Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | -48.10% | ₹3.9 L | L1 | Admitted-Finance |
| 2 | L2₹4.0 LAdmitted-Finance | -47.47% | ₹4.0 L | L2 | Admitted-Finance |
| 3 | L3₹4.1 LAdmitted-Finance | -45.63% | ₹4.1 L | L3 | Admitted-Finance |
| 4 | L4₹4.2 LAdmitted-Finance | -44.75% | ₹4.2 L | L4 | Admitted-Finance |
| 5 | L5₹4.6 LAdmitted-Finance N A | FARIDABAD | HARYANA | 121004 | -39.47% | ₹4.6 L | L5 | Admitted-Finance |
Tender Value
₹7.6 L
EMD Value
₹15,200
Closing Date
20 Jan 2026, 6:00 pmClosed
ER VIJAY KUMAR
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
Please refer to BOQ
2026_PWDJK_300452_2
71 of 2025-26 dated 10-01-2026
Open Tender
Civil Works
60 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
₹15,200
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
12 Feb 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
15 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) with all leads and lifts carriage complete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with all leads and lifts carriage complete
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) with all leads and lifts carriage complete
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete.
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) with all leads and lifts carriage complete.
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) with all leads and lifts carriage complete.
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work.
Lettering with black Japan paint of approved brand and manufacture
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
BOQ_974666.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid