Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
10 Aug 2026, 6:00 pm
Sub Maj Pargunan A, Offg AGE (I) R and D Manali
AGE I R AND D MANALI PIN 175103 PH 01902255014
REPAIR /MAINTENANCE OF STAND BY DG SETS, RECD DEVICE AND CONNECTED ACCESSORIES FOR ANSHANKAN BUILDING 32 BIGHA LAND UNDER AGE(I) RnD MANALI
2026_MES_779781_1
AGE(I)/MNL-51/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
DGRE Manali
As per NIT and tender documents
5 documents required · 5 mandatory
₹500
AGE I R AND D MANALI
₹70,000
Yes
20 Jul 2026
20 Jul 2026
12 Aug 2026
20 Jul 2026
10 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply only retrofit emission control device for 500 kVA for desiel generator of any make & Catagory complete all as specified and directed:-
Application:- (i) RECD must be of makes approved by CPCB, which reduce particulate matter (PM 2.5), Carbon Monoxide and Hydrocarbons emitted from Diesel Engine, Guaranteed specified Particulate matter (PM )
(ii) Carbon Monoxide, Hydrocarbon reduction efficiency (Min). Guaranteed specified Particular Matter (PM 2.5). Carbon Monoxide, Hydrocarbon reduction efficiency
(iii) Retrofit device is to be installed in place of existing silencer.
(iv) No soot is to be collected in the retrofit device. The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap
(v) Min Particular Matter Reduction 85 %
(vi) Min Carbon Monoxide Reduction 90%
(vii) Min Hydrocarbon Reduction 90% | 1 | EACH | - | - |
| 2 | M&L for installation and comissioning including fixing the RECD strucrure,PCD Control panel including Exhaust piping, external civil work, distribution board to be fixed with existing DG set in synchronisation, transportation of RECD Device for 500 KVA DG Set at AGE(I) R&D Manali all as specified & directed by Engr-in-charge complete with following test certificates:- | 1 | Each Job | - | - |
| 2.01 | General Technical Requirements (GTR)/ Commissioning:-
(a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of technical exhaust passes through the Emission Control retrofit device. (b) Anit- Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust. (c) Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, new battery voltage, over current, earth-fault, short circuit, phase sequence change etc. (d) The Emission Control retrofit device shall be with corrosion resistive and HR Paint. (e) Unloading and placement of the Emission Control retrofit device at the time of Delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way. (f) The contractor shall provide the trial run (Testing) of Emission Control retrofit device. The contractor shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set. (g) Exhaust piping, external civil work, distribution board shall be provided by the contractor. | - | - | - | - |
| 2.02 | Scope of Installation:-
(a) Installation of Emission Control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the authorized agency.
(b) Construction of suitable earthing station (if applicable) and necessary connections shall be done by the agency.
Warranty /Service included for : - 3 years
AMC of RECD : AMC of RECD incl for 2 years
Number of preventive maintenance visits offered in a year during warranty Period : - 2 visits per year. | - | - | - | - |
| 3 | M&L for NABL testing before and after installation of RECD device installed with existing 500 KVA DG Set complete all as specified and directed complete with following test certificates:- | 1 | Each Job | - | - |
| 3.01 | TEST REPORTS Certification:- Device should be 'Type Approved' as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) for Diesel Power Generating Set Engines Dated 01/02/2022, wide Pollution Control Series PCLS/ 12/2021-22. Adhering to this, RECD to be 'Type Tested for an equivalent KVA family as per the System and Procedure from any one of the four Central Pollution Control Board. Government of India recognized/ approved test agencies/ laboratories as given below:
(a) Automotive Research Association of India (ARAI, Pune)
(b) Vehicle Research Development Establishment (VRDE, Ahmednagar)
(c) International Centre for Automotive Testing (ICAT, Manesar )
(d) Indian Institute of Petroleum(IIP, Dehradun)
Back Pressure due to the Emission Control retrofit device:- Maximum back pressure exerted by the Emission Control retrofit device at max prescribed load by DG OEM (as per the capacity of the DG set) should be under limit and display panel to be provided for back pressure and exhaust temperature limit.
Note: National Accreditation Board for Testing and Calibration Laboratories (NABL) testing certificate before and after installation of RECD in the device should be provided by the contractor. The rate of the test shall deemed to be included in the quoted rate by the contractor. | - | - | - | - |
| 4 | Supply only retrofit emission control device for 125 kVA for desiel generator of any make and
catagory:-
Application:-
(i) RECD must be of makes approved by CPCB, which reduce particular matter (PM 2.5), Carbon Monoxide and Hydrocarbons emitted from Diesel Engine,Guaranteed specified Particulate matter (PM ) Carbon Monoxide, Hydrocarbon reduction efficiency (Min). Guaranteed specified Particular Matter (PM 2.5)
(ii) Carbon Monoxide, Hydrocarbon reduction efficiency
(ii) Retrofit device is to be installed in place of existing silencer.
(iii) No soot is to be collected in the retrofit device. The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap.
(iv) Min Particular Matter Reduction 85%
(v) Min Carbon Monoxide Reduction 90%
(vi) Min Hydrocarbon Reduction 90% | 1 | Each | - | - |
| 5 | M&L for installation and comissioning including fixing the RECD strucrure, PCD Control panel including Exhaust piping, external civil work, distribution board to be fixed with existing DG set in synchronisation, transportation of RECD Device for 125 KVA DG Set at AGE(I) R&D Manali all as specified & directed by Engr-in-charge complete with following test certificates:- | 1 | Each Job | - | - |
| 5.01 | General Technical Requirements (GTR)/ Commissioning:-
(a) Emission Control retrofit device shall be complete with safety precautions to ensure no damage should be done to the DG set operations under any circumstances. The Emission Control retrofit device should be closely coupled with the DG exhaust to ensure 100% of technical exhaust passes through the Emission Control retrofit device
(b) Anit- Vibration mountings shall be provided for complete Emission Control retrofit device in case of flexible coupling with the diesel generator exhaust.
(c) Emission Control retrofit device should have protection against under voltage, over voltage, under frequency, over frequency, new battery voltage, over current, earth-fault, short circuit, phase sequence change etc.
(d) The Emission Control retrofit device shall be with corrosion resistive and HR Paint.
(e) Unloading and placement of the Emission Control retrofit device at the time of Delivery is in the scope of buyer. The consignee shall ensure that the site is located along a motorable way.
(f) The contractor shall provide the trial run (Testing) of Emission Control retrofit device. The contractor shall conduct trial run of the Emission Control retrofit device with the available electrical load at site. The trial run shall be for TWO hours. The electrical loading shall not be more than the rated capacity of the DG set.
(g) Exhaust piping, external civil work, distribution board shall be provided by the contractor. | - | - | - | - |
| 5.02 | Scope of Installation:-
(a) Installation of Emission Control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the agency.
(b) Construction of suitable earthing station (if applicable) and necessary connections shall be done by the agency.
Warranty/Service included for : - 3 years.
AMC of RECD :- AMC of RECD incl for 2 years
Number of preventive maintenance visits offered in a year during warranty Period : - 2 visits per year. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_873437.xls
BOQ • 3.90 MB
TenderDocuments512627EM.pdf
Tender Documents • 1.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].