEHSIL ANNI DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172001 | L1 | Admitted-Finance | ||
| 2 | L1₹8.1 LAdmitted-Finance MANDI HIMACHAL PRADESH | L1 | Admitted-Finance | ||
| 3 | L2₹8.5 L+₹39,339.90 (4.88%)Admitted-Finance | L2 | Admitted-Finance | ||
| 4 | L3₹10.1 L+₹2.0 L (24.9%)Admitted-Finance | L3 | Admitted-Finance | ||
| 5 | L4₹10.1 L+₹2.0 L (24.9%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹9.6 L
EMD Value
₹19,500
Closing Date
9 Sept 2026, 10:00 amClosed
EXECUTIVE ENGINEER HPPWD DIV. THALOUT AT PANDOH
EXECUTIVE ENGINEER HPPWD DIV. THALOUT AT PANDOH
Restoration of rain damages on Thalout Panjain Thachi Shetadhar road Km 0/0 to 40/00 SH - C/o protection wall at RD 14/255 to 14/330.
2026_PWD_142245_3
NO/PW/TLD/Tender/2026-4353-62 Dated 24.08.2026
Open Tender
Civil Works
Percentage
30 days
HPPWD SUB DIVISION BALICHOWKI
PLEASE REFER TO THE NOTICE INVITING TENDER
12 documents required · 12 mandatory
₹350
₹19,500
26 Sept 2026
29 Aug 2026
9 Sept 2026
29 Aug 2026
9 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structure as per drg. and technical specification clause 305.1 i/c setting out construction of shoring and bracing removal of stumps and other deletarious material and disposal up to a lead of 50 metre (fifty meter) dressing of sides and bottom and back filling in trenches with excavated suitable material ordinary soil and with in all lead and lift as per entire satisfaction and direction of Engineer-in-Charge | 81 | Per Cubic Metre | 337.79 | ₹27,360.99 |
| 2 | Providing and laying concrete for plain/reinforced concrete in 1:5:10 (One cement: five sand: ten crushed stone aggregate) 40 mm (forty milimetre) nominal size open foundation complete as per drawing and technical specification Clause 802,803,1202 and 1203 with 15 % (fifteen persant) plums execpt form work with in all lead and lift as per entire satisfaction and direction of Engineer-in-Charge. | 36 | Per Cubic Metre | 3,771.74 | ₹1,35,782.64 |
| 3 | Providing and laying of Boulder upron laid in wire crates with 4 mm (four milimeter) dia G.I.wire conforming to IS : 280 and IS:4826 in 100 mm x 100 mm (onehundred into one hundred milimeter) mesh (woven) diagonally) including 10 % (Ten persent ) extra for laps and joints laid with stones boulders weighting not less then 25 kg (Twenty five kilograme)each as per drawing and technical specifications clause 1301 with in all lead and lift as per entire satisfaction and direction of Engineer-in-Charge. | 276.48 | Per Cubic Metre | 2,754.36 | ₹7,61,525.45 |
| 4 | Removal of land slide in all kinds of soli in hilly area including ordinary rock not requiring blasting and boulders on rocky portion of slips (where blasting is required) by mechnical means including cutting and trimming of slops and disposal of cut material as per technical specification clause 302.3.3 including carriage of material and other incidentials with in all leads, lifts and as per the direction of the Engineer-in Charge. | 240 | Per Cubic Metre | 145.17 | ₹34,840.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
SBDJobNo3.pdf
Tender Documents • 3.04 MB
BOQ_211277.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .