| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹9.1 L+₹61,832.28 (7.28%)Rejected-Finance | ₹9.1 L+₹61,832.28 (7.28%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹9.3 L+₹79,523.92 (9.36%)Rejected-Finance | ₹9.3 L+₹79,523.92 (9.36%) | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹8.8 L
EMD Value
₹17,692
Closing Date
25 May 2026, 12:00 pmClosed
EE UDD
Office of the Executive Engineer Urban Drainage Division Jalasampad Bhavan(4th Floor), Bidhannagar, Kolkata- 700 091
Maintenance and Repairing Right Bank of Bager Khal from ch 5.700 K.M. to ch 5.775 K.M.for a total length 75.00 mtr (Near ShibMandir) under Halisahar Municipality, Dist- 24 Parganas during the year 2026-27.
2026_IWD_1024208_3
WBIW/EE/UDD/e-NIT-1/2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
Bager Khal
Please refer Tender documents.
6 documents required · 6 mandatory
₹17,692
Yes
4 Aug 2026
18 May 2026
28 May 2026
18 May 2026
25 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. (E) Beyond 4.00 km. and upto 5.00 km. | 135 | Cum | 371 | ₹50,085 |
| 2 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(iii) 15 cm av. diameter | 1,629 | Metre | 258.62 | ₹4,21,291.98 |
| 3 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 15 cm av. diameter | 965 | Metre | 125.14 | ₹1,20,760.1 |
| 4 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus | 150 | Metre | 123.95 | ₹18,592.5 |
| 5 | Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @ 20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet, fixture all complete as per direction of the Engineer - in - charge. | 150 | Sqm | 520.82 | ₹78,123 |
| 6 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 4,821 | Each | 7.15 | ₹34,470.15 |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 4,821 | Each Bag | 8.34 | ₹40,207.14 |
| 8 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 4,821 | Each Bag | 3.58 | ₹17,259.18 |
| 9 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge
b) TwoCoats | 767 | Sqm | 65.55 | ₹50,276.85 |
| 10 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). | 1,174 | Metre | 34.56 | ₹40,573.44 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
Tendernotice_2.pdf
PDF • 0.41 MB
BARCHART3.pdf
Tender Documents • 0.27 MB
BOQ_2517156.xls
BOQ • 0.28 MB
1stCorriNotice.pdf
PDF • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .