| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 LAccepted-AOC | ₹8.1 L | 1 | Accepted-AOC Lowest rate and hence the work will be awarded to the Contractor |
| 2 | 2₹9.4 LRejected-AOC | ₹9.4 L | 2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | STALIN V V L2 | John M.K L1 |
|---|---|---|---|---|---|
| 1.00Appendix 1 | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 40 | sqm | 20.19 ₹807.60 | 17.35 ₹694 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | 285.96 ₹171.58 | 245.78 ₹147.47 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.6 | cum | 8,805.5 ₹5,283.30 | 7,567.98 ₹4,540.79 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 72 | sqm | 428.63 ₹30,861.36 | 368.4 ₹26,524.80 |
| 1.00 | 5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars | 1,539.45 | kg | 123.8 ₹1.9 L | 106.4 ₹1.6 L |
| 1.01 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 26.25 | cum | 10,834.51 ₹2.8 L | 9,311.82 ₹2.4 L |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 7.57 | cum | 4,432.74 ₹33,538.11 | 3,809.76 ₹28,824.64 |
| 1.01 | 60.5.2:DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 2m long (1m in rock and 1m in concrete ) including drilling holes of 20mm dia to a depth of 1m in rock and filling the gap with cement grout( 0.10kg/each) etc complete. | 125 | each | 608.96 ₹76,120 | 523.38 ₹65,422.50 |
| 1.01 | OD37152/2025-2026:Forming frame work by supplying and driving down full round coconut pile of dia minimum 25 cm including all hire and labour charges for fixing , staging platform and all other appliances necessary for pile driving after pointing the bottom end and side covered by net/mat and cross braising with 5mm- 4 mm steel wire etc complete as per the direction of departmental officers at site | 20 | metre | 8,216.5 ₹1.6 L | 7,061.76 ₹1.4 L |
Tender Value
₹8.5 L
EMD Value
₹21,157
Closing Date
5 Jan 2026, 1:00 pmClosed
Assistant executive engineer
Assistant executive engineer, Head works sub division peechi
GENERAL-PSM 2025-26-Rectification of Flood Damages in Puthur Branch Canal in between Ch. 04/000 km to 05/300 km-General Civil Work
2025_Irrig_823221_2
IRR/IA/TR/2523/2025_5_16_15/1
Open Tender
Civil Works - Canal
240 days
Mannamangalam
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,870
Yes
₹21,157
Yes
24 Jan 2026
29 Dec 2025
6 Jan 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
Amount
Appendix 1
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.5.2:DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 2m long (1m in rock and 1m in concrete ) including drilling holes of 20mm dia to a depth of 1m in rock and filling the gap with cement grout( 0.10kg/each) etc complete.
OD37152/2025-2026:Forming frame work by supplying and driving down full round coconut pile of dia minimum 25 cm including all hire and labour charges for fixing , staging platform and all other appliances necessary for pile driving after pointing the bottom end and side covered by net/mat and cross braising with 5mm- 4 mm steel wire etc complete as per the direction of departmental officers at site
OD29879/2025-2026:Supplying and laying earth filled cement bags to lines and levels including cost of cement bags ,charges for filling ,tying ,laying in position ,all lead and lifts and incidental charges etc. complete as directed by the departmental officers at site
STALIN V V (BID ID -2451829)
Bidder Name
John M.K
STALIN V V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1382004.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.73 MB
Epaymentform.pdf
Tender Documents • 0.01 MB
PreliminaryAgreement.pdf
Tender Documents • 0.50 MB
Integritypact.pdf
Tender Documents • 0.01 MB
FormofTenderandaffi.pdf
Tender Documents • 0.03 MB
BOQ_1382004.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid