| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAccepted-AOC AT SINGH SAHI PO TALCHER TOWN DIST ANGUL 759107 | TALCHER | ANGUL | ODISHA | 759107 | ₹30.7 L | L1 | Accepted-AOC Work Order. |
| 2 | L1₹30.7 LRejected-AOC | ₹30.7 L | L1 | Rejected-AOC 2nd lowest. |
| 3 | L1₹30.7 LRejected-AOC AT BANIABAHAL WARD NO 09 PO HULURISINGHA DIST ANGUL 759122 | ANGUL | ANGUL | ODISHA | 759122 | ₹30.7 L | L1 | Rejected-AOC 2nd lowest. |
Tender Value
₹30.7 L
EMD Value
₹31,000
Closing Date
20 Feb 2026, 5:30 pmClosed
S.E, RWSS Division, Angul at Talcher
At.- Baghuabole, Hatatota. Talcher, Angul
PWS to village Lingrajodi under Angul Block. (including OM 5Years)
2026_RWSS_124792_2
16/SE/RWSS/2025-26 Dt. 06.01.2026
National Competitive Bid
Civil Works - Water Works
Percentage
180 days
Angul
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹31,000
Yes
2 May 2026
9 Feb 2026
21 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
9 Feb 2026 - 16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION PUMP HOUSE : Earth work in excavation of foundation in all kinds soil within initial lead of 50mts.& lift of 1.50mts. including dressing and levelling the bed etc.complete. | 15.35 | Cum | 299.56 | ₹4,598.25 |
| 2 | Filling foundation & plinth with sand including cost of all labour, materials, carriage, royality, watering and ramming etc. complete. | 6.25 | Cum | 720.65 | ₹4,504.06 |
| 3 | C.C.(1:4:4) in foundation using 4cm.size H.G.C.B. metal including cost of all labour, materials, carriage, royality, curing etc. complete. | 3.03 | Cum | 6,186.55 | ₹18,745.25 |
| 4 | Fly Ash Brick masonry in C.M.(1:6) in F&P including cost of all labour, materials, carriage, royality, etc. complete | 10.3 | Cum | 6,016.47 | ₹61,969.64 |
| 5 | Fly Ash Brick masonry in C.M.(1:6) in Super Structure including cost of all labour, materials, carriage, royality, etc. complete | 10.26 | Cum | 6,049.8 | ₹62,070.95 |
| 6 | 12mm. thick C.P.(1:4) with punning and bitumen painting including cost of labour ,materials, carriage, royality, curing and T&P etc. complete. | 4.91 | Sqm | 229.18 | ₹1,125.27 |
| 7 | Filling Foundation and plinth with excavated materials including cost of all labour, T & P etc. complete. | 5.12 | Cum | 166.42 | ₹852.07 |
| 8 | Rigid smooth centering and shuttering for R.C.C. works including false work and dismantling them after casting, cost of all labour, materials, T & P etc. complete. i.Roof slab & RCC Chajja | 26.47 | Sqm | 809.44 | ₹21,425.88 |
| 9 | Plinth Band | 5.73 | Sqm | 269.41 | ₹1,543.72 |
| 10 | Lintel | 4.28 | Sqm | 611.95 | ₹2,619.15 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_576676.xls
BOQ • 0.28 MB
DTCN_Lingara.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .