Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC DASPARA HABITATION OMPI NAGAR VILLAGE COUNCIL OMPI BAC GOMATI TRIPURA | OMPI | GOMATI | TRIPURA | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.7 L+₹67,523.03 (4.50%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹16.3 L+₹1.3 L (8.85%)Rejected-AOC CANARA BANK RAJARBAG UMC UDAIPUR GOMATI TRIPURA PIN 799120 | GOMATI | TRIPURA | 799120 | L3 | Rejected-AOC L3 | |
| 4 | L4₹16.3 L+₹1.3 L (8.87%)Rejected-AOC KSHIRODE SEN LANE JOYNAGAR AGARTALA TRIPURA PIN 799001 | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | L4 | Rejected-AOC L4 | |
| 5 | L5₹17.7 L+₹2.7 L (17.8%)Rejected-AOC CENTRAL ROAD AGARTALA | L5 | Rejected-AOC L5 |
Tender Value
₹21.8 L
EMD Value
₹43,564
Closing Date
21 Aug 2026, 3:00 pmClosed
EE, TWD
O/o the Directorate of TWD
Renovation of the Composited office Building for ST SC OBC and Minority at Lake chowmuhani Agartala SH Repairs to plaster Painting water supply and sanitary installation surface Drain Plinth Protection etc and other allied work during the year 26 27
2026_DTWJD_75922_1
06/DNIeT/EE/TWD/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Agartala
Please refer to DNIeT
4 documents required · 4 mandatory
₹1,000
₹43,564
12 Oct 2026
15 Aug 2026
21 Aug 2026
15 Aug 2026
21 Aug 2026
15 Aug 2026
15 Aug 2026 - 20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or pointing, raking out joints,cleaning and preparing the surface for re-plasteringor re-pointing including disposal of rubbish to thedumping ground with all leads and lifts etc.completeas per direction of the Engineer- in-charge. | 0.6 | sqm | 30.1 | ₹18.06 |
| 2 | Cutting holes of required size in brick masonry wall forfixing of exhaust fan including providing and fixing 300mm dia PVC pipe conforming BIS-12818 and makinggood the same etc. complete as per direction ofEngineer-in-charge. | - | each | 218.6 | - |
| 3 | Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means over areas (exceeding 30cm indepth, 1.5m in width as well as 10 sqm on plan) includingdisposal of excavated earth, lead upto 50m and lift upto1.5m, disposed earth to be levelled and neatly dressed.-All kinds of soil | - | cum | 179.9 | - |
| 4 | Filling available excavated earth (excluding rock) intrenches, plinth, sides of foundations etc. in layers notexceeding 20cm in depth, consolidating each depositedlayer by ramming and watering, lead up to 50 m and liftupto 1.5 m.-All kinds of soil | - | cum | 161.3 | - |
| 5 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | Cum | 1,177.3 | - |
| 6 | Providing and laying in position cement concrete ofspecified grade excluding the cost of centring andshuttering -1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brickaggregate 40 mm nominal size) | - | Cum | 9,295.7 | - |
| 7 | Providing and laying in position cement concrete ofspecified grade excluding the cost of centring andshuttering -1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brickaggregate 20 mm nominal size) | - | Cum | 10,742.6 | - |
| 8 | First class brick work in foundation and plinthincluding cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | Cum | 9,845.2 | - |
| 9 | Half brick masonry work with first class bricks infoundation and plinth including cost of all materials asrequired complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | sqm | 1,311.8 | - |
| 10 | Providing and fixing M.S. grills of required pattern inframes of windows etc. with M.S. flats, square orround bars etc. all complete.Fixed to steel windows by welding | - | kg | 161.5 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
DNIeT.pdf
Tender Documents • 2.77 MB
BOQ_77280.xls
BOQ • 0.33 MB
Additional_Tender_Documents.pdf
Additional Documents • 2.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .