| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC BARWADIH LATEHAR | 1 | Accepted-AOC as per committee resolution Agreement executed | |
| 2 | 2₹6.0 L+₹6,320.34 (1.07%)Rejected-Finance PARAMBILPEEDIKA PANIKKARPADI NSS ROAD KERALA | KOZHIKODE | KERALA | 612906 | 2 | Rejected-Finance as per commitee resolution |
| Sl No | Description | Qty | Unit | NARAYANAN K L2 | Ajay Kumar L1 |
|---|---|---|---|---|---|
| 1.00Side protetion | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 31.93 | cum | 305 ₹9,740.18 | 298.5 ₹9,532.6 Lowest |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 138.14 | cum | 3,550 ₹4,90,407.65 | 3,513 ₹4,85,296.36 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 6.79 | sqm | 345 ₹2,343.24 | 337 ₹2,288.9 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 99.58 | kilogram | 99 ₹9,857.93 | 98.9 ₹9,847.97 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 1.45 | cum | 8,060 ₹11,646.7 | 8,040 ₹11,617.8 Lowest |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.9 | cum | 8,700 ₹33,947.4 | 8,642 ₹33,721.08 Lowest |
| 1.01 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 2.35 | cum | 7,240 ₹17,050.2 | 7,216 ₹16,993.68 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 22.61 | sqm | 320 ₹7,234.56 | 316 ₹7,144.13 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 107 | kg | 160 ₹17,120 | 155 ₹16,585 Lowest |
Tender Value
₹5.9 L
EMD Value
₹14,828
Closing Date
29 Feb 2024, 6:00 pmClosed
Assistant Engineer
Assistant Engineer, LSGD Section, perumannaklari GP
COMPOUND WALL
2024_LSGD_662612_1
AE/LSGD/PMKY/ET8/2023-24
Open Tender
Civil Works - Others
Item Rate
180 days
Perumannaklari GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,310
Yes
₹14,828
Yes
30 Aug 2025
22 Feb 2024
2 Mar 2024
22 Feb 2024
29 Feb 2024
22 Feb 2024
Amount
Side protetion
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
NARAYANAN K
Bidder Name
NARAYANAN K
Ajay Kumar
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .