Loading…
Loading…
Tender Value
₹8.8 L
EMD Value
₹8,900
Closing Date
24 Aug 2026, 6:00 pmClosed
Deputy Executive Engineer, Electrical (R&B) Sub-Division, Vyara
Providing Grid Connected Solar Plants at For Block No 1 and Block No 4 of COC, Panvadi, Vyara,Di-Tapi
335729
Tender Notice No 06 of 2026-27
Open
Electrical Works
Works
Tapi
8 documents required · 8 mandatory
₹900
Executive Engineer, Electrical (Rand B) Division, Surat.
₹8,900
16 Aug 2026
16 Aug 2026
16 Aug 2026
24 Aug 2026
16 Aug 2026
Providing Grid Connected Solar Plants at For Block No 1& Block No 4 of
COC,Panvadi,Vyara,Di-Tapi
DESCRIPTION TENDER RATE
Qty Unit Rate in Per Amount
No Rate in Words
1A 20 KW Supply, Installation, Testing & Commissioning of following size of Grid 44081.45 Rupees Forty PER
Tied Solar Power Plant with
Solar Panels (ALMM approved & DCR): Frame Material : Anodized Four Thousand KW
Aluminum alloy Frame With Twin Wall Profile, Front Cover : High Eighty One And
Transmission Low-Iron Tempered Glass (AR Coated), High efficency Paise Forty Five
and positive power tolerance Pmax: 0/+5, Module Efficiency should be
approx. 19.5%-22%, Normal operating temperature 45'C, Junction Only
Box with Waterproof IP67 & MC4 Compatible and Enclosed with
Bypass diodes, 100% Electroluminescence test to ensure error free
Modules, Thep. temp. co-efficient of the PV module shall equal or
better than -0.45%/degree C. Solar PV modules of minimum fill factor
75% to be used. Unit Production:- More than 4.5 Unit /kw /day
(Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear
Power Warranty includes all mechanical and electrical parameters of
the Solar panel. Modules must be complied to the DCR(Domestic
content requirements). The Ration of AC to DC is 5:6 for the
Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max
efficiency: 97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating
Altitude (m) ≤4000, O/p Power Factor: ~1, O/P THDi: <3%, Operating
Tempreture Range: -25~60°C, Integrated protection of Inverter are
Anti-islanding Protection, Input Reverse Polarity Protection, Insulation
Resistor Detection, Ground fault protection, Residual Current
Monitoring Unit, Output Over Current Protection, Output Short Circuit
Protection, Output Over Voltage Protection, PV array string fault
Protection. Protection Degree: IP65, User Interface LCD & APP,
Datalogger & Communication: GPRS / Wi-Fi.
Integrated, Input Reverse Polarity Protection Integrated, Insulation
Resistor Detection Integrated, Residual Current Monitoring Unit
Integrated, Output Over Current Protection Integrated, Output Short
Circuit Protection Integrated, Output Over Voltage Protection
Integrated, Protection Degree: IP65, User Interface LCD &
APP,Datalogger & Communication: GPRS / Wi-Fi, Module Mounting
Structure: The mounting (Rectangular pipe / square pipe / circular
pipe) with requisite cross bars, nuts and bolts, etc. shall be Hot deep
galvanized with minimum 80micron coating. The Rectangular / square
/circular hollow pipe section used for the structure should have a
minimum thickness of 2.0 mm. other than above, the material
thickness should be minimum 2.5 mm. A certificate of a structural
engineer certifying the strength and stability of the mounting structure
to withstand the weight and wind speed of 150 km/hour throughout the
life span of 25 years of the system, shall be submitted by the vendors.
Hot Dipped Galvanized steel coils. suitable arrangement for base
plate for foundation , solar panel mounting, the structure should be
suitable for carry the load of solar panel,wiring, sprinkler system etc.
with necessary foundation work/wall mount, j bolt, anchor fastner etc.
the nut bolt used for installtion of stucture should be (SS 304)
quality.The ground clearance of the bottom most edge of solar panel
shall not be less than 300 mm to 1200 mm or as per site’s
technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM
Balane of System with necessary Swichgears (Suitabel size and
protection of ACDB & DCDB), inter connecting wiring, earthing system
as per the CEIG drawing approval, lightining arrester system as per
the CEIG drawing approval, all liasoning work with various gov.
dipartment like state nodal agency,DISCOM & CEIG is included in
agency scope (Excluding All charges namely GEDA Application fees,
Solar connectivity Charges, Meter connectivity Charges, Meter testing
Charges and system stability/strenthning charges.) (B) Grid Tied Solar
Power System: 7 - 10 kW (3 - phase)[14-1-1]
Deputy Executive Engineer, Executive Engineer,
Electrical R & B sub-Division, Electrical R & B Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule B Solar.pdf
ELEGIBILITY CRITERIA.pdf
Notice No 06 of 2026-27 Solar.pdf
Tender for Supply and Installation Commissioning.pdf
4.0 FINAL _ SBD (Electrical Work) _ 2024 _ 120 pg (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .