Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | L1 | Accepted-AOC Selected through transparent lottery system | |
| 2 | L1₹6.8 LRejected-AOC AT KANTIKA PO SYAMSUNDARPUR BLOCK DHAMANAGAR PS DHUSURI DIST BHADRAK PIN 756119 | KANTIKA | BHADRAK | ODISHA | 756119 | L1 | Rejected-AOC Not Selected in transparent lottery system | |
| 3 | L1₹6.8 LRejected-AOC | L1 | Rejected-AOC Not Selected in transparent lottery system | |
| 4 | L1₹6.8 LRejected-AOC NOT AVAILABLE | L1 | Rejected-AOC Not Selected in transparent lottery system | |
| 5 | L1₹6.8 LRejected-AOC | L1 | Rejected-AOC Not Selected in transparent lottery system |
Tender Value
₹6.8 L
EMD Value
₹6,780
Closing Date
17 Jun 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Divisional Officer
RURAL WORKS DIVISION NO.II, BHADRAK
PWD Road To Jayantira_Road_CC Over laying _1.200 to 1.400
2026_CERWI_131630_1
TCN-04 of 2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Bhadrak
2 documents required · 2 mandatory
₹4,000
₹6,780
Yes
12 Oct 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
9 Jun 2026 - 17 Jun 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lead and lifts, transporting to site by mechanical means within a lead of 5 km., spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H specifications etc. complete. | 27.28 | Cubic Meters | 206.5 | ₹5,633.32 |
| 2 | Cement Concrete (1:3:6) in foundation and plinth using 40mm size HBG metal including cost, conveyance, royalty and taxes etc. complete with shoring dewatering etc. complete. | 3.56 | Cubic Meters | 5,184.7 | ₹18,457.53 |
| 3 | Labour for cutting,bending,binding M.S Rod for R.C.C work including placing in position and cost of M.S.Rod & binding wire etc. cpomplete. | 6.82 | Quintal | 9,531.37 | ₹65,003.94 |
| 4 | Cement Concrete (1:1.5:3) with 20 mm size & down graded h.g. chips including
cost, conveyance, royality and all labour charges etc complete. | 69.75 | Cubic Meters | 8,443.5 | ₹5,88,934.13 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.63 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_595655.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .