Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-AOC | ₹15.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.2 L+₹3,352.42 (0.22%)Rejected-Finance VILL P O GANESHPUR 1ST GHERI P S HARDWOOD POINT COASTALKAKDWIP SOUTH 24 PARGANAS PIN 743347 | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | 743347 | ₹15.2 L+₹3,352.42 (0.22%) | L2 | Rejected-Finance L2 |
| 3 | L3₹15.2 L+₹3,504.80 (0.23%)Rejected-Finance | ₹15.2 L+₹3,504.80 (0.23%) | L3 | Rejected-Finance L3 |
Tender Value
₹15.2 L
EMD Value
₹30,477
Closing Date
14 Feb 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, KAKDWIP IRRIGATION DIVISION
Irrigation Waterways Directorate Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas
M/R to damaged of 8 no H.P sluice over different khal at different mouza under Mousuni Irrigation Sub-Division of Kakdwip Irrigation Division within block-Namkhana
2026_IWD_995971_27
WBIW/EE/KIDIVISION/e-NIT- 17 (e)/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
MOUSUNI
Please refer Tender documents.
4 documents required · 4 mandatory
₹30,477
Yes
25 Aug 2026
31 Jan 2026
16 Feb 2026
31 Jan 2026
14 Feb 2026
31 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out old existing unservicable damaged gate shutter of canal/ river completely after disengaging from hoisting system completely for installation of new gate shutter. The work includes cutting of gates into suitable pieces by gas cutting, removing the same by mechanical means or suitable crane, stacking all the pieces at the suitable place or as directed by the Engineer in charge upto a lead of 1000 m. The cost includes cost of man power employed for dismantling and cost of consumables like oxygen, accetylene gas, welding rod, hire charges of machineries, like chain pulley block, gas set, grinding machine, welding set, tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading. The cost of complete dismantling of hoisting system & cost of old unservisable materials handed over to departmental godown including loading & unloading will be provided extra
a) Gate shuteer size upto 4.00 sq.m | 1 | Kg. | 7.01 | ₹7 |
| 2 | Supplying, fitting and fixing at site Cast Iron flap shutter for hume pipe sluice with Cast Iron collar and other fittings etc. complete (as per drawing & direction of Engineer-in-charge)including casting the same, necessary drilling etc with carriage to site complete. The Cost includes cost of Materials, Machinaries , Manpower, Cutting,ligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification
(without painting). | - | kg. | 169.24 | - |
| 3 | Fabrication , Supply, erection and commissioning of new Slide type vertical lift regulator service gates of Canal/River as per IS: 5620 - 2000/Latest Revision consisting of skin plate, vertical and horizantal grider, stiffener etc. made of MS material consisting of angle , channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction including cost of Materials, Machinaries , Manpower, Cutting, ligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification (without painting). | - | kg | 154.93 | - |
| 4 | Cost for supplying and fifling fixing of Flat rubber seal (Make : Universal Moulders & Engineer/Popular Rubber Works (Pvt) Ltd/ S B Industries/Unique Polymer Works/equivelant approved make conforming to lS : 11855 -2011/Latest Revision) for different types of gate shutter as per direction of E.I.C. The cost includes cost of man power employed for fitting fixing, cost of rubber seal, hire charges of tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading but excluding supply of ms clamp/ flat plate, bolts, nuts and washer.
a) 65mm x 6 mm. | 1 | RM | 1,016.61 | ₹1,015.59 |
| 5 | Supply, installation, testing and commisioning of following items for hoisting system and gear box as mentioned below as per direction including cost of Materials, Machinaries , Manpower, Cutting, Machining, ligning, nchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting)
xvi) Bush(GM) | - | Kg. | 1,612.51 | - |
| 6 | Supplying, fifling & fixing M.S fabricated wheel in the screw hoisting system for lifting or lowering the draw shutter.The wheel consisting of suitable size ms hub to accomodate any size of G.M/C.I nut. The rim and four nos arm of wheel are made of 25mm. to 36mm. dia m.s rod complete as per direction of the Engineer-in-charge. The cost includes cost of materials, man power employed for dismantling and fitting fixing, consumables like cutting tools, welding rod, hire charges of machineries, like bending machine, lathe machine, grinding machine welding set, tools & tackles etc including carriage loading & unloading
(a) upto 60 cm dia. MS wheel. | - | Kg | 162.08 | - |
| 7 | Supplying fitting and fixing M/S fabricated pedestal stool of suitable size consisting of bottom plate, top plate, four nos. legs etc.fabricated with suitable sizes m.s. plate, m.s. angle conforming to IS 2062 of latest revision as per approved drawing and direction of Engineer in charge. The cost includes cost of materials, man power employed dismantling and fitting fixing civil works consumbles like cutting tools, gas, oxygen, welding rod anchor bolt of required size hire charges of machineries like gas cutting set, welding set, tools and tackles etc. including carriage loading and unloading | - | Kg | 172.81 | - |
| 8 | Supplying, fifling & fixing of screw rod having square thread of 1.5/2 T.P.I, Material bright steel [EN-8/EN9/forged Cl-4 (45C8) as per IS :1875 1992/latest Revision]. dia and thread length as required and providing with a drilled hole of required dia on the other end after flattened and supplying with one no. bolt and nut of required size and all other components as required as per direction of Engineer-In
- Charge. The cost includes cost of material, man power employed, consumables like cutting tools, emery paper, cloths, , hire charges of machineries, tools & tackles, grease, mobil etc including carriage
loading & unloading as per direction of Engineer in charge.
a) upto length 3 metre. | 1 | Kg. | 179.96 | ₹179.78 |
| 9 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | - | %cum. | 22,927.85 | - |
| 10 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation | - | %cum. | 9,241.22 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
Tendernotice_2.pdf
PDF • 1.01 MB
BOQ_2437876.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .