Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
12 Apr 2021, 11:00 amClosed
EE, NH DIVISION MOTIHARI
EE, NH DIVISION MOTIHARI
Preparation of DPR for New Alignment for 2lanes with PS configuration of stretch from km 95.200 near SSB Camp Ausani village to near UP Border on NH727 in the boundary zone of Valmiki wildlife Sanctuary along Gandak river bank in Bihar State
2021_MoRTH_622704_1
NH/MOT/DPR/03/2020-21
Open Tender
Consultancy
Lump-sum
122 days
SSB Camp Ausani village
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
As per NIT
Exempted
As Per NIT
15 Jul 2021
16 Mar 2021
13 Apr 2021
16 Mar 2021
12 Apr 2021
16 Mar 2021
23 Mar 2021
Amount
KEY PERSONNEL :
Team Leader cum Senior Bridge Engineer
Bridge Structural Engineer
Highway cum Pavement Engineer
Material cum Geotechnical Engineer - Geologist
Senior Survey Engineer
Senior Geologist
Environmental Specilist
Quantity Surveyor / Documentation Expert
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
SUPPORT STAFF :
Office Manager
Typist
Office Boy
Night Watchman
Transportation (Fixed Costs)
The Vehicles Provided by the consultants shall include the cost for rental drivers operation, maintenance, Repairs, insurance etc., A. For use of Consultant
Duty Travel to Site(Fixed Costs):
Office Rent (Fixed Costs) The rent includes maintenance, cleaning, repairing etc.,
OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
OFFICE FURNITURE AND EQUIPMENT (Rental)
Office Furniture and Ecquipment ( L.S)
REPORTS & DOCUMENTS PRINTING ( For Clubbed Projects)
Monthly report (3copies per Month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment Report & RAP
Final Environmental Assessment Report and RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP.
Final Bidding Documents
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
LA & Clearances II Report
Survey and Investigation
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile / aerial LiDAR or better Technology
Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffice Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other Investigations/Surveys
Sub-Soil Investigation (Boring)
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Network Survey and GPR
Network Survey of the existing Highways as a repository for civil works as per directions from Authority
GPR Survey for detection of under ground utilities
Cost of Supply and Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Land Acquisition Team including support staff and logistics/ transportation
Ex-Land Revenue Inspector/ Officer or equivalent
Ex-Kanoogo/Girdwar or equivalent
Ex-Patwari or Equivalent
Typist
B. Logistics for Land Acquisition Team
Computer including necessary peripherals
Printers
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km
Estimate of Costs for Expatriate Consultants (in Indian Rupees)
I. Remuneration of Expatriate Staff including per diem allwances
II. Mobiliation and Demobilization
1. International Airfares (Fixed Costs)
Total Cost Net of Tax:
I. Income Tax (Expatriate Staff)
II. Other Taxes/ duties (if any) Specify Clearly
Goods and Service Taxes @ 18%
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .