Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 LAccepted-AOC | ₹36.2 L | L1 | Accepted-AOC The work has been awarded to Mr.Fridzy.G vide agreement no.24/EESBL/2025-26 dated 21.1.2026. |
| 2 | L2₹36.5 LRejected-Finance | ₹36.5 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 4 | Rejected-Technical TC 53 407 POTTAVILA KARAKKAMANDAPAM NEMOM P O TRIVANDRUM 695020 | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695020 | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | FRIDZY G L1 | SHAFEER.S L3 | S SAJEEV L2 | ROY V P R L4 |
|---|---|---|---|---|---|---|---|
| 1.00Providing CCTV Control room at Government Medical College Hospital | |||||||
| 1.00 | 15.25:Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 26.95 | sqm | 262.79 ₹7,082.19 | 257.6 ₹6,942.32 | 251.83 ₹6,786.82 | 255 ₹6,872.25 |
| 1.00 | OD209007/2025-2026:Dismantling mosaic work on wall including stacking materials with 50 m lead | 66.97 | sqm | 145.29 ₹9,730.07 | 142.4 ₹9,536.53 | 139.23 ₹9,324.23 | 120 ₹8,036.40 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 6.67 | cum | 2,031.08 ₹13,539.18 | 1,991 ₹13,272.01 | 1,946.39 ₹12,974.64 | 1,830 ₹12,198.78 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 93.37 | sqm | 72.35 ₹6,755.32 | 70.9 ₹6,619.93 | 69.33 ₹6,473.34 | 68 ₹6,349.16 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 21.17 | cum | 2,400.22 ₹50,817.46 | 2,352.88 ₹49,815.18 | 2,300.14 ₹48,698.56 | 2,316 ₹49,034.35 |
| 1.01 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | 42.5 | sqm | 125.1 ₹5,316.75 | 122.63 ₹5,211.78 | 119.89 ₹5,095.33 | 129 ₹5,482.50 |
| 1.01 | 26.31.1:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | 42.5 | sqm | 140.78 ₹5,983.15 | 138 ₹5,865 | 134.91 ₹5,733.68 | 138 ₹5,865 |
| 1.01 | 26.32.3:Providing, mixing and applying SBR polymer (of approved make) modified
Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with
polymer minimum 2% by wt. of cement used) as per specifications and
directions of Engineer-in-charge.
Note: Measurement and payment: The pre-measurement of thickness shall be
done just after the surface preparation is completed and Payment under this
item shall be made only after proper wet curing has been done and surface
has been satisfactorily evaluated by sounding / tapping with a blunt metal
instrument and/or the 75mm size cube crushing strength at the end of 28 days
to be not less than 30 N/Sqmm2).50 mm average thickness in 3 layers. | 42.5 | sqm | 1,220.92 ₹51,889.10 | 1,196.84 ₹50,865.70 | 1,170.01 ₹49,725.43 | 1,173 ₹49,852.50 |
| 1.01 | 6.4.2:Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 42.8 | cum | 10,624.65 ₹4.5 L | 9,716.24 ₹4.2 L | 9,498.44 ₹4.1 L | 9,660 ₹4.1 L |
Tender Value
₹40.8 L
EMD Value
₹50,000
Closing Date
11 Nov 2025, 5:00 pmClosed
Executive Engineer
Special Buildings Division Public Office Compound
DEPOSIT Providing CCTV Control room at Government Medical College Hospital Thiruvananthapuram Providing CCTV Control room at Government Medical College Hospital General Civil Work
2025_PWD_818251_1
PWD/BLDG/TR/19648/2024_5_1/RC1
Open Tender
Civil Works - Buildings
240 days
Special Buildings Division Public Office Compound
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
24 Feb 2026
3 Nov 2025
14 Nov 2025
3 Nov 2025
11 Nov 2025
3 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1371238.xls
BOQ • 0.29 MB
SBD.pdf
Tender Documents • 1.63 MB
epaymentform.pdf
Tender Documents • 0.05 MB
fot.pdf
Tender Documents • 0.25 MB
integritypact.pdf
Tender Documents • 0.03 MB
AFFIDAVIT.pdf
Tender Documents • 0.15 MB
Download all tender documents and submit your bid