Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 1759 SECOND FLOOR SECTOR 28 FARIDABAD 121008 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121008 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Not qualified in technical bid |
Tender Value
₹42.5 L
Closing Date
9 Aug 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (EM)(SHP), Rishikesh
Executive Engineer (EM)(SHP), Manribhali Colony, Pragatipuram, Rishikesh
Repair and Maintenance works of Unit- 1 and Unit- 2 of Urgam SHP (2X1500kW) in District- Chamoli
2021_UJVN_34048_1
03/EE(EM)(SHP)/Rishikesh /2021-22
Open Tender
Repair and Maintenance Works
Item Rate
120 days
URGAM
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,360
Yes
Director, Horticulture and Food Processing, Uttara
Exempted
28 Sept 2021
1 Jul 2021
11 Aug 2021
5 Jul 2021
9 Aug 2021
10 Jul 2021
120 days
Amount
UNIT -I
Butterfly Valve Assembly:- Dismantling of Complete BFV assembly ,fixing of Dummy plate on Penstock. Replacement of BFV disc seal, repairing of SS seal locking ring, drilling & tapping, replacement of damaged SS hardware’s, repair of non driving end damaged locking devise mechanism, adjustment of seal, leakage sealing if any, and dry testing of BFV- Complete in all respect including all man & material required for proper completion of work.
Runner Assembly:- Dismantling of runner assembly, measuring and recording bucket profile dimension, welding with 3.15mm D&H, L&T, ESAB make electrode 309 MO with proper heat treatment process, grinding, profile making, machining and balancing of Runner, Maintaining Final dimension as per drawing for full load output capacity in all respect including all man & material required for proper completion of work .
Nozzle and Deflector Assembly:- Dismantling complete Nozzle and Deflector Assembly , Repairing damaged parts, replacement of damaged seal and hardware’s, complete machining of welded portion , testing-complete in all respect including all man & material required for proper completion of work
Nozzle and Deflector servomotors:- Complete overhauling of all Nozzles and Deflector servomotors, replacement of damaged seal and hardware’s, dry testing complete in all respect including all man & material required for proper completion of work .
Turbine Shaft, DE And NDE Bearing:- Complete dismantling of turbine top casing, turbine shaft, inspection, cleaning and machining of turbine shaft bearing contact surface area if required, cleaning of DE and NDE bearing, Rebabitting of DE and NDE guide bearing, replacement of seal , gasket and hardware’s complete in all respect including all man and material required for proper completion of work.
Turbine DE and NDE Shaft Seal:- Complete dismantling, inspection, cleaning and replacement of damaged seal
Turbine and Generator shaft coupling:- Complete dismantling of coupling bushes, circlip and hardware’s, inspection, replacement of damaged bushes and hardware’s, complete in all respect including all man and material required for proper completion of work.
Cooling water system:- Complete cleaning of all pipes , coolers, heat exchangers and replacement of damaged seal and hardware’s for proper function of system including all man and material required for proper completion of work.
OPU:- Complete overhauling of OPU pump, Cleaning of oil tank, ,loading & unloading valve cleaning & pressure setting, checking of accumulator nitrogen gas pressure if required top up the gas, cleaning of all dc valves, pressure line filters, pressure switch, replacement of seals and fittings, hardware’s, including all man and material required for proper completion of work.
Generator DE And NDE Bearing:- Cleaning of DE and NDE bearing, Rebabitting of DE and NDE guide bearing, replacement of seal , gasket and hardware’s complete in all respect including all man and material required for proper completion of work.
Complete reassembly of turbine components (Turbine shaft, Runner assembly, turbine DE & NDE Bearing), Levelling and alignment of complete turbine & generator assembly with flexible coupling and testing & commissioning of machine.
Recalibration of all electromechanically relay (over voltage relay, under voltage relay, phase sequence relay, over current earth fault relay, differential over current relay) .replacement of damaged electromechanically operated relay , fixing & wiring for proper function of relay in all trip & alarm circuit
UNIT -II
Butterfly Valve Assembly:- Dismantling of Complete BFV assembly, fixing of Dummy plate on Penstock. Replacement of BFV disc seal, repairing of SS seal locking ring, drilling & tapping, replacement of damaged SS hardware’s, repair of non driving end damaged locking devise mechanism, adjustment of seal, leakage sealing if any, and dry testing of BFV- Complete in all respect including all man & material required for proper completion of work.
Runner Assembly:- Dismantling of runner assembly, measuring and recording bucket profile dimension, welding with 3.15mm D&H, L&T, ESAB make electrode 309 MO with proper heat treatment process, grinding, profile making, machining and balancing of Runner, Maintaining Final dimension as per drawing for full load output capacity in all respect including all man & material required for proper completion of work .
Nozzle and Deflector Assembly:- Dismantling complete Nozzle and Deflector Assembly ,Repairing damaged parts, replacement of damaged seal and hardware’s, complete machining of welded portion , testing-complete in all respect including all man & material required for proper completion of work.
Nozzle and Deflector servomotors:- Complete overhauling of all Nozzles and Deflector servomotors, replacement of damaged seal and hardware’s, dry testing complete in all respect including all man & material required for proper completion of work .
Turbine Shaft, DE And NDE Bearing:- Complete dismantling of turbine top casing, turbine shaft, inspection, cleaning and machining of turbine shaft bearing contact surface area if required, cleaning of DE and NDE bearing, Rebabitting of DE and NDE guide bearing, replacement of seal , gasket and hardware’s complete in all respect including all man and material required for proper completion of work.
Turbine DE and NDE Shaft Seal:- Complete dismantling, inspection, cleaning and replacement of damaged seal
Turbine and Generator shaft coupling:- Complete dismantling of coupling bushes, circlip and hardware’s, inspection, replacement of damaged bushes and hardware’s, complete in all respect including all man and material required for proper completion of work.
Cooling water system:- Complete cleaning of all pipes , coolers, heat exchangers and replacement of damaged seal and hardware’s for proper function of system including all man and material required for proper completion of work.
OPU:- Complete overhauling of OPU pump, Cleaning of oil tank, ,loading & unloading valve cleaning & pressure setting, checking of accumulator nitrogen gas pressure if required top up the gas, cleaning of all dc valves, pressure line filters, pressure switch, replacement of seals and fittings, hardware’s, including all man and material required for proper completion of work.
Generator DE And NDE Bearing:- cleaning of DE and NDE bearing, Rebabitting of DE and NDE guide bearing, replacement of seal , gasket and hardware’s complete in all respect including all man and material required for proper completion of work.
Complete reassembly of turbine components (Turbine shaft, Runner assembly, turbine DE & NDE Bearing), Leveling and alignment of complete turbine & generator assembly with flexible coupling and testing & commissioning of machine.
Recalibration of all electromechanically relay (over voltage relay, under voltage relay, phase sequence relay, over current earth fault relay, differential over current relay) .replacement of damaged electromechanically operated relay , fixing & wiring for proper function of relay in all trip & alarm circuit
Altman Power LLP
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .