Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
7 Sept 2026, 4:00 pm
Executive Engineer REW Rajouri
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Refer to NIT
2026_RDPR_321332_54
e-NIT No. 60 REW Rajouri of 2026 Dated 20-08-2026
Open Tender
Civil Works
Percentage
90 days
RAJOURI
Refer to BOQ
2 documents required · 2 mandatory
₹300
Revenue Head
₹4,000
20 Aug 2026
20 Aug 2026
8 Sept 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 2.57 | cum | 479.3 | ₹1,231.8 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.11 | cum | 4,826.5 | ₹5,357.42 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 2.3 | cum | 5,733.6 | ₹13,187.28 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level (in RCC 1:1.5:3) | 2.68 | cum | 7,788.4 | ₹20,872.91 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete | 21.56 | sqm | 286.35 | ₹6,173.71 |
| 6 | Edge of slab: Under 20 cms Wide | 19.51 | Rm | 262.2 | ₹5,115.52 |
| 7 | Soffit of slab: Suspended Floors | 7.85 | Sqm | 718.2 | ₹5,637.87 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 214.6 | Kg | 123.2 | ₹26,438.72 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6coarse sand) el | 7.39 | cum | 7,571.55 | ₹55,953.75 |
| 10 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | - | cum | 1,455.65 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_1074913.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].