Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | ₹10.9 L | L1 | Admitted-Finance |
| 2 | L2₹11.0 LAdmitted-Finance 140 1 110 N S C BOSE ROAD REGENT PARK KOLKATA WEST BENGAL 700040 | KOLKATA | KOLKATA | WEST BENGAL | 700040 | ₹11.0 L | L2 | Admitted-Finance |
| 3 | L3₹11.0 LAdmitted-Finance | ₹11.0 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R .D ENTERPRISES L3 | SIMPLE ENGINEERING AND CO. L1 | S S ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00 | ENGAGEMENT OF THREE (03) NOS. OPERATORS (SKILLED
CATEGORY) IN 3 SHIFT DURING 24 HRS. HAVING ABILITY OF FAULT-FINDING AND CAN PERFORM MINOR REPAIRING WORKS CONNECTED WITH THE WOODEN PYRES, WATER CIRCULATION, SLURRY WATER DISCHARGE SYSTEM INCLUDING DAMPER, ID FAN & PUMP-MOTOR OPERATION. | 12 | Monthly | 49,600 ₹5,95,200 | 49,030 ₹5,88,360 | 49,400 ₹5,92,800 |
| 2.00 | ENGAGEMENT OF ONE (01) NOS. SWEEPER FOR SWEEPING THE WHOLE WOODEN PYRES AREA, CLEANING THE DRAIN, SPRADING DISINFECTANT ETC. (ALL SWEEPING MATERIAL SUPPLIED BY THE CONTRACTOR). | 12 | Monthly | 13,220 ₹1,58,640 | 13,047 ₹1,56,564 | 13,300 ₹1,59,600 |
| 3.00 | PROPORTIONATE CASUAL LEAVE IMPOSED AS PER MPL. SECRETARY'S CIRCULAR NO.23 OF 2012-13 DT. 10.12.12 VIDE THE MIC ITEM NO.M 39.7 DT.14.08.12 ADDING THE TOTAL WAGES AMOUNT 4.53% OF SL. NO. [1]+[2] | 0.05 | ONE ITEM | 7,53,840 ₹34,148.95 | 7,44,924 ₹33,745.06 | 7,52,400 ₹34,083.72 |
| 4.00 | ENGAGEMENT OF A RELIEVER FOR OPERATORS (SKILLED CATEGORY) IN THE WEEKLY OF- DAYS. | 156 | DAYS | 630 ₹98,280 | 623 ₹97,188 | 626 ₹97,656 |
| 5.00 | ENGAGEMENT OF A RELIEVER FOR THE SWEEPER IN THE
WEEKLY OF- DAYS. | 52 | DAYS | 504 ₹26,208 | 498 ₹25,896 | 500 ₹26,000 |
| 6.00 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY AS PER DIRECTED BY EIC, REMOVING THE CARBON AND PARTICLE/SLUDGE ARRESTED BY CERAMIC SADDLES (3000 NOS. PER STAGE FOR TWO STAGES FOR TOTAL OF 6000 NOS.) FROM THE SCRUBBER/PRECOOLER AND CLEANING OF THE SAME IN TWO STAGES. TWO NOS. OF STAINLESS-STEEL STRAINER /NET TO BE CLEANED BY WAY OF HIGH-PRESSURE JET PUMP AND BY SCRUBBING HAMMER MANUALLY. (PRECAUTION TO BE TAKEN FOR FRESH AIR CIRCULATION DURING CLEANING INSIDE) | 12 | Monthly | 4,600 ₹55,200 | 4,575 ₹54,900 | 4,580 ₹54,960 |
| 7.00 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/AS DIRECTED BY EIC, OPENING THE TWO DOORS OF MIST ELIMINATOR BY UNSCREWING 60(SIXTY) NOS. NUT AND BOLT AND DRAWING OUT TWO NOS. STRAINER. CLEANING THE STRAINERS BY USING SCRUBBING HAMMER AND HIGH PRESSURE JET PUMP. STRAINERS TO BE FITTED IN PROPER POSITION INSIDE MIST ELIMINATOR AND CLOSING
THE TWO DOORS AND FITTING 60 NOS. NUT AND BOLTS. | 12 | Monthly | 4,600 ₹55,200 | 4,525 ₹54,300 | 4,580 ₹54,960 |
| 8.00 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR
MONTHLY/ AS DIRECTED BY EIC, CLEANING OF BLOWER BY OPENING THE INLET HUB AND REMOVING CANVAS CLOTH. THE DEPOSITED CARBON FROM INSIDE THE BLOWER TO BE CLEANED MANUALLY AND BY HIGH-PRESSURE JET PUMP. AFTER CLEANING THE INLET HUB TO BE REFITTED AND CANVAS CLOTH TO BE RE-WRAPPED. | 12 | Monthly | 3,300 ₹39,600 | 3,220 ₹38,640 | 3,260 ₹39,120 |
| 9.00 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/ AS DIRECTED BY EIC, CHIMNEY DOOR TO BE UNSCREWED AND DEPOSITED CARBON PARTICLES ARE TO BE MANUALLY REMOVED FROM INSIDE THE CHIMNEY BASE AND WASHED WITH WATER. REMOVED CARBON PARTICLES TO BE PACKED UP IN GUNNY BAGS AND DROPPED AT THE
DEPARTMENTAL VAT. | 12 | Monthly | 3,500 ₹42,000 | 3,450 ₹41,400 | 3,460 ₹41,520 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
30 May 2026, 2:00 pmClosed
D.G. (E)
Chaplin Bhawan, New Market, Esplanade Kolkata-700 013 West Bengal
OPERATION AND MAINTENANCE OF POLLUTION FREE WOODEN PYRES AT SHANAGAR BURNING GHAT.
2026_KMC_1024462_1
KMC/LTG/CRM/SBG/OM/WOOD/25-26 (for 1st call)
Open Tender
Support/Maintenance Service
365 days
SHANAGAR BURNING GHAT
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹22,000
9 Jun 2026
15 May 2026
1 Jun 2026
15 May 2026
30 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ENGAGEMENT OF THREE (03) NOS. OPERATORS (SKILLED
CATEGORY) IN 3 SHIFT DURING 24 HRS. HAVING ABILITY OF FAULT-FINDING AND CAN PERFORM MINOR REPAIRING WORKS CONNECTED WITH THE WOODEN PYRES, WATER CIRCULATION, SLURRY WATER DISCHARGE SYSTEM INCLUDING DAMPER, ID FAN & PUMP-MOTOR OPERATION. | - | Monthly | - | - |
| 2 | ENGAGEMENT OF ONE (01) NOS. SWEEPER FOR SWEEPING THE WHOLE WOODEN PYRES AREA, CLEANING THE DRAIN, SPRADING DISINFECTANT ETC. (ALL SWEEPING MATERIAL SUPPLIED BY THE CONTRACTOR). | - | Monthly | - | - |
| 3 | PROPORTIONATE CASUAL LEAVE IMPOSED AS PER MPL. SECRETARY'S CIRCULAR NO.23 OF 2012-13 DT. 10.12.12 VIDE THE MIC ITEM NO.M 39.7 DT.14.08.12 ADDING THE TOTAL WAGES AMOUNT 4.53% OF SL. NO. [1]+[2] | 0.2 | ONE ITEM | - | - |
| 4 | ENGAGEMENT OF A RELIEVER FOR OPERATORS (SKILLED CATEGORY) IN THE WEEKLY OF- DAYS. | - | DAYS | - | - |
| 5 | ENGAGEMENT OF A RELIEVER FOR THE SWEEPER IN THE
WEEKLY OF- DAYS. | - | DAYS | - | - |
| 6 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY AS PER DIRECTED BY EIC, REMOVING THE CARBON AND PARTICLE/SLUDGE ARRESTED BY CERAMIC SADDLES (3000 NOS. PER STAGE FOR TWO STAGES FOR TOTAL OF 6000 NOS.) FROM THE SCRUBBER/PRECOOLER AND CLEANING OF THE SAME IN TWO STAGES. TWO NOS. OF STAINLESS-STEEL STRAINER /NET TO BE CLEANED BY WAY OF HIGH-PRESSURE JET PUMP AND BY SCRUBBING HAMMER MANUALLY. (PRECAUTION TO BE TAKEN FOR FRESH AIR CIRCULATION DURING CLEANING INSIDE) | - | Monthly | - | - |
| 7 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/AS DIRECTED BY EIC, OPENING THE TWO DOORS OF MIST ELIMINATOR BY UNSCREWING 60(SIXTY) NOS. NUT AND BOLT AND DRAWING OUT TWO NOS. STRAINER. CLEANING THE STRAINERS BY USING SCRUBBING HAMMER AND HIGH PRESSURE JET PUMP. STRAINERS TO BE FITTED IN PROPER POSITION INSIDE MIST ELIMINATOR AND CLOSING
THE TWO DOORS AND FITTING 60 NOS. NUT AND BOLTS. | - | Monthly | - | - |
| 8 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR
MONTHLY/ AS DIRECTED BY EIC, CLEANING OF BLOWER BY OPENING THE INLET HUB AND REMOVING CANVAS CLOTH. THE DEPOSITED CARBON FROM INSIDE THE BLOWER TO BE CLEANED MANUALLY AND BY HIGH-PRESSURE JET PUMP. AFTER CLEANING THE INLET HUB TO BE REFITTED AND CANVAS CLOTH TO BE RE-WRAPPED. | - | Monthly | - | - |
| 9 | (AS PER PRESENT MARKET PRICE): LABOUR CHARGES FOR MONTHLY/ AS DIRECTED BY EIC, CHIMNEY DOOR TO BE UNSCREWED AND DEPOSITED CARBON PARTICLES ARE TO BE MANUALLY REMOVED FROM INSIDE THE CHIMNEY BASE AND WASHED WITH WATER. REMOVED CARBON PARTICLES TO BE PACKED UP IN GUNNY BAGS AND DROPPED AT THE
DEPARTMENTAL VAT. | - | Monthly | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_2517719.xls
BOQ • 0.34 MB
form.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid