Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹26.4 L+₹92,274.50 (3.62%)Admitted-Finance H NO 19 6 243 1 NGO S COLONY SHIV NAGAR NORTH BIDAR 585401 | BIDAR | KARNATAKA | 585401 | L2 | Admitted-Finance | |
| 3 | L3₹26.6 L+₹1.1 L (4.24%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹26.8 L+₹1.3 L (5.15%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹26.8 L+₹1.3 L (5.26%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s.Santosh Kotarki L7 | M/S RUDRAPPA CONSTRUCTIONS L8 | M/s Ateeq Ahteasham L1 | Siddique constructions L5 | Mr Madhusudhan Kotarki L3 | AMAR CONSTRUCTION L4 | SAYED MUSTAQ AHMED L6 | RAMESH CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00Schedules of Works | |||||||||||
| 1.00 | Demolition of Brick work or PCC solid block masonry built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facings dressed stone work and pre-cast concrete articles, complete, removal of debris outside MD land all as specified and as directed by Engineer-in-Charge. | 150 | CUBIC METRE | 400 ₹60,000 Lowest | 980 ₹1,47,000 | 800 ₹1,20,000 | 850 ₹1,27,500 | 875 ₹1,31,250 | 900 ₹1,35,000 | 850 ₹1,27,500 | 825 ₹1,23,750 |
| 2.00 | Demolition of plain cement concrete of any description and in any position not otherwise specifically provided for drain, complete, removal of debris outside MD land all as specified and as directed by Engineer-in-Charge.. | 37.5 | CUBIC METRE | 600 ₹22,500 Lowest | 860 ₹32,250 | 700 ₹26,250 | 725 ₹27,187.5 | 775 ₹29,062.5 | 800 ₹30,000 | 800 ₹30,000 | 725 ₹27,187.5 |
| 3.00 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for cover slabs and similar work complete, removal of debris outside MD land all as specified and as directed by Engineer-in-Charge. | 5 | CUBIC METRE | 800 ₹4,000 Lowest | 1,150 ₹5,750 | 1,000 ₹5,000 | 1,025 ₹5,125 | 1,150 ₹5,750 | 1,050 ₹5,250 | 1,100 ₹5,500 | 1,025 ₹5,125 |
| 4.00 | Material and labour for Plain cement concrete 100 mm thick 1:3:6 type C2 (20mm graded stone aggregate) as in sub base complete all as specified and directed. | 405.5 | SQUARE METRE | 400 ₹1,62,200 | 375 ₹1,52,062.5 | 300 ₹1,21,650 Lowest | 325 ₹1,31,787.5 | 330 ₹1,33,815 | 350 ₹1,41,925 | 345 ₹1,39,897.5 | 315 ₹1,27,732.5 |
| 5.00 | Material and labour for Plain cement concrete 1:2:4 type B0 (12.5mm graded stone aggregate) as in bed block/coping etc including necessary formwork complete all as specified and directed. | 17.1 | CUBIC METRE | 9,000 ₹1,53,900 | 8,400 ₹1,43,640 | 8,000 ₹1,36,800 Lowest | 8,100 ₹1,38,510 | 8,150 ₹1,39,365 | 8,200 ₹1,40,220 | 8,150 ₹1,39,365 | 8,150 ₹1,39,365 |
| 6.00 | Material and labour for Plain cement concrete 100mm thick 1:2:4 type B1 (20mm graded stone aggregate) and complete all as specified and directed. | 50 | SQUARE METRE | 600 ₹30,000 | 490 ₹24,500 | 400 ₹20,000 Lowest | 430 ₹21,500 | 410 ₹20,500 | 450 ₹22,500 | 430 ₹21,500 | 415 ₹20,750 |
| 7.00 | Material and labour for providing plain cement concrete 1:2:4 type B0 using 12.5 mm graded stone aggregate as in benching, edging, chamfering, etc complete all as specified and directed | 7.5 | CUBIC METRE | 7,000 ₹52,500 Lowest | 8,350 ₹62,625 | 8,000 ₹60,000 | 8,000 ₹60,000 | 8,150 ₹61,125 | 8,200 ₹61,500 | 8,200 ₹61,500 | 8,150 ₹61,125 |
| 8.00 | Extra for forming fair finished channel or drain 30cm inner girth in cement concrete using extra cement including mitered/stopped ends, forms mould etc, complete all as specified and directed | 375 | RUNNING METRE | 500 ₹1,87,500 | 110 ₹41,250 | 70 ₹26,250 Lowest | 85 ₹31,875 | 80 ₹30,000 | 80 ₹30,000 | 90 ₹33,750 | 90 ₹33,750 |
| 9.00 | M&L for sand cushioning filling under floor including watering and consolidation complete all as specified and directed. | 14.98 | CUBIC METRE | 2,000 ₹29,960 | 350 ₹5,243 Lowest | 2,000 ₹29,960 | 2,250 ₹33,705 | 2,250 ₹33,705 | 2,100 ₹31,458 | 2,200 ₹32,956 | 2,025 ₹30,334.5 |
Tender Value
₹27 L
EMD Value
₹54,000
Closing Date
8 Sept 2026, 6:00 pmClosed
Garrison Engineer (Air Force) Bidar
Garrison Engineer (Air Force) Bidar, Military Engineer Services, Air Force Station Bidar, Bidar-585401
REPAIRS/ MAINTENANCE TO DRAINAGE SYSTEM, CULVERTS ETC AND CONNECTED ITEMS AT AFS BIDAR UNDER GE(AF) BIDAR
2026_MES_784857_1
CA NO. GE(AF)/BID/TOKEN/ 40 OF 2026-2027 8265/E8
Open Tender
Civil Works
Item Rate
180 days
BIDAR
As per NIT
8 documents required · 8 mandatory
₹500
Garrison Engineer (Air Force) Bidar
₹54,000
Yes
23 Sept 2026
18 Aug 2026
15 Sept 2026
18 Aug 2026
8 Sept 2026
1 Sept 2026
18 Aug 2026 - 31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Schedules of Works | - | - | - | - |
| 1 | Demolition of Brick work or PCC solid block masonry built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facings dressed stone work and pre-cast concrete articles, complete, removal of debris outside MD land all as specified and as directed by Engineer-in-Charge. | 150 | CUBIC METRE | - | - |
| 2 | Demolition of plain cement concrete of any description and in any position not otherwise specifically provided for drain, complete, removal of debris outside MD land all as specified and as directed by Engineer-in-Charge.. | 37.5 | CUBIC METRE | - | - |
| 3 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for cover slabs and similar work complete, removal of debris outside MD land all as specified and as directed by Engineer-in-Charge. | 5 | CUBIC METRE | - | - |
| 4 | Material and labour for Plain cement concrete 100 mm thick 1:3:6 type C2 (20mm graded stone aggregate) as in sub base complete all as specified and directed. | 405.5 | SQUARE METRE | - | - |
| 5 | Material and labour for Plain cement concrete 100 mm thick 1:2:4 type B0 (12.5mm graded stone aggregate) as in bed block/coping etc including necessary formwork complete all as specified and directed. | 17.1 | CUBIC METRE | - | - |
| 6 | Material and labour for Plain cement concrete 100mm thick 1:2:4 type B1 (20mm graded stone aggregate) and complete all as specified and directed. | 50 | SQUARE METRE | - | - |
| 7 | Material and labour for providing plain cement concrete 1:2:4 type B0 using 12.5 mm graded stone aggregate as in benching, edging, chamfering, etc complete all as specified and directed | 7.5 | CUBIC METRE | - | - |
| 8 | Extra for forming fair finished channel or drain 30cm inner girth in cement concrete using extra cement including mitered/stopped ends, forms mould etc, complete all as specified and directed | 375 | RUNNING METRE | - | - |
| 9 | M&L for sand cushioning filling under floor including watering and consolidation complete all as specified and directed. | 14.98 | CUBIC METRE | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
8265Tender.pdf
Tender Documents • 0.98 MB
BOQ_879472.xls
BOQ • 16.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .