Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.9 LAdmitted-Finance | -32.78% | ₹28.9 L | L1 | Admitted-Finance |
| 2 | L2₹29.6 L+₹62,432.22 (2.16%)Admitted-Finance | -31.33% | ₹29.6 L+₹62,432.22 (2.16%) | L2 | Admitted-Finance |
| 3 | L3₹32.3 L+₹3.3 L (11.5%)Admitted-Finance | -25.03% | ₹32.3 L+₹3.3 L (11.5%) | L3 | Admitted-Finance |
| 4 | L4₹33.6 L+₹4.7 L (16.2%)Admitted-Finance | -21.87% | ₹33.6 L+₹4.7 L (16.2%) | L4 | Admitted-Finance |
Tender Value
₹43.1 L
EMD Value
₹86,113
Closing Date
31 May 2026, 6:00 pmClosed
X.En. (RMC) Div.-I, CAD Chambal, Kota
X.En. (RMC) Div.-I, CAD Chambal, Kota
Construction of Safety Wall at Kalareva Mr near Gumanpura village GP Simlia in RMC Distributary Section in Sub Division Digod
2026_CADKO_561489_9
NIT No. 03/2026-27 (No. 799-815)
Open Tender
Civil Works
Percentage
365 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
X.En. (RMC) Div.-I, CAD Chambal, Kota
₹86,113
Yes
3 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
31 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F-2 for Block joints of foundation stilling basins buckets, aprons etc. (non-suspended horizontally laid mass concrete) | 2,074.8 | Sqm | 160 | ₹3,31,968 |
| 2 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. (diametre) 600mm (Excluding Labour Charges) NP-3 | 17.5 | RM | 3,098 | ₹54,215 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b) Hard / dense soil | 625.6 | Cum | 79 | ₹49,422.4 |
| 4 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 480.24 | Cum | 5,161 | ₹24,78,518.64 |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 299 | Cum | 4,654 | ₹13,91,546 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_999318.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .