Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC 139 GOBIND NAGAR AMBALA CANTT | ₹9.0 L Quoted ₹8.3 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹8.4 L+₹8,549.20 (1.03%)Rejected-AOC HOUSE NO 35 EAST DURGA NAGAR AMBALA CITY | ₹8.4 L+₹8,549.20 (1.03%) | L2 | Rejected-AOC 2nd |
Tender Value
₹9.0 L
EMD Value
₹18,000
Closing Date
21 Feb 2026, 6:30 pmClosed
Kailash Chander Kala Vivek and ravi kumar
DIV Ambala
AMtc of EPHS in Sector10 UE Ambala City Repair and replacement of damage existing rising main 400mm Dia water supply line complete in all respect
2026_HBC_502966_1
2026DA43FF97 731A 4D18 AEDF A9DADC87989F239HSV
Open Tender
Civil Works
Works
30 days
Ambala City
2 documents required · 2 mandatory
₹500
₹18,000
Yes
13 Apr 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
[20.10.8]Extra for fixing sluice valves/flap valves socketed or flanged including cartage from stores or nearest Railway Station to site of works 8. 400 mm i/d
[20.68.2]Providing, lowering, laying in trenches, aligning, fixing in position and jointing at all level/depths Ductile Iron (DI) standard specials plain /flanged/ socketed confirming to IS9523-2000 with rubber ring (EPDM/SBR) joints such as tees, bends, tapers, caps etc. with in trenches in DI pipe line complete including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. 2. Above 300mm dia and up to 600mm dia
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
[4.16.1.3]Excavating trenches of required width and depth for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. 1.3. All kind of soil Pipes, cables etc, exceeding 300 mm dia but not exceeding 600 mm dia.
[5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix)
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing, laying, Cutting and Jointing of DI Pipe 400mm dia (K-9) complete in all respect, but excluding cost of excavation complete in all respect to the entire satisfaction of the Engineer -in- Charge.
stage.html
html • 0.04 MB
technical_581647.pdf
techsummary_581647.pdf
finance_581647.pdf
BOQ Comparative Chart
xlsx
finsummary_581647.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_581647.xls
BOQ • 0.33 MB
corringendum23022026743.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .