| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC 0001D ATM HOUSE AIR FORCE NEENA THAPA GORAKHPUR UTTAR PRADESH 273008 UDYAM UP 32 0054752 | GORAKHPUR | UTTAR PRADESH | 273008 | L1 | Accepted-AOC LOWEST QUOTED BIDDER | |
| 2 | L2₹13.9 L+₹2.2 L (18.8%)Rejected-Finance | L2 | Rejected-Finance NOT THE LOWEST QUOTED BIDDER |
Tender Value
₹14.5 L
EMD Value
₹29,000
Closing Date
13 Oct 2022, 6:00 pmClosed
CWE AF SECUNDERABAD
CWE AF SECUNDERABAD BOWENPALLY POST SECUNDERABAD 500011
REPAIRS / MAINT TO DG SETS OF CAPACITY 25 TO 100 KVA AND ABOVE AT AIR FORCE STATION BIDAR
2022_MES_550803_1
85573/E8
Open Tender
Civil Works - Others
Item Rate
180 days
GE AF BIDAR
AS PER NIT
9 documents required · 9 mandatory
₹500
GE AF BIDAR
₹29,000
Yes
20 Oct 2022
8 Sept 2022
15 Oct 2022
8 Sept 2022
13 Oct 2022
29 Sept 2022
8 Sept 2022 - 23 Sept 2022
Amount
Disconnecting & Removing the unserviceable oil filter from DG set and Supply & Fix new oil filter , cleaninng the complete oil chamber, fixing oil filter element with rubber gasket and filling and toping up of engine oil for the folliwng capacity DG sets as directed by Engineer-in-Charge. Note : Engine Oil Measured and Paid Seprately.
(a) DG set 30 & 40 KVA
(b) DG Set 62.5 KVA
(c) DG set 100 & 125 KVA
(d) DG set 160 & 200 KVA
(e) DG set 500 KVA
(f) DG set 320 KVA
(g) DG set 1000 KVA
Disconnecting & Removing the unserviceable fan belt from DG set & Supply & fixing new fan belt of same size and capacity for the following DG sets complete all as specified and directed by the Engineer-in-Charge Make :- Fenner / LUCAS / TVS
(a) DG set 30 & 40 KVA
(b) DG Set 62.5 KVA
(c) DG set 100 & 125 KVA
(d) DG set 160 & 200 KVA
(e) DG set 500 KVA
(f) DG set 320 KVA
(g) DG set 1000 KVA
Disconnecting & Removing the unserviceable diesel filter from DG set and Supply & Fix new diesel filter , cleaninng filter cell, fixing filter element with rubber gasket for the folliwng capacity DG sets as directed by Engineer-in-Charge.
(a) DG set 30 & 40 KVA
(b) DG Set 62.5 KVA
(c) DG set 100 & 125 KVA
(d) DG set 160 & 200 KVA
(e) DG set 500 KVA
(f) DG set 320 KVA
(g) DG set 1000 KVA
Disconnection and removing the unserviceable fuel injection pump carefully from the 100 to 250 KVA DG Set and servicing the same including renewal of u/s parts and carried out calibration fixing back in its original position testing and commissioning complete all as specified and as directed.
Disconnection and removing the unserviceable self starter unit 24 volts capacity carefully from the 100 KVA to 315 KVA DG Set for finding out the defects and to replace the unserviceable items such as field coils, bentex, armature solenoid switch etc and refixing the same in its original postion after completion repairs including testing and commissioning complete all as specified and as directed.. Make : TVS Lucas / Fenner or as approved by the OEM. Note : - Armature and bentex will be measured and paid respective item of the schedule.
Disconnection and removing the unserviceable self starter unit 12 volts capacity carefully from the 30 to 125 KVA DG Set for finding out the defects and to replace the unserviceable items such as field coils, bentex, armature etc and refixing the same in its original postion after completion of repairs including testing and commissioning complete all as specified and as directed. Make :- TVS Lucas/Fenner or as approved by the OEM. Note : Armature and bentex will be measured and paid respectively item of the schedule.
Supply only bentex unit made with brass suitable for 12 volts self starter unit complete all as specified and as directed.
Supply only bentex unit made with brass suitable for 24 volts self starter unit complete all as specified and as directed.
Disconnection and removing the unserviceable self starter unit carefully from the 100 to 500 KVA DG Set and S&F new self starter unit complete suitable for DG Set 100 to 500 KVA including testing and commissioning complete all as specified and as directed. Make :-TVS Lucas / Fenner or as approved by the GE
Supply and filling Engine oil 20/40 complete all as specified and as directed. Make :- Castrol GTX/Greaves Max therm/Kirloskar
Disconnection and removing the unserviceable power contactor 4 POLE carefully from Panel board and S&F new power contactor 4 POLE 100A 440 V comprising of all accessories type MCX-22 complete all as specified and as directed. Make :- L&T or its equivalent in Seimens/Cuttler hammer.
Disconnection and removing the unserviceable power contactor 4 POLE carefully from Panel board and S&F new power contactor 4 POLE 200 A 440 V comprising of all accessories type MCX-33 complete all as specified and as directed. Make :- L&T or its equivalent Seimens / Cuttler Hammer.
Disconnection and removing the unserviceable power contactor 4 POLE carefully from Panel board and S&F new power contactor 4 POLE 400 A 440 v comprising of all accessories type MCX-43 complete all as specified and as directed. Make :- L&T or its equivalent Seimens/Cuttler hammer.
Disconnection and removing the unserviceable power contactor 4 POLE carefully from Panel board and S&F new power contactor 4 POLE 600 A comprising of all accessories type MCX-45 complete all as specified and as directed.Make :- L&T or its equivalent Seimens/Cuttler hammer.
Disconnection and removing the unserviceable Main contactor 3 POLE carefully from Panel board and S&F new power contactor 3 POLE 70/100 A 440 v comprising of all accessories type ML-4 complete all as specified and as directed. Make :- L&T or its equivalent Seimens/Cuttler hammer.
Disconnection and removing the unserviceable Main contactor 3 POLE carefully from Panel board and S&F new power contactor 3 POLE 70 to 100 A comprising of all accessories type Hz MNX-70 complete all as specified and as directed. Make :- L&T or its equivalent Seimens/Cuttler hammer.
Disconnection and removing the unserviceable Main contactor 3 POLE carefully from Panel board and S&F new power contactor 3 POLE 80 to 100 A comprising of all accessories type MNX-80 complete all as specified and as directed. Make : - L&T or its equivalent Seimens/Cuttler hammer.
Disconnection and removing the unserviceable Main contactor 3 POLE carefully from Panel board and S&F new power contactor 3 POLE 95 to 160 A comprising of all accessories type MNX-95 complete all as specified and as directed. Make :- L&T or its equivalent Seimens/Cuttler hammer.
Disconnection and removing the unserviceable Main contactor 3 POLE carefully from Panel board and S&F new power contactor 3 POLE 500 Amps AC3 of Make TC Type LC1FDP or its equivalent GE/L&T/Cuttler hammer complete all as specified and as directed.
Disconnection and removing the unserviceable Main contactor 3 POLE carefully from Panel board and S&F new power contactor 3 POLE MN 400 complete all as specified and as directed. Make : - L&T or its equivalent in Seimens/GE
Disconnection and removing the unserviceable spare kit of Power contactor 4 pole, 415 volts and supply and fix new spare kit unit suitable for MCX-22 Power contactor of Make L&T or its equivalent in Siemens/GE complete all as specified and as directed.
Disconnection and removing the unserviceable spare kit of Power contactor 4 pole, 415 volts and supply and fix new spare kit unit suitable for MCX-33 Power contactor of Make L&T or its equivalent in Siemens/GE
Disconnection and removing the unserviceable spare kit of Power contactor 4 pole, 415 volts and supply and fix new spare kit unit suitable for MCX-43 Power contactor of Make L&T or its equivalent in Siemens / GE complete all as specified and as directed.
Disconnection and removing the unserviceable spare kit of Power contactor 4 pole, 415 volts and supply and fix new spare kit unit suitable for MCX-45 Power contactor of Make L&T or its equivalent in Siemens / GE complete all as specified and as directed.
Disconnection and removing the unserviceable spare kit of Power contactor 3 pole, 415 volts and supply and fix new spare kit unit suitable for ML-4 Power contactor of Make L&T or its equivalent in Siemens / GE complete all as specified and as directed.
Disconnection and removing the unserviceable spare kit of Power contactor 3 pole, 415 volts and supply and fix new spare kit unit suitable for MNX-70 Power contactor of Make L&T or its equivalent in Siemens/GE complete all as specified and as directed.
Disconnection and removing the unserviceable spare kit of Power contactor 3 pole, 415 volts and supply and fix new spare kit unit suitable for MNX-80 Power contactor of Make L&T or its equivalent in Siemens/GE complete all as specified and as directed.
Disconnection and removing the unserviceable spare kit of Power contactor 3 pole, 415 volts and supply and fix new spare kit unit suitable for MNX-95 Power contactor of Make L&T or its equivalent in Siemens/GE complete all as specified and as directed.
Disconnection and removing the unserviceable spare kit of Power contactor 4 pole, 415 volts and supply and fix new spare kit unit suitable for AC3 500 Amps Power contactor of Make and Model Type LC1FDP or its equivalent L&T/Cuttler hammer complete all as specified and as directed.
Disconnection and removing the unserviceable spare kit of Power contactor 4 pole, 415 volts and supply and fix new spare kit unit suitable for MN 400 Power contactor of Make L&T or its equivalent GE / Cuttler hammer complete all as specified and as directed.
Disconnection and removing the unserviceable speed governor unit carefully from DG Set and S&F new speed governor unit of same size and capacity suitable for 62.5 to 125 KVA complete all as specified and as directed. Make :- Kirloskar DG Set or its equivalent CE .
Disconnection and removing the unserviceable speed governor unit carefully from DG Set and S&F new speed governor unitof same size and capacity suitable for 160 to 315 KVA complete all as specified and as directed.Make :- Kirloskar DG Set or its equivalent CE.
Disconnection and removing the unserviceable power control unit and S&F new power control unit of same size and capacity suitable for existing Kirloskar Make DG Set of capacity 62.5 to 125 KVA, Model KG934V1 or its equivalent complete all as specified and as directed.
Disconnection and removing the unserviceable power control unit and S&F new power control unit of same size and capacity suitable for existing Kirloskar Make DG Set of capacity 160 to 315 KVA or its equivalent. Model KG545 Kirloskar V12 or its equivalent. complete all as specified and as directed.
Disconnection and removing the unserviceable engine control relay and S&F new engine control relay of same size and capacity suitable for existing Kirloskar Make DG Set of capacity 62.5 to 125 KVA or its equivalent. Model E2CSPC Make : C&S or its equivalent complete all as specified and as directed.
Disconnection and removing the unserviceable Advance digital controller and S&F new Advance digital controller relay of same size and capacity suitable for existing Kirloskar Make DG Set of capacity 62.5 to 125 KVA or its equivalent. Model GADC-422 Make: GREAVES COOTON LTD or its equivalent complete all as specified and as directed.
Supply and topping up of coolent complete all as specified and as directed. Make :- Castrol/ Veedol
Supply and fixing battery charging unit of capacity suitable for 12/24 volts battery and fixing in inside the AMF panel enclosure including taking out unserviceable battry charging unit complete all as specified and as directed.
M&L for servicing of AMF panel upto 500 KVA capacity of DG Sets including finding of all the defects and internal wiring and making functional of panel board complete. Note: Misc spare parts such as plug in relay, fuse cut out, under/over load relay, carbon tettra cholride required for cleaning of the contacts and consultant / mechanic charges for visiting the site complete for satisfactory etc completion of the job deemed to be inclusive in the unit rate complete all as specified and as directed.
Disconnection and removing the unserviceable under voltage and over voltage relay and Supply and fixing under voltage and over voltage relay complete all as specified and as directed. Make :- Rishabh / MiniLec / C&S
Disconnection and removing the unserviceable Timer and Supply and fixing new Timer complete all as specified and as directed. . Make : - L&T / CE
Disconnection and removing the unserviceable battery lead connection and M&L for battery connected leads made out of PVC Single core 50 Sqmm1100 volts grade bunched copper conductor upto 1.5m long including one end soldered with a copper lug and the other end soldered with a brass terminal along with nut, bolt and washer complete all as specified and as directed.
Disconnection and removing the unserviceable battery lead connection and M&L for battery connected leads made out of PVC Single core 50Sqmm 1100 volts grade bunched copper conductor upto 0.6 m long including both end soldered with a brass terminal along with nut, bolt and washer for interconnection of batteries complete all as specified and as directed.
Disconnection and removing the unserviceable alternator of capacity of DG Set carefully from the engine and rewinding the same with single strand fine enamel copper conductor of same guage weight and tons and keeping the windings into hot air oven till the moisture evaporates and fixing the same init original position duly painted the alternator after completion of repairs connecting the cables and all the accessories testing and commissioning complete of the following capacities:- Note :- (i) All the misc items such as Bearings, terminal, coupling, impregranted paper, warnising, cotton tape and other misc items required for satisfactory completion of job deemed to be included in the unit rate. (ii) The above repairs are considered to meet the anticipated requirement if any and based on the site requirement the scope will be handed over to the Contractor.
(a) DG set 30 to 40 KVA capacity
(b) DG Set 62.5 to 70 KVA capacity
(c )DG set 100 & 125 KVA capacity
(c )DG set 315 & 500 KVA capacity
Disconnection and removing the unserviceable MCCB 4 pole, 415 volts and supply and fix new MCCB 4 Pole 100 Amps 25 KA of M ake ABB or its equivalent in L&T/Legrend
Disconnection and removing the unserviceable MCCB 4 pole, 415 volts and supply and fix new MCCB 4 Pole 200 - 250 Amps 50 KA complete all as specified and as directed. Make :- L&T or its equivalent in Legrand / ABB / Schneider
M&L for Preparation of surfaces and painting the DG Set with accoustic enclosure and AMF Panel board with one coat of synthetic enamel paint of existing colour including marking of SM/MES numbering, capacity of the DG Set, date of installation etc as directed by the Engg-in-Charge complete of the following capacities :-
(a)DG set 30 to 40 KVA capacity
(b)DG Set 62.5 to 125 KVA capacity
(c)DG set 160 to 315 KVA capacity
Taking down unserviceable fuel / Oil pipe line with benjo bolt supply and fixing new fuel / oil pipe lines (High pressure ruber pipe covered with stell armoured complete all as specified and as directed.
Supply and fill distilled water in the batteries of DG sets distilled water and acid mix water at different locations complete all as specified and as directed.
Supply and fixing battery terminal made up of brass including taking down unserviceable battery terminal complete all as specified and as directed.
Supply and fixing Engine control / protection relay having the auto manual mode, contactor close/open, DG start/stop functions suitable for of capacity upto 320 KVA DG sets including taking down unserviceable protection relay complete all as specified and as directed. Make :- L&T, C&S, Siemens
Supply and fixing injector over flow pipe including taking down unserviceable pipe complete all as specified and as directed.
Disconnection and removing the unserviceable PCB carefully from Panel board and S&F new PCB 12V DC W305 complete suitable for Make Kirloskar DG Set or its equivalent complete all as specified and as directed.
Taking down unserviceable automatic voltage regulator, supply and fixing new automatic voltage regulator with UVN, PQ, F1F2 terminals rated voltage upto 67 Volts suitable for upto 320 KVA DG sets complete all as specified and as directed. Make :- Kirloskar / Greaves
Siddique constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .