Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 105 LACHCHHI RAM GALI DAAT MANDI JWALAPUR HARIDWAR HARIDWAR UTTARAKHAND 249407 | HARIDWAR | UTTARAKHAND | 249407 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical BHEL | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical L 95 SHIVLOK COLONY PHASE 1 HARIDWAR HARIDWAR UTTARAKHAND 249403 | HARIDWAR | UTTARAKHAND | 249403 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹7,895
Closing Date
19 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SR MANAGER
ADM4
Repair of drains in BHEL Township, Haridwar
2026_BHEL_66523_1
BHEL/HEEP/WCS/26-27/202602471 Dt. 28.10.2026
Limited
Civil Works
Percentage
365 days
BHEL Twonship Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,895
19 Nov 2026
28 Oct 2026
19 Nov 2026
28 Oct 2026
19 Nov 2026
28 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish:1 km Unit:cum | 15 | Cum | 66.23 | ₹993.45 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.: All kinds of soil Unit:cum | 60 | Cum | 129.35 | ₹7,761 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. Unit:100sqm | 2 | 100 Psqm | 482 | ₹964 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 15 | Cum | 4,514.05 | ₹67,710.75 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) | 20 | Cum | 4,024 | ₹80,480 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2 | Cum | 4,703.9 | ₹9,407.8 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete (S.I.5.9.1/97) | 40 | Sqm | 166.9 | ₹6,676 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars. | 160 | Kg | 62.25 | ₹9,960 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:6 ( 1 cement : 6 Coarse sand ) | 46 | Cum | 3,876.15 | ₹1,78,302.9 |
| 10 | 12 mm cement plaster of mix : :1:4 (1 cement: 4 fine sand) Unit:Sqm | 200 | Sqm | 123.5 | ₹24,700 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_71977.xls
BOQ • 0.26 MB
CD-2.pdf
PDF • 0.52 MB
CD4.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .