Executive Engineer Unit-1 kherva
Dismantling, winding, Repairing, fitting & complete the electric motor Type HT 6.6 KV, 1025 KW , 904 RPM ( Jyoti Make) and newly supply FCMA neutral soft starter including loading/unloading/testing etc. for Rasalpur pumping station of Modhera-Dharoi pipe line project
317976
06/2026-2027
Open
Electrical - Motors and other equipment
Works
Mehsana
10 documents required · 10 mandatory
₹2,832
Executive Engineer, Unit No-1 kherava (Mehsana)
₹79,860
25 Jun 2026
25 Jun 2026
25 Jun 2026
17 Jul 2026
25 Jun 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of work :- Dismantling, winding, Repairing, fitting & complete the electric motor Type HT
KV, 1025 KW , 904 RPM ( Jyoti Make) and newly supply FCMA neutral soft starter including
loading/unloading/testing etc. for Rasalpur pumping station of Modhera-Dharoi pipe line project.
Unit QTY Item Unit Rate Per Amount Rs.
1 JYOTI MAKE, 1025 KW, 904 RPM, 6.6 KV, HT
MOTOR. (New Standard Electrical)
1.1 1 Work for VPI Rewinding of stator with (Global
No. VPI resin poor system insulation) No.
1.2 1 Work for supply of new shaft (for motor rotor)
No. as per original and insertion of new shaft also No.
rebarring / recagging of the rotor.
1.3 No. 1 Dynamic balancing of the rotor 104933.00 No.
1.4 No. 1 Restaggering of the stator core 308625.00 No.
1.5 No. 1 Bushing on DE side bearing housing 203693.00 No.
1.6 No. 1 Supply of new bearing 6324 MC3 119440.00 No.
1.7 No. 1 Supply of new bearing NU-330/ECM 141005.00 No.
1.8 No. 1 Supply of new bearing 7326 BCBM 260629.00 No.
1.9 1 Supply and fixing of new bearing housing
No. (insulated) for NDE side No.
1.10 No. 1 Supply of cooling fan 172830.00 No.
Shaft metalizing and machining at DE and NDE
1.11 No. 1 side bearing seating area. 253073.00 No.
Newly supply FCMA neutral soft starter 6.6
kV, 1025 KW, 50 Hz, 118A including
loading/unloading/testing etc. for Rasalpur
Pumping Station
Total Rs.(Without GST)
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Motor rewinind.pdf
SCHEDULE B MOTOR REWIND.pdf
TENDER NOTICE NO.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .