Loading…
Loading…
Tender Value
₹5.1 L
EMD Value
₹6,000
Closing Date
15 Jun 2026, 6:00 pm
Executive Engineer R and B Division Modasa
Renovation, Alteration & Modification Work at Office of the Geology & Mining Dept. Modasa Dist.: Arvalli (2nd Attempt)
311139
Nivida No.01 of 2026-27
Open
Civil Works - Others
Arvalli
7 documents required · 4 mandatory · 3 optional
₹900
ExecutiveEngineer, R & B Division, Modasa
₹6,000
4 Jun 2026
4 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
Item Rate In
(with brief specification and reference to book of Quantity Unit Amount
No. figures
specifications)
1 CUPBOARD WITH GLASS PROFILE SLIDER 48.00 8289.07 Sqmt
SHUTTER AND LAMINATE FINISH
Providing fixing, installation at site. Side and back
storage unit 450 deep made out of 18/12/8mm thick
plywood IS 710 grade where ever required as per
drawing with vertical and horizontal devisions as per
design with drawers and 8mm thick Glass Profile
Slider shutters, lockable with all handware like auto
hinges, tower bolt, magnetics catcher, handle and
lock of approved quality. The cabinet should be
raised 75/100mm above floor. Inside 1 MM thickness
balancing laminate. Exposed outside surface
finished with 1MM thickness standard grade laminate
of approved design and make. All exposed edges
finished with first quality Teakwood biddings to be
finished in melamine polishing as per drawing and
direction of engineer in charge.
2 Providing and installation of linear workstation having 10.00 5575.20 Rmt
approx size 1200 (L) x 720 (D) x 750/1200 MM (H) of
partition, comprising of MS powder coated partition
panels of thickness 60 mm(double skinned system),
with powder coated MS frames inside of 16 guage.
Infills are of partical board with cladding of 9mm thk
particle board tiles on both sides. Fascia/surface of
the panel can be given in fabric/soft board/ white
board/half glass. All exposed profiles, connectors are
in powder coated aluminium. The horizontal bottom
of each panel will be given with an inbuilt wire
management system of 100mm ht covered by MS
powder coated raceway panel. A pair of Level
adjusters are provided with each panel. All worktops
are in 25mm thk prelaminated MDF with edge lipping
& vertical legs are in 18mm thk prelaminated MDF
with lipped edges. Along with metal cpu trolly and
metallic key board tray (ebco make). Each work
station should be provided with modular Electrical
fittings with 3 switch and 3 sockets, and One LAN
point at the down part of work station (No
extra/additional cost will be paid for conduit, wireing
CAT-6 etc. Contractor should provide all necessary
installation, commissioning etc. The quoting price
should be inclusive of all types of taxes & duties
packing, forwarding, loading, unloading, installaion.
As per detail drawing & choice of users department
and Concern officers in charge as directed by the
engineer in charge.
Description of Item
Item Rate In
(with brief specification and reference to book of Quantity Unit Amount
No. figures
specifications)
3 Providing & fixing Frameless Toughen Glass door 10.50 5497.43 Rmt
having 12mm thick Clear Toughen with horizintal
Itching Pattern with 30cm Hight SS 304 Handle with
Fixtures and Fastening as directed by engineer
incharge. Complete.
Total Rs.
Rupees Five Lakh Eleven Thousand Three Hundred Fifty and Paisa ThirtySeven Only
I / We am / are willing to carry out the work at ________________________________% above / below
percent (should be written in figure and words) of the estimated rate mentioned above. Amount of my / our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct_________% Below Add_________% Above
Net Rs.__________________ Net Rs.__________________
In words __________________ In words __________________
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
R.& B. Sub Division R.& B. Division
Modasa Modasa
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book 2023 Reno.Work at Office of the Geology And Mining Dept.pdf
BOQ - Reno. Work at Office of the Geology and Mining Dept Modasa.pdf
Details Speci. Reno. Work at Office of the Geology and Mining Dept.pdf
General Specification - State.pdf
GR - 1.pdf
GR - 2.pdf
Speci. Index - Reno. Work at Office of the Geology and Mining Dept.pdf
Work Details - Reno. Work at Office of the Geology and Mining Dept.pdf
Download all tender documents and submit your bid