| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC MORWA SHUKLA MODE WARD NO 2 P O SINGRAULI DISTT SINGRAULI M P PIN 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | ₹22.5 L Quoted ₹19.0 L | L1 | Accepted-AOC Accepted on L1 basis |
| 2 | Rejected-Technical SARSAVAH RAJA POST JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | - | - | Rejected-Technical Techno-commercially rejected |
| Sl No | Description | Qty | Unit | KOHLI & SONS L1 |
|---|---|---|---|---|
| 1.00Removal of 05 Nos. Slew Rack Segment, Repair of holes in both Base Plate and Rack Segments and Refitting of Rack Segments in 24/96 Yamuna Dragline and Torquing of all Barrel Bolts & Joint Studs in 24/96 Ganga, Yamuna & Saraswati Draglines. | ||||
| 1.01 | Labour charges for cleaning of working area in all three dragline by removing dust, grease, paint etc by engaging 06 nos. unskilled manpower in two shifts for 30 days as per scope of work in NIT considering labour cost, profit and any other Cost. | 1 | Job | 2,12,000 ₹2.1 L |
| 1.02 | Labour charges for removal of 05 nos. rack segment, rebuilding of holes , grinding, alignment, indexing and drilling of holes on base plate (40 nos) by engaging 03 nos skilled fitterfor 15 days, 03 nos. skilled welder for 15 days, 03 nos. skilled machinist for 12 days and 06 nos. unskilled helper for 15 days in two shifts as per scope of work in NIT considering labour cost, profit and any other Cost. | 1 | Job | 3,55,000 ₹3.5 L |
| 1.03 | Labour charges for rebuilding of holes, grinding, alignment, indexing and drilling of holes in rack segment (40 nos.) by engaging 02 nos skilled fitter, 02 nos. skilled welder, 02 nos. skilled machinist and 04 nos. unskilled helper for 12 days in two shifts as per scope of work in NIT considering labour cost, profit and any other Cost. | 1 | Job | 1,98,000 ₹2.0 L |
| 1.04 | Total cost of drilling of holes using heavy-duty Auto-feed radial drilling machine | 80 | Nos. | 2,000 ₹1.6 L |
| 1.05 | Labour charges for refitting of 05 nos. rack segemnt including shrink-fitting of barrel bolts & joints studs by engaging 02 nos skilled fitter, 01 no skilled welder and 04 nos. semi-skilled helper for 05 days in two shifts as per scope of work in NIT considering labour cost ,profit and any other Cost. | 1 | Job | 55,500 ₹55,500 |
| 1.06 | Total cost of liquid Nitrogen for shrink-fitting of bolts & studs | 40 | Liter | 240 ₹9,600 |
| 1.07 | Labour charges for torquing of 128 nos. barrel bolts & 96 Nos. joining bolts and replacement of 960 Nos. manhole cover bolts by engaging 03 nos skilled fitter and 06 nos. semi-skilled helper for 12 days in two shifts as per scope of work in NIT considering labour cost ,profit and any other Cost. | 3 | Nos. of dragline | 1,70,000 ₹5.1 L |
| 1.08 | Total cost ofremoval, fitting & tightening of 960 nos. manholes cover bolts. | 3 | Nos. of dragline | 52,800 ₹1.6 L |
| 1.09 | Cost towards engagement of 01 no supervisor for 56 days in two shifts considering profit and any other cost. | 1 | Job | 1,15,561 ₹1.2 L |
Updated dates
Tender Value
₹22.5 L
EMD Value
₹28,200
Closing Date
16 Jan 2026, 11:00 amClosed
GM(Excv), Jayant Project
GM office, Jayant project, Singrauli, M.P-486890
Removal of 05 Nos. Slew Rack Segment, Repair of holes in both Base Plate and Rack Segments and Refitting of Rack Segments in 24/96 Yamuna Dragline and Torquing of all Barrel Bolts and Joint Studs in 24/96 Ganga, Yamuna and Saraswati Draglines.
2025_NCL_350357_1
JNT/GM(Excv)/E-tender/25-26/47
Open Tender
Excavation Department Work
365 days
Jayant Project
As per NIT
3 documents required · 3 mandatory
₹28,200
29 Jan 2026
31 Dec 2025
17 Jan 2026
31 Dec 2025
16 Jan 2026
1 Jan 2026
31 Dec 2025 - 5 Jan 2026
Removal of 05 Nos. Slew Rack Segment, Repair of holes in both Base Plate and Rack Segments and Refitting of Rack Segments in 24/96 Yamuna Dragline and Torquing of all Barrel Bolts & Joint Studs in 24/96 Ganga, Yamuna & Saraswati Draglines.
Labour charges for cleaning of working area in all three dragline by removing dust, grease, paint etc by engaging 06 nos. unskilled manpower in two shifts for 30 days as per scope of work in NIT considering labour cost, profit and any other Cost.
Labour charges for removal of 05 nos. rack segment, rebuilding of holes , grinding, alignment, indexing and drilling of holes on base plate (40 nos) by engaging 03 nos skilled fitterfor 15 days, 03 nos. skilled welder for 15 days, 03 nos. skilled machinist for 12 days and 06 nos. unskilled helper for 15 days in two shifts as per scope of work in NIT considering labour cost, profit and any other Cost.
Labour charges for rebuilding of holes, grinding, alignment, indexing and drilling of holes in rack segment (40 nos.) by engaging 02 nos skilled fitter, 02 nos. skilled welder, 02 nos. skilled machinist and 04 nos. unskilled helper for 12 days in two shifts as per scope of work in NIT considering labour cost, profit and any other Cost.
Total cost of drilling of holes using heavy-duty Auto-feed radial drilling machine
Labour charges for refitting of 05 nos. rack segemnt including shrink-fitting of barrel bolts & joints studs by engaging 02 nos skilled fitter, 01 no skilled welder and 04 nos. semi-skilled helper for 05 days in two shifts as per scope of work in NIT considering labour cost ,profit and any other Cost.
Total cost of liquid Nitrogen for shrink-fitting of bolts & studs
Labour charges for torquing of 128 nos. barrel bolts & 96 Nos. joining bolts and replacement of 960 Nos. manhole cover bolts by engaging 03 nos skilled fitter and 06 nos. semi-skilled helper for 12 days in two shifts as per scope of work in NIT considering labour cost ,profit and any other Cost.
Total cost ofremoval, fitting & tightening of 960 nos. manholes cover bolts.
Cost towards engagement of 01 no supervisor for 56 days in two shifts considering profit and any other cost.
Hiring cost of 03 nos. welding machine with accocessories for 20 days.
Hiring cost of 02 nos. gas cutting set with accocessories for 20 days.
Hiring cost of 02 nos Hyd Jack (200T) for 20 days.
Hiring cost of 02 nos. grinder for 20 days.
Hiring cost of 05 nos. hand lamp with bulb for 20 days.
Hiring cost of 05 nos. exhaust fan for 20 days.
Transpotation charge
Cost of Misc. tool & tackles like chipping hammers, tie rods, wedges hammers, crowbar etc.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_363110.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid