Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.0 L+₹3,303 (1.69%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TRISC SERVICE SOLUTION PVT LTD L1 | MOZAHARUL ISLAM L2 |
|---|---|---|---|---|---|
| 1.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 12 | Cum | 3,500 ₹42,000 | 1,800 ₹21,600 Lowest |
| 2.00 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. | 8 | Sqm | 1,147 ₹9,176 | 220 ₹1,760 Lowest |
| 3.00 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. | 1,560 | Kg | 9 ₹14,040 | 2 ₹3,120 Lowest |
| 4.00 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 159 | Kg | 6 ₹954 Lowest | 30 ₹4,770 |
| 5.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||
| 5.01 | All kinds of soil | 37 | Cum | 177 ₹6,549 Lowest | 250 ₹9,250 |
| 6.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 37 | Cum | 196 ₹7,252 | 150 ₹5,550 Lowest |
| 7.00Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. | |||||
| 7.01 | All kinds of soil. | 18 | Cum | 127 ₹2,286 | 80 ₹1,440 Lowest |
| 8.00Labour charges for dismembering of four legged light weight 40 meter high narrow based heavy weight tower (Wt. 15.00 MT) i/c all its components viz. climbing ladder, platform with railing, lightening arrester, earthing strips, aviation lamp, cable etc. and stacking of dismantled material within 50 meters lead all complete as per direction of Engineer in charge. All safety precautions shall be taken in accordance with safety code for dismembering of structural steel work (Note: :[Rate includes cost of all operations involved in dismantling of tower including hire and labour charges of tools, plants and mechineries, Insurance premium of labours and others,Sorting of materials etc., life safety jackets, safetybelts,helmet and all other necessary safety devices etc.and nothing will be paid extra.The contractor has to supply Insurance | |||||
Tender Value
₹2.1 L
EMD Value
₹4,120
Closing Date
12 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (C)
BSNL Civil Division 2 nd Floor BSNL Bhawan Panbazar Guwahti 781 001
Dismantling and Transportation of 40M (4legged) NBHW ground based Tower of Kumarikata GSM BTS Site, Goalpara under Bongaigaon BA.
2026_BSNL_296510_1
NIT No 031/BSNL/CDGH/26-27
Open Tender
Civil Works
Item Rate
60 days
Goalpara
As mentioned in the Tender Document
2 documents required · 2 mandatory
₹590
AO (Cash) O/O. GMTD Kamrup BA
₹4,120
18 Nov 2026
31 Oct 2026
17 Nov 2026
31 Oct 2026
12 Nov 2026
2 Nov 2026
75 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 12 | Cum | 3,551.25 | ₹42,615 |
| 2 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. | 8 | Sqm | 1,147.2 | ₹9,177.6 |
| 3 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. | 1,560 | Kg | 9.05 | ₹14,118 |
| 4 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 159 | Kg | 5.65 | ₹898.35 |
| 5Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||
| 5.01 | All kinds of soil | 37 | Cum | 177.5 | ₹6,567.5 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 37 | Cum | 196 | ₹7,252 |
| 7Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. | |||||
| 7.01 | All kinds of soil. | 18 | Cum | 126.8 | ₹2,282.4 |
| 8Labour charges for dismembering of four legged light weight 40 meter high narrow based heavy weight tower (Wt. 15.00 MT) i/c all its components viz. climbing ladder, platform with railing, lightening arrester, earthing strips, aviation lamp, cable etc. and stacking of dismantled material within 50 meters lead all complete as per direction of Engineer in charge. All safety precautions shall be taken in accordance with safety code for dismembering of structural steel work (Note: :[Rate includes cost of all operations involved in dismantling of tower including hire and labour charges of tools, plants and mechineries, Insurance premium of labours and others,Sorting of materials etc., life safety jackets, safetybelts,helmet and all other necessary safety devices etc.and nothing will be paid extra.The contractor has to supply Insurance | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
TenderDoc40MtrNBHWToweratKumarikataNIT031.pdf
Tender Documents • 1.64 MB
BOQ_345560.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .