| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹13.6 L+₹69,248.91 (5.38%)Rejected-AOC | L2 | Rejected-AOC Second Lowest | |
| 3 | L3₹14.1 L+₹1.2 L (9.61%)Rejected-Finance SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | L3 | Rejected-Finance Third lowest |
Tender Value
₹17.1 L
EMD Value
₹42,750
Closing Date
21 Jul 2020, 5:00 pmClosed
Tessymon K K Executive Engineer
Office of the Executive Engineer KIP RB Division No II Pulamon Kottarakkara PIN 691531
Permanent Rectification work
2020_Irrig_371677_1
5/ET/KIP/RB/DnII/2020-21
Open Tender
Civil Works - Canal
Item Rate
120 days
CANAL JN
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,800
Executive Engineer KIP RB Division No II Kottarakk
₹42,750
Yes
6 Oct 2020
14 Jul 2020
27 Jul 2020
14 Jul 2020
21 Jul 2020
14 Jul 2020
Amount
SCHEME -1 (ch:14000 o 14050m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od66920/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of aii materials ,Label charges,watering, curing etc complete as per the directions of the departmental Officers at site.cost for 1m3concrete.as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
scheme 2 (ch:14050 o 14080m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
Scheme 3 (ch:14080m to 14150m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete.as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete,as per specification and as per the direction of the Engineer-in-charge
Scheme 4 (ch:14150 o 14190m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. completeas per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
Scheme 5 (ch:14190m to 14250m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
Scheme 6(ch:14250 o 14270m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
Scheme 7 (ch:14270m to 14320m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
Scheme 8 (ch:14320m to 14400m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
Scheme 9 (ch:14400 o 14450m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
Scheme 10(ch:14450m to 14490m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
Scheme 11(ch:1440m to 14550m)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per specification and as per the direction of the Engineer-in-charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per specification and as per the direction of the Engineer-in-charge
od68971/2019_2020/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per specification and as per the direction of the Engineer-in-charge
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of the Engineer-in-charge
AKASH JAYAN
R.Rajendran Pillai
Bidder Name
R.Rajendran Pillai
Y GEORGE KUTTY
AKASH JAYAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_526267.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .