Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
17 Sept 2026, 6:00 pm5d left
Anikesh Shivhare
Anikesh Shivhare Manager C M Email [email protected] Mob 9009988207 JHABUA POWER LIMITED POST OFFICE-ATTARIA, TEHSIL-GHANSORE DIST-SEONI MADHYA PRADESH PIN 480997
Construction of Diesel Dispensing Unit as per the Scope of Work SOW and BOQ at Jhabua Power Limited
2026_JPL_289734_1
JPL/CnM/26-27/1200008533
Limited
Miscellaneous Services
Works
365 days
JPL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,000
3 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
3 Sept 2026 - 10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Excavation for Soil.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All Kind of soil. | 457.46 | M3 | 100 | ₹45,746 |
| 1.02 | Embankment Construction: Construction of Embankment, subgrade & earthen shoulders with Material Obtained from
Borrow Pits A. Construction of embankment, subgrade & earthen shoulders with approved material (Select soil having CBR > 7) obtained from borrow pits i/c all leads and lift and removal of top soil if any, including cost of land as a source of material, transporting to site, spreading, graded by motor grader to required slope and compacting using vibratory rollers of 80 to 100 kN static weight to meet requirement of Tables 300.1 and 300.2 including all leads, etc. as per Technical Specification Clauses 301.3, 301.5, and 303. All kinds of soil. | 231 | M3 | 100 | ₹23,100 |
| 1.03 | Backfilling Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 907.37 | M3 | 100 | ₹90,737 |
| 1.04 | Carriage of material lime, murrum, building rubbish up to distance 2km. | 907.37 | M3 | 100 | ₹90,737 |
| 1.05 | Construction of Shoulders as per Technical Specification Clause 407.
Construction of shoulder as per clause 407 with selected soil having CBR value not less than 12 inclusive of all leads and lifts providing 4% camber I/c operations like watering, rolling and compaction etc. as per clause 303.5 | 90.72 | M3 | 100 | ₹9,072 |
| 1.06 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface
and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. | 100.98 | M3 | 100 | ₹10,098 |
| 1.07 | Dry Lean Cement Concrete Sub- base Construction of Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7
days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer in- charge | 34.32 | M3 | 100 | ₹3,432 |
| 1.08 | Cement Concrete Pavement M 30
Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber finishing with required texture, including steel form work with sturdy
M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with
sleeve/ tie bars to be paid separately). | 99 | M3 | 100 | ₹9,900 |
| 1.09 | Providing and Laying Reinforced Cement Concrete Pipe NP4 ISI Mark as per design
Providing and laying ISI mark reinforced cement concrete hume pipe NP4 for culverts on first class bedding of granular material in single row including jointing with cement mortar 1:2 but excluding excavation, protection works, backfilling, bedding, concrete and masonry works in head walls and parapets Clause 1101.6 600 mm dia | 15 | M | 100 | ₹1,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Declaration regarding Local Content.pdf
Tender Documents • 0.17 MB
GCC.pdf
Tender Documents • 1.68 MB
ITB.pdf
Tender Documents • 0.43 MB
Nodeviationcertificate.pdf
Tender Documents • 0.06 MB
SCC.pdf
Tender Documents • 0.37 MB
SOW.pdf
Tender Documents • 1.32 MB
BOQ_337973.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .