Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹73.5 L
EMD Value
₹74,000
Closing Date
5 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
Constructuion of Box type (5m*3.7m, 3nos) VRB at near Vani village on Viramgam drain Ta. Viramgam, Dist. Ahmedabad
367455
12 of 2026-27
Open
Civil Works
Works
Ahmedabad
6 documents required · 5 mandatory · 1 optional
₹2,400
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
₹74,000
21 Nov 2026
21 Nov 2026
21 Nov 2026
5 Dec 2026
21 Nov 2026
120 days
BILL OF QUANTITY
Name of Constructuion of Box type (5m*3.7m, 3nos) VRB at near Vani village on Viramgam drain
work: Ta. Viramgam, Dist. Ahmedabad
Item NO. DESCRIPTION QTY. UNIT RATE in AMOUNT
Excavation in all sorts of soil (including wet and
slushy condition of soil) with yellow, sandy,
gravelly soil including soft murrum & H.M.
including sorting & stacking and depositing the
1 excavated stuff in uniform layers as and where 888.00 Cmt 75.00
directed upto lead of 30 mt. and lift as shown
below including clearing the site etc.
complete.(Including dewatering) (a) 0 to 3 Mt.
Providing and laying in position reinforce cement
concrete using crushed aggregate including
providing necessary formwork, centering,
vibrating, smooth specified finishing, curring as
required for specified leads and all lifts etc
complete in M-15 grade.
Providing and laying in position reinforce cement
concrete using crushed aggregate including
providing necessary formwork, centering,
vibrating, smooth specified finishing, curring as
required for specified leads and all lifts etc
complete in M-25 grade.
Providing and laying in position reinforce
controlled cement concrete using crushed
4 aggregate including providing necessary 410.00 Cmt 5863.00
formwork, centering, vibrating, all lifts etc complete
in M-30 grade concrete.(MSA20mm)
Providing and laying HYSD steel bar
reinforcement for R.C.C. works and anchor bar
with providing binding wires including cutting,
5 bending, welding, binding in position hooking, 30.61 M.T. 82340.00
placing in position with all leads & lifts etc.
(C) For TMT Bars (fe-550 D)
Providing and fixing in position pre-moulded
asphalt or bitumen cork board of approved quality
and specifications as per design and drawing.
20 mm thickness
Backfill with selected earth from outside borrow
area or from excavatedusefull material including
7 watering, ramming, consolidation etc. with 434.00 Cmt 86.00
pneumatic templing and lead upto1.0 Km. and all
lift etc. completed
8 Providing Rubble Apron as per drawing & design. 245.00 Cmt 2615.00
Providing weep holes in the retaining wall with
fixtures as directed etc. complete
(b) P.V.C.Pipe (6 kgf/sq.cm, 110 mm)
BILL OF QUANTITY
Name of Constructuion of Box type (5m*3.7m, 3nos) VRB at near Vani village on Viramgam drain
work: Ta. Viramgam, Dist. Ahmedabad
Item NO. DESCRIPTION QTY. UNIT RATE in AMOUNT
Providing galvznized iron/cast iron 100mm dia
water spouts incl. necessary iron fittings as per
design and drawing etc. comp. as per Most
Providing and laying graded filters of sand, gravel
and over size metal (100 mm to 150 mm) behind
the retaining wall and wing walls as directed as per
approved drawing with all lead & lifts etc. complete
Quarrying transporting and depositing selected
materials from borrow area for raising of
12 embankment work in all zone of earthen dam for 4300.00 Cmt 86.00
specified thickness as directed for lead upto 1 km
and all lifts etc.complete.
Dryrolling of earth work with light rollers (upto
13 2 ton capacity) as directed with all lifts etc. 4300.00 Cmt 10.00
Care & Diversion of river as directed including
1.5% Lump sum from Item No. 1 to
14 dewatering of earth dam foundation including
C.O.T. during construction etc. completed.
In words Seventy Three Lakh Forty Nine Thousands Thirty Rupees and Seventy Seven Paisa Only
I/We am/are willing to carry out the work at…… % above/below percent(Should be written in figures and words) of
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Vani Viramgam.pdf
sch B Vani Viramgam.pdf
Tender notice 12 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .