Loading…
Loading…
Tender Value
₹16.8 L
EMD Value
₹33,600
Closing Date
21 Jul 2026, 3:00 pm
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Repair, painting, and renovation work involving the flooring of the Bukharpura garbage collection point, the RCC on the outer road, and the walls.
2026_DOLBU_1165029_1
172/CE/CD/NNB/26-27 (21 To 40) Sr No 31 Tender List 40 Date-27.06.2026
Open Tender
Civil Works
90 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,006
Bareillye-tender.com
₹33,600
1 Jul 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of old damage BOE C.C. tiles Road work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M | 17.73 | QTL | 2,057 | ₹36,470.61 |
| 1.02 | Dismantling of cement concrete or brick or dismantlled materials as directed by E/I.within a distance of 60.00M | 8.37 | CUM | 1,404 | ₹11,751.48 |
| 1.03 | Dismantling of old damage BOE C.C. tiles Road work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M | 1.53 | CUM | 660 | ₹1,009.8 |
| 1.04 | Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.251) | 12.6 | CUM | 209 | ₹2,633.4 |
| 1.05 | Cartage upto 5.00km for disposing of malba | 11.34 | CUM | 183.5 | ₹2,080.89 |
| 1.06 | First class brick work in 1:4 cement and fine sand of 1.25 FM. Mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 9.64 | CUM | 5,890 | ₹56,779.6 |
| 1.07 | 12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i) | 62.7 | SQM | 217 | ₹13,605.9 |
| 1.08 | Providing and laying cement concrete in 1:4:8 (1 cement: 4 C sand 8 stone ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ 1. | 36.75 | CUM | 7,125 | ₹2,61,843.75 |
| 1.09 | R.C.C. work with cement,approved coarse sand and 4cm gauge stone ballast in proportions of 1:2:4 in raft and foundation excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G G.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour tools & plants etc required for proper completion of work. Binding wire cost being included in the item, (S.I.No.287) | 57.42 | CUM | 8,173 | ₹4,69,293.66 |
| 1.1 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504 | 45.07 | QTL | 8,754 | ₹3,94,542.78 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 16.82 MB
BOQ_2184943.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid