Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.3 L
EMD Value
₹9,000
Closing Date
25 Nov 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Panchayat (R&B) Division, Tapi
District Panchayat Pramukhshree Fund 2026-27 Construction of C.C road Adhyapor Village to River Road Ch 0/0 to 0/100 Ta.Valod Dist.Tapi.
363025
20 of 2026-27
Open
Civil Works - Roads
Works
Tapi
6 documents required · 6 mandatory
₹900
Executive Engineer, Panchayat (R&B) Division, Tapi-Vyara
₹9,000
4 Nov 2026
4 Nov 2026
4 Nov 2026
25 Nov 2026
4 Nov 2026
90 days
Name of Work:- માન. જ લા પંચાયત ખ
ુ ી ા ટ 2026-27. Const.of C.C road Adhyapor village to
River road Ch 0/0 to 0/100 Ta. Valod Dist.Tapi.
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification and Rate In
Quantity Unit Amount
No. reference to book of specifications) Figures
1 Clearing and grubbing road land including uprooting rank vegetation 0.03 Hect 28455.00
grass bushes,shrubs,sapling and trees girth up to 300 mm removal of
stumps of trees cut earlier and disposal of unserviceable materials (C)
By mechanical means in area of light jungle.
2 Earthwork in cuting in all sorts of soil and soft murrum including 44.10 Cum. 130.94
conveying and spreading the stuff, embankment as and where directed
within 200meters from the end of the cutting with all required lead and
3 Earth work for embankment including breaking clods dressing with all 316.13 Cum. 173.67
lead & lifts and including watering rolling and consolidation of sub
grade in layers of O.M.C. to required dry density including filling in
depressions which occure during the process using vibratory roller 80 to
100 KN (E) From borrow area within 3.00 Km Lead Having C.B.R.
More than 5.00%
4 Supplying, Stacking, Spreading & rolling of Hard Murrum on road side 12.00 Cum. 378.75
for hard side shoulder of work as per specification including filling the
mesure boxes of standard size etc. complete.
5 Consructing of granular sub-base Gr-II by providing course graded B.T. 47.00 Cum. 611.05
machine crushed material satisfying MOST specification of grading II
including spreading in uniform layer with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC and
compacting with vibratory roller to achieve the desired density etc.
6 Providing and laying speading and compacting graded stone aggregate 45.00 Cum. 756.49
to Wet Mix Macadam(WMM) in single layer as per specification and
drawing including premixing the Material with water at OMC in
mechanical mix plant carriage by tipper to site,laying in unifrom layer
in sub-base/base course on well prepare surface and compacting with
vibrator rollar to achive the desired density as per MORTH fifth
revision clause-406.
7 Providing and laying cement concrete 1:4:8 (1: cement: 4 coarse sand: 8 45.00 Cum. 2901.73
crushed stone aggregate 40 mm nominal size ) and curing complete
excluding the cost of formwork in (A) Foundation and plinth
8 Providing & Laying cement concrete 1:1:5:3 (1 cement : 1:5 course 85.00 Cum. 5358.05
sand : 3 graded stone aggregate 20 mm nominal size) for C.C. road
including curing & cost of form work. Finishing the cement concrete
road by trimix process inclusive of labour charges for trimix vacuum
dewatering process on cement concrete road by using vacuum
dewatering pump, surface floater, surface vibrator and Groove cutting
as per direction by engineer incharge & as per specification.
9 Providing and fixing in position FE 500D TMT bar reinforement 1.32 M.T. 73243.02
including cutting, bending and tying complete as per detailed drawings.
(D) Wearing Coat.
10 Supplying and fixing reinforced concrete heavy duty nonpressure 7.50 Rmt 1968.38
pipes with collars for culverts carrying heavy traffic as per IS 458-1991
specifications including setting the pipes in C.M. 1:2 watering and
laying (to level or slopes) of class NP3 of following internal
daimeters.(iii) 600mm dia.
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in
figures and words) of the estimated rate mentioned above Amount of my / our tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed by the
Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt G.R.: PRC-
10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore in R.C.C. items where the
reisa change as per actual mix design the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD CC RD Adyapor to River.pdf
BOQ_ CC RD Adyapor to River.pdf
Specification.pdf
4.Clouse 24(iv)34 and 52.pdf
GR all SBd with Index-1.pdf
GR all SBd with Index-2.pdf
GR all SBd with Index-3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .