Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹4.0 L+₹30,577.92 (8.25%)Accepted-AOC | ₹4.0 L+₹30,577.92 (8.25%) | L2 | Accepted-AOC As per order Number 135/97/Co-op dated 13.11.97 item number 8.b (i) the second lowest bidder consider as the lowest bidder |
| 2 | L1₹3.7 LRejected-AOC | ₹3.7 L | L1 | Rejected-AOC As per order Number 135/97/Co-op dated 13.11.97 item number 8.b (i) the second lowest bidder consider as the lowest bidder |
| 3 | L3₹4.7 L+₹98,565.87 (26.6%)Rejected-Finance VAIKOM RANNI P O 689 672 KERALA | PATHANAMTHITTA | KERALA | 689672 | ₹4.7 L+₹98,565.87 (26.6%) | L3 | Rejected-Finance Second Lowest bidder |
| Sl No | Description | Qty | Unit | Ranny Taluk Labour Contract Co-operative SocityLtd L3 | NAJIM T K L1 | SECRETARY L2 |
|---|---|---|---|---|---|---|
| 1.00Detailed estimate | ||||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 47.25 | cum | 396 ₹18,711 | 314.03 ₹14,837.92 Lowest | 339.93 ₹16,061.69 |
| 1.02 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 47.25 | cum | 4,393 ₹2,07,569.25 | 3,486 ₹1,64,713.5 Lowest | 3,773.81 ₹1,78,312.52 |
| 1.03 | 7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 21.26 | cum | 9,199 ₹1,95,598.34 | 7,283.8 ₹1,54,875.44 Lowest | 7,884.59 ₹1,67,650.04 |
| 1.04 | 13.33.1
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 47.25 | sqm | 450 ₹21,262.5 | 349.61 ₹16,519.07 Lowest | 378.44 ₹17,881.29 |
| 1.05 | 13.37.1
White washing with lime to give an even shade:New work (three or more coats) | 141.75 | sqm | 50 ₹7,087.5 | 35.49 ₹5,030.71 Lowest | 38.42 ₹5,446.04 |
| 1.06 | 13.1.2
12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | 47.25 | sqm | 400 ₹18,900 | 308.7 ₹14,586.08 Lowest | 334.16 ₹15,789.06 |
Tender Value
₹5.0 L
EMD Value
₹12,525
Closing Date
7 Jul 2026, 6:00 pmClosed
Divisional Forest Officer Konni
Divisional Forest Officer Konni
Estimate for the cost of Construction of Retaining Wall in Konni Ecotourism Center Under Konni Range during 2026-27
2026_FD_858294_1
KND-2066540/26
Open Tender
Civil Works - Others
Item Rate
180 days
konni
Please Refer Tender Notice
8 documents required · 8 mandatory
₹1,190
Yes
₹12,525
Yes
10 Sept 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed estimate | |||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.02 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.03 | 7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.04 | 13.33.1
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | - | sqm | - | - |
| 1.05 | 13.37.1
White washing with lime to give an even shade:New work (three or more coats) | - | sqm | - | - |
| 1.06 | 13.1.2
12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
e_payment.pdf
Other Document • 0.01 MB
Declaration.pdf
Other Document • 0.01 MB
TD2066540.pdf
Tender Documents • 1.13 MB
preliminaryagreement.pdf
Other Document • 0.24 MB
BOQ_1450918.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .