| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.1 LAccepted-Finance | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹41.2 L+₹4,117.72 (0.10%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹41.2 L+₹5,764.80 (0.14%)Rejected-Finance CHANDPARA CHANDPURE | KOLKATA | WEST BENGAL | 700001 | L3 | Rejected-Finance 3rd Lowest Bidder |
Tender Value
₹41.2 L
EMD Value
₹82,354
Closing Date
14 Sept 2026, 12:00 pmClosed
Executive Engineer Barasat Highway Division-I
Office of The Executive Engineer Barasat Highway Division-I, P.W. (Roads) Dte. Purta Bhavan, 3rd Floor, Room No. 305, 306, 307, 308, 309 Salt Lake, Kolkata-700091
New Barrackpore Colony Road from 0.00 kmp to 3.60 kmp Restoration work of Augmentation and Strengthening of urban water supply scheme of New Barrackpore Municipality Under District North 24 Parganas, West Bengal under AMRUT 2.0 by KMDA under BHDI
2026_WBPWD_5020111_1
WBPWRD/EE/BHDI/eNIT14/26-27
Open Tender
CIVIL WORKS
Percentage
BARASAT
Please refer Tender documents.
5 documents required · 5 mandatory
₹82,354
25 Sept 2026
25 Aug 2026
16 Sept 2026
25 Aug 2026
14 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of unserviceable soil including excavation,
loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per Technical Specification Clause 302.3.11 for Rural Roads of MORD. (Mode of measurement: pre works and post works) | 215.15 | Cu.m | 86.77 | ₹18,668.57 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specifications Clause 202 for Rural Roads
of MORD. (II) By Mechanical Means (a) Bituminous Courses | 53.15 | Cu.m | 312.86 | ₹16,628.51 |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking
serviceable and unserviceable materials separately as
per Technical Specifications Clause 202 for Rural Roads
of MORD. (I) By Manual Means b) Granular Courses | 354.38 | Cum | 587.83 | ₹2,08,315.2 |
| 4 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing
with water as per direction, mending cracks and
depressions by ramming wherever necessary. | 114.75 | Cum | 1,579.07 | ₹1,81,198.28 |
| 5 | Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (v) Grading –V | 118.13 | Cum | 2,974.57 | ₹3,51,385.95 |
| 6 | Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (iii) Grading –III | 118.13 | Cu.m | 2,944.77 | ₹3,47,865.68 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials,
machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 236.25 | Cu.m | 3,029.79 | ₹7,15,787.89 |
| 8 | Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision). (i) For WBM / WMM Surface:
(with primer @ 0.70-1.0 kg/sqm) | 945 | Sqm | 129.44 | ₹1,22,320.8 |
| 9 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer
(Using Bitumen emulsion at the rate of 0.25 to
0.30 kg per sqm.) | 945 | Sqm | 25.84 | ₹24,418.8 |
| 10 | Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and
finished rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge
Works of MoRT&H (5th Revision). B. For Grading 2
(19 mm nominal size, 50-75 mm thick.) ii) Using Drum mix Type HMP of minimum capacity
60-90 TPH. | 47.25 | Cu.m | 12,046.82 | ₹5,69,212.25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
WBF.pdf
Tender Documents • 1.16 MB
BOQ_5094115.xls
BOQ • 0.30 MB
OID.pdf
Other Document • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .