| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | om parkash kapoor L1 | krishan chand L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation (trenches for M/holes) upto all depths in all classification of earth work such as pick work, jumper work, blasting soft/hard rock or chieselling soft/hard rock where blasting is prohibited, cutting of matelled bitumenous roads / pucca pavements i/c saturated soil/ bailing or pumping out water in all lifts including trimming and dressing of sides,levelling of beds to correct grade including shoring,strutting, planking, timbering and dewatering wherever required, stacking the useable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the useable soil to trenches in 15cm (fifteen centimeters)layers including consolidating of each deposited layer by ramming and watering and then disposing of all surplus excavated soil,un-usable materials as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and also including cost of diversion of traffic,night signals,fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respects as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts. | 343.23 | cum | 298 ₹1.0 L | 550 ₹1.9 L |
| 2.00 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres complete in all respects as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts. Pick & Jumper work. | 300 | cum | 310 ₹93,000 | 450 ₹1.4 L |
| 3.00 | Excavation in earth work and disposal of all excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed in spade work complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 48.75 | cum | 370 ₹18,037.50 | 350 ₹17,062.50 |
| 4.00 | Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batterns and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in-situ-reinforced concrete and plain concrete work in:- Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 1,307.4 | sqm | 170 ₹2.2 L | 400 ₹5.2 L |
| 5.00 | Flat surfaces such as soffits of sunspended floor, roofs landings and the like floors etc upto 200mm thickness complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 39 | sqm | 180 ₹7,020 | 400 ₹15,600 |
| 6.00 | Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 156.8 | cum | 5,010 ₹7.9 L | 9,500 ₹14.9 L |
| 7.00 | Providing and laying cement concrete 1:2:4 (1cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in:-In foundation and plinth complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 14.8 | cum | 6,910 ₹1.0 L | 11,000 ₹1.6 L |
| 8.00 | Providing and laying cement concrete work 1:1.1/2:3 (1 cement : 1.1/2 sand :3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : Wall (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level :- complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 228.11 | cum | 8,990 ₹20.5 L | 12,000 ₹27.4 L |
| 9.00 | Providing and laying Mild steel /Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level (tor steel) complete in all respect including all leads and Lifts as per the direction and satisfection of Engineer-In-Charge. | 9,427.38 | kg | 78.5 ₹7.4 L | 89 ₹8.4 L |
| 10.00 | Wire crates of G.I. wire filles with boulders with square cut faces against the wire. (Wire crates to be measured and paid for separately). complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 75 | cum | 2,010 ₹1.5 L | 3,000 ₹2.3 L |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
10 Feb 2026, 11:00 amClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION DHARMSHALA
Providing Laying jointing Testing of DI K7 Pipe 150mm Dia Wire crate work Cons 100 Nos RCC Manhole Chamber for Laying the main sewerage pipe line from Bhasunag to Gamru village
2026_HPIPH_127185_1
EE/EA-1/JSD/Ten-16839-938
Open Tender
Civil Works
90 days
DHARAMSHALA
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
EE JSD DHARAMSHALA
₹2.0 L
11 Feb 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
10 Feb 2026
3 Feb 2026
31 Jan 2026 - 3 Feb 2026
Excavation in foundation (trenches for M/holes) upto all depths in all classification of earth work such as pick work, jumper work, blasting soft/hard rock or chieselling soft/hard rock where blasting is prohibited, cutting of matelled bitumenous roads / pucca pavements i/c saturated soil/ bailing or pumping out water in all lifts including trimming and dressing of sides,levelling of beds to correct grade including shoring,strutting, planking, timbering and dewatering wherever required, stacking the useable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the useable soil to trenches in 15cm (fifteen centimeters)layers including consolidating of each deposited layer by ramming and watering and then disposing of all surplus excavated soil,un-usable materials as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and also including cost of diversion of traffic,night signals,fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respects as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts.
Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres complete in all respects as per direction and to the entire satisfaction of Engineer-in-charge witnin all leads and lifts. Pick & Jumper work.
Excavation in earth work and disposal of all excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed in spade work complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batterns and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in-situ-reinforced concrete and plain concrete work in:- Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Flat surfaces such as soffits of sunspended floor, roofs landings and the like floors etc upto 200mm thickness complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.
Providing and laying cement concrete 1:2:4 (1cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in:-In foundation and plinth complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Providing and laying cement concrete work 1:1.1/2:3 (1 cement : 1.1/2 sand :3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : Wall (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level :- complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.
Providing and laying Mild steel /Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level (tor steel) complete in all respect including all leads and Lifts as per the direction and satisfection of Engineer-In-Charge.
Wire crates of G.I. wire filles with boulders with square cut faces against the wire. (Wire crates to be measured and paid for separately). complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Wire crates made of G.I. wire filled with boulders with square cut faces against the wire (Boulder filling to be measured and paid for separetaly). G.I. wire 5mm thick corresponding to SWG-6 (25cmx7.50cm.) mesh complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge.
Providing laying , jointing & testing in trenches to be leveled to grade ,centrifugally cement mortar lined ductile iron (DI)/ (spun) pressure piped confirming to BIS 8329 – 2000 class K-7 suitable for tyton push joints i/c bends of all degrees , tees collar tapers ( if required ) crosses ,short pieces ,tail pieces ,plugs of required sizes i/c cutting pieces , chamfering wherever required ( earth work in trenches and cost of joints to be measured and paid separately) i/c carriage with in all leads & lifts .complete in all respects of following dia :150 mm dia Ductile Iron Class K-7 pipes 150 mm :-
Providing, Laying push-on-joints to Ductile Iron Pipes including testing of joints and the cost of Ruber Gaskets Conforming to I.S 5382 of S.B.R quality complete in all respect i/c all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge.150 mm
Providing & fixing of precast RCC (SFRC) manhole cover with frame conforming to IS specifications Code- 12592 Part-I & II with latest amendment (Heavy duty) complete in all respect within all leads and lifts as per the directions and to the entire satisfaction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_187763.xls
BOQ • 0.29 MB
FORM8.pdf
Tender Documents • 1.09 MB
form6.pdf
Tender Documents • 0.11 MB
term.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid