| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical BOROJ COLONY SARASHIMA BELONIA SOUTH TRIPURA PIN 799155 | SOUTH TRIPURA | TRIPURA | 799155 | Rejected-Technical tender cancelled due to quoted rate of 1st lowest bidder is abnormally poor |
| 2 | Rejected-Technical | Rejected-Technical tender cancelled due to quoted rate of 1st lowest bidder is abnormally poor |
| 3 | Rejected-Technical BELONIA SOUTH TRIPURA | BELONIA | SOUTH TRIPURA | TRIPURA | 799155 | Rejected-Technical tender cancelled due to quoted rate of 1st lowest bidder is abnormally poor |
| 4 | Rejected-Technical GARJANMURA GARJANMURA GP UDAIPUR GOMATI PIN 799114 | UDAIPUR | GOMATI | TRIPURA | 799114 | Rejected-Technical tender cancelled due to quoted rate of 1st lowest bidder is abnormally poor |
Tender Value
₹24.2 L
EMD Value
₹48,325
Closing Date
28 Jan 2026, 3:00 pmClosed
Chief Executive Officer,Belonia Municipal Council
Office of the Belonia Municipal Council
Construction of Boundary wall at surrounding of Nath Swashan under Belonia Municipal Council during the year 2025-26
2026_Urban_69116_1
03/CEO/BMC/BLN/2025-26
Open Tender
Civil Works
Percentage
Belonia Municipal Council
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹48,325
9 Jul 2026
13 Jan 2026
29 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. -All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil.
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 40 mm nominal size
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level:1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
Centering shuttering including struttings, propping etc. and removal of form work for:Foundations, footings, bases for columns etc. for mass concrete with timber plank
Centering shuttering including struttings, propping etc. and removal of form work for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using shuttering ply
Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
12 mm cement plaster of mix.Cement mortar 1:4 (1 cement : 4 fine sand)
15mm cement plaster on the rough side of single or half brick wall of mix: Cement mortar 1:4 (1 cement : 4 fine sand)
Neat cement punning.
stage.html
html • 0.03 MB
tech_eval.pdf
finance_70329.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.36 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.20 MB
dnitboqmergednathsashan.pdf
Tender Documents • 3.25 MB
BOQ_70329.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .