| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.58Accepted-AOC VPO GANGANA NEAR RAVIDAS MANDIR 131302 | SONIPAT | HARYANA | 131302 | L1 | Accepted-AOC L1 AGENCY WORK ALLOTED | |
| 2 | L2₹14.6 L+₹97,936 (7.21%)Rejected-Finance | L2 | Rejected-Finance L2 CANNOT BE ACCEPTED | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹26,000
Closing Date
3 Jun 2021, 1:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PD 1 SONEPAT
Construction of Internal Road AND Earth Filling in Campus of Judicial Complex at Gohana in Sonepat Distt
2021_HRY_172928_1
PWD/2263
Open Tender
Civil Works
Works
90 days
SONEPAT CIRCLE
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹26,000
Yes
30 Jun 2021
25 May 2021
3 Jun 2021
25 May 2021
3 Jun 2021
25 May 2021
Amount
Construction of embankment, sub grade and shoulders of new road portion with soil of minimum CBR (4 days soaked) of 8% obtained from borrow pit with all lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The finished road surface will be as per X-section approved by employer with respect to GTS. At no place top of sub grade of raised road will be less than 0.90 m above adjoining NSL. NSL for a block of 100m will be worked as mean of 6 levels taken on 20 m center to center length of road. These six levels are at three location on both side one at edge ROW. Other at 5 m and 10 m away from ROW. In case the quantity of earth work calculated with NSL and finished level found to be less than 6549.50 cum. Then actual quantity (less than 6549.50 cum) will be paid. In case quantity worked out is more than 6549.50cum, then only 6549.50 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached at section 9 of DNIT. Note: If soil of CBR 8% is not available then the agency will do appropriate stabilization as per IRC –SP-89-2010 as approved by SE-in-Charge and nothing extra shall be paid on this account and it will be incidental to work. No earth work will be allowed from PWD land.
Preparation of sub grade including trenching, rough dressing of spoil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1)
Providing & laying 75mm thick (Compacted) stone metal (G-I) 63 to 45mm gauge wearing coat to Water Bound Macadam using screening type 'B' compacting with 3 wheeled steel roller/vibratory roller to achieve the desired density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications of road & bridges (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respect. (N.S.) Note: - 1. Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing & laying 75mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1. Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing and laying first coat surface dressing, including rolling with road roller etc. complete including cost of bitumen VG-10 grade using aggregate 13mm nominal size 1.00 cum and bitumen VG-10, 0.10 MT per hundred square metre. Clause 509 of MoRT&H specification.(5th edition ) 2013 (NS).
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. on the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing and laying 30 mm compacted thickness of Bituminous Concrete (BC) in one layer with 100 - 120 TPH Batch Type Hot Mix Plant with bituminous binder VG-30 @ 5.4% (minimum) and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher having sufficient screed width so that the BC in full width of the carriage way is laid in single opration without any longititutinal joint with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and with pneumatic tyred roller (PTR) of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa and tandem rollers to achieve the desired compaction as per MORT&H specification (Vth revision)-2013 Clause No. 507 complete in all respect. If bitumen required is more than 5.4% as per job mix including waste plastic material no extra payment will be made, Extra bitumen required will be considered as incidental to work. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note: - Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked , antitermite as required at site , into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches , if required , Jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and with end dowels filled with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No 29.38,29.44,29.45 & 29.46) including cartage , loading and unloading complete in all respects. Note: - Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
CONSTRUCTION OF RECTANGULAR STANDARD BRICK MASONRY MANHOLE CHAMBERS to standard drawings on new Egg-shaped sewers upto the required depth in 1:5 CEMENT SAND MORTAR, LIME CONCRETE 40 percent lime mortar With 19-20 mm gauge brick ballast in haunches above the arch ring where the depth of cover in traffic streets is LESS THAN 1.5 METRES, 12 MM THICK WATER TIGHT 1:2 CEMENT SAND PLASTER WITH A FLOATING COAT OF NEAT CEMENT and finished with two coats of sodium silicate on INTERIOR SURFACE where required, reinforced cement concrete slab 180 mm THICK FIXING 560 mm INTERNAL DIAMETER C.I MANHOLE FRAME AND COVER weight not less than 2.5 quintal painted with 3 COATS OF BLACK BITUMEN PAINT, fixing galvanised malleable iron steps embedded in 1:2 cement sand mortar etc., complete. The rate also covers the cost of M.S. steel for R.C.C slab.labour for fixing and carriage of C.I manhole frame and cover and malleable iron steps from the stores of the Engineer-in-charge of the works to site of works. The rate further includes cost of accurately planned and fitted Centring, supports for all works, as well as for all curves and specials work cleaning out their beds, etc. sodium silicate shall be supplied free of cost at the stores of Engineer-in-charge. The rate further includes cost of accurately planned and fitted Centring, supports for all works, as well as for all curves and specials work cleaning out their beds, etc. sodium silicate shall be supplied free of cost at the stores of Engineer-in-charge (HSR 29.89 a) for 2.40 metres depth below ground level
Pdg. & fixing of main hole cover complete in all respect as per direction of Engineer-in-charge (NS) Note:- i) In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR, the unit and nomenclature given in HSR shall be applicable. ii) In case of any difference in the unit of any non-schedule items depicted in this DNIT and the conventional unit of that N.S. item as per prectice in this department, the conventional unit as per practice shall be applicable.
The Khusi Coop. Society Gohana
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .