Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 Cr+₹25.7 L (8.36%)Admitted-Finance 102 IST FLOOR DEVIKA CHAMBER RDC RAJ NAGAR GHAZIABAD U P | GHAZIABAD | UTTAR PRADESH | 201001 | ₹3.3 Cr+₹25.7 L (8.36%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NP BUILDWELL PRIVATE LIMITED L2 | KRV AND ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
by mechanical means | 350 | Cum. | 2,572.81 ₹9,00,483.5 | 2,374.44 ₹8,31,054 Lowest |
| 2.00 | Tack coat using VG-10 grade bitumen, Over dry and hungry bituminous surfaces @0.40 kg/sqm | 72,034 | Sqm. | 25.25 ₹18,18,858.5 | 23.3 ₹16,78,392.2 Lowest |
| 3.00 | Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead up to desired location over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 bulk @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) | 284 | Cum. | 10,193.56 ₹28,94,971.04 | 9,407.61 ₹26,71,761.24 Lowest |
| 4.00 | Providing and laying Bituminous Concrete with the use of batch type HMP producing an average output of 60-90 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG -30 bulk @5.4% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction 2.35 gm/cc density (rate shall be adjusted after execution of work on the basis of bitumin content & density achieved actually or as per jobmix formula whichever is less) @bitumin 44652.50/Mt & grit @2415.10/Cum. adjusted as per MoRTH specification clause No. 508 complete in all respects Grading II. | 1,990 | Cum. | 12,806.1 ₹2,54,84,139 | 11,818.69 ₹2,35,19,193.1 Lowest |
| 5.00 | Clearance of hill side katcha drain by removal of earth from the choked hill side drain and disposing it on the valley side manually as directed by engineer in charge including supply of all material, labour, T&P etc. required for completion of work. | 16.85 | Km. | 10,700 ₹1,80,295 | 9,875 ₹1,66,393.75 Lowest |
| 6.00 | Maintenance of both side earhen shoulder to achieve the approved level either by Stripping excess soil from the shoulder surface or by adding fresh approved selected soil and compacting it with appropriate equipment as directed by engineer in charge including supply of all material, labour, T&P etc. required for completion of work. | 16.85 | Km. | 6,420 ₹1,08,177 | 5,925 ₹99,836.25 Lowest |
| 7.00 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 3,370 | Sqm. | 560 ₹18,87,200 | 516.5 ₹17,40,605 Lowest |
Tender Value
Refer Docs
EMD Value
₹8.1 L
Closing Date
1 Mar 2024, 2:00 pmClosed
SE-8th Circle PWD Tehri
Office of The SE-8th Circle PWD Tehri
Renewal by BC of Dabarkhal-Kudi-Maun-Guriyali-Ranichauri-Dandachali-Gaja-Nakot-Pangarkhal SH-75 From Km. 27 to 34,37 to 41, 52, 54 to 56 under Annual Repair in Narendranagar constituency of District Tehri Garhwal.
2024_pwd_70062_1
Superintending Engineer 8th Circle PWD New Tehri Vide Letter No. 1140 / 03 cash-tender-8/2023 dated
Open Tender
Civil Works - Roads
Item Rate
30 days
Narendranagar
As Per Tender Notice, Technical Bid and BOQ
2 documents required · 2 mandatory
₹5,900
Executive Engineer, C.D. PWD Narendranagar
₹8.1 L
8th Circle PWD Tehri
4 Mar 2024
21 Feb 2024
2 Mar 2024
21 Feb 2024
1 Mar 2024
23 Feb 2024
23 Feb 2024
Amount
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. by mechanical means
Tack coat using VG-10 grade bitumen, Over dry and hungry bituminous surfaces @0.40 kg/sqm
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead up to desired location over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 bulk @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and laying Bituminous Concrete with the use of batch type HMP producing an average output of 60-90 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG -30 bulk @5.4% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction 2.35 gm/cc density (rate shall be adjusted after execution of work on the basis of bitumin content & density achieved actually or as per jobmix formula whichever is less) @bitumin 44652.50/Mt & grit @2415.10/Cum. adjusted as per MoRTH specification clause No. 508 complete in all respects Grading II.
Clearance of hill side katcha drain by removal of earth from the choked hill side drain and disposing it on the valley side manually as directed by engineer in charge including supply of all material, labour, T&P etc. required for completion of work.
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
NP BUILDWELL PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .