Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
17 Aug 2026, 6:00 pmClosed
Executive Engineer
KDA Kota
Civil work
2026_UITKo_579926_1
NIT 12/2026-27 (14)
Open Tender
Civil Works
Percentage
180 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
6000 Secrectry KDA, 2000 MD RISL
₹5.0 L
Yes
18 Aug 2026
30 Jul 2026
18 Aug 2026
30 Jul 2026
17 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Part -A ( Retaining wall work) | - | - | - | - |
| 1Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. | |||||
| 1.1 | M15 grade Nominal Mix
1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | 102 | Cum | 4,624 | ₹4,71,648 |
| 2 | Providing and laying in position Ready mix concrete manufactured in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design of specified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cement as per codal provision. | 527.85 | Cum | 6,089 | ₹32,14,078.65 |
| 3Add extra for providing richer mixes respectively at all floor levels | |||||
| 3.1 | Providing M-25 grade concrete by using cement as per codal provision instead of M-20 grade design mix. | 861.9 | Cum | 69 | ₹59,471.1 |
| 4 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level.
('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) | 62,154.34 | kg | 77 | ₹47,85,884.18 |
| 5 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 2,146.5 | Sqm. | 157 | ₹3,37,000.5 |
| 6Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : | |||||
| 6.1 | Walls (any thickness) including attached pilasters, buttresses plinth and string course. | 1,331.2 | Sqm. | 289 | ₹3,84,716.8 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_1030490.xls
BOQ • 0.33 MB
Special_Condition_14.pdf
Tender Documents • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .