Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.5 LAccepted-AOC | 1 | Accepted-AOC accept | |
| 2 | 2₹17.6 L+₹7,346.22 (0.42%)Rejected-Finance | 2 | Rejected-Finance REJECT | |
| 3 | 3₹18.3 L+₹79,836.60 (4.57%)Rejected-Finance | 3 | Rejected-Finance REJECT | |
| 4 | 4₹19.4 L+₹1.9 L (11.0%)Rejected-Finance | 4 | Rejected-Finance REJECT | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance EMD exemption certificate not valid |
Tender Value
₹17.9 L
EMD Value
₹44,639
Closing Date
21 Dec 2019, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Roads Division, Kasaragod
SLTF 2019-20 Providing Strip BC to Manjeswaram Ukkada road at 10/000 to 14/835
2019_PWD_330047_1
D5-TD/75/E-tender/2019-20
Open Tender
Civil Works - Roads
Item Rate
30 days
KASARAGOD
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
online
₹44,639
Yes
12 Jan 2021
16 Dec 2019
26 Dec 2019
16 Dec 2019
21 Dec 2019
16 Dec 2019
Amount
Strip BC
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.6.2.a : Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder( NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Grading - II (13.2 mm Nominal Size)<br>Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder( NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsGrading - II (13.2 mm Nominal Size)
ABDUL KHADER V P
AK THOUSEEF
T M NASEER
Bidder Name
B.A. SHAREEF
ABDUL KHADER V P
AK THOUSEEF
T M NASEER
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .