GANDHINAGAR MUNICIPAL CORPORATION
CONSTRUCTION OF NEW CLASS ROOMS IN NABHOI PRIMARY SCHOOL AT NABHOI VILLAGE OF GMC AREA
281121
169/2025-26
Open
Civil - All
Works
Gandhinagar
3 documents required · 3 mandatory
₹4,248
Deputy Municipal commissioner Gandhinagar Municipal Corporation, Gandhinagar
₹1.2 L
27 Feb 2026
27 Feb 2026
27 Feb 2026
20 Mar 2026
27 Feb 2026
8 Section -7 Bill of Quantities 80 –
9 Section -8 Securities and Other Forms 84 –
10 Section -9 Drawings
11 Section -10 Documents to be furnished by 98 –
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
The Deputy Municipal Commissioner, CONSTRUCTION OF NEW CLASS ROOMS IN NABHOI PRIMARY
SCHOOLAT NABHOI VILLAGE OF GMC AREA
1. The bidders may submit bids for any or all of the following works.
Name of work Approximate Bid security Cost of Period of #Class of
value of works (Rs.) document completion Registration/
(Rs.) Category of
CONSTRUCTION OF NEW
CLASS ROOMS IN NABHOI Rs. Rs. Rs. 3600 + 06 Months “C” class &
PRIMARY SCHOOLAT 1,18,33,761.68/- 1,18,350 Rs. 648 (18% Above
NABHOI VILLAGE OF GMC /- GST) = Rs.
2. Prospective / Interested bidder may download the Bid Documents from Dt. 00-00-2025 to 00-
00/2025 Till 00:00 Hours website https:// www.tender.nprocure.com free of cost till the
Time and Date as mentioned on online NIT at website https:// www.tender.nprocure.com.
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document Fee
/Tender Fee through Demand Draft only of any Schedule Bank payable at Gandhinagar and in
favour of ‘The Deputy Municipal Commissioner, Gandhinagar Municipal Corporation,
Gandhinagar’. Once the Bid is received online, Bid Document / Tender Fee will not be
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against Bid Security
/ EMD shall be submitted in electronic format through online (by scanning) while uploading the
bid, this submission shall meaSn that bid document / tender fee and Bid Security / EMD has
been received. Accordingly, the offer of only those shall be opened whose Bid Document /
Tender Fee and Bid Security / EMD have been received electronically. However, for the purpose
of realization of Demand Draft, and FDR / Bank Guarantee bidder shall send the same in
original through
R.P.A.D. so as to reach to The Deputy Municipal Commissioner, Gandhinagar Municipal
Corporation (GMC) Pandit Dindayal Upadhyaya Bhavan, Behind Fire Station, Sector –
Gandhinagar within 7 Days from the last day of bid submission. (Between Dt.00-00-2025 to
00- 00-2025 up to 00:00 Hours)
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee in original
to The Deputy Municipal Commissioner, GMC, Gandhinagar bidder shall be initiated.
4. Bids received online, will be opened on the Dt. 00-00-2025 at 00:30 Hours at The Deputy
Municipal Commissioner, Gandhinagar Municipal Corporation (GMC), Gandhinagar as
specified in the online NIT at website https:// www.tender.nprocure.com in the presence of the
bidders or their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the bids will be
opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on Dt. 00-00-2025 at 00:30 Hours at the office of The Deputy
Municipal Commissioner, Gandhinagar Municipal Corporation (GMC), Gandhinagar to
clarify the issues and to answer questions on any
matter that may be raised at that stage as stated in clause 9.2 of ‘instructions to Bidders’
of the bidding documents.
6. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be
rounded off to the next thousand rupees.
7. Other Information is as under:
a. Agencies can prepare and edit their offers a number of times before the end of the tender
submission date and time. After the tender submission date and time, the bidder cannot modify
/ edit / withdraw their submitted offer in any case. No written or online request in this regard
shall be granted.
b. Offers in physical form will not be accepted in any case.
c. Demand Draft purchased by the other then bidder and issued after the last date of submission of
Bids, will not be considered or accepted.
d. The cost incurred by the contractor for this offer for clarification or attending discussion,
conferences or site visits will not be reimbursed by the Employer or Engineer-in-Charge.
e. Conditional tender shall not be accepted.
f. Any changes, addition, alternation made in the prescribed form attached with tender are liable
to be rejected.
g. Any change in format or conditional Bank Guarantee will not be accepted and the bidder will be
considered non-responsive.
h. All the bidders are instructed to fill in information strictly in accordance with the format given
in the checklist /qualification document / tender document.
i. It is mandatory for the bidders to supply each and every information as asked strictly in
electronic format at appropriate places only.
j. Blank / insufficient information shall be treated as nil information and shall result in
disqualification.
k. Even if the bidder has been qualified in a similar or larger size of project in the past, it shall not
be deemed to be a ground / reason for not giving required information for this work / bid.
l. Information supplied for earlier projects shall not be considered while evaluation of this bid.
The Government will not ask for any other information, unless it is found absolutely necessary
by the competent authority.
m. If found necessary, the contractor will be intimated for negotiation,
following documents shall be submitted in electronic format only through online by scanning
and the (i) Bid Document Fee / Tender Fee (ii) Bid Security / EMD should be sent in original
to the Tender opening authority through RPAD, so as to reach The Deputy Municipal
Commissioner, Gandhinagar Municipal Corporation (GMC) within 7 days from last day of
submission of Bid.
List of Mandatory Documents
Bid Document Fee / Tender Fee
Bid Security / EMD
Registration Certificate “C” class & Above
Litigation History
Bank Certificate
INSTRUCTIONS TO BIDDERS
Section 1: Instructions to Bidders
Table of Clauses
A. General D. Submission of Bids
Scope of Bid 19. Sealing & Marking of Bids
Source of Funds 20. Deadline for Submission of Bids
Eligible Bidders 21. Late Bids
Qualification of the Bidder 22. Modification and Withdrawal of Bids
One Bid per Bidder
Cost of Bidding E. Bid Opening and Evaluation
Site Visit 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial Bids
Content of Bidding Documents 26. Examination of Bids and Determination of
Clarification of Bidding Documents 27. Correction of Errors
Amendment of Bidding Documents 28. Deleted
29. Evaluation and Comparison of Financial Bids
C. Preparation of Bids 30. Deleted
Language of Bid
Documents Comprising the Bid F. Award of Contract
Bid Prices 31. Award Criteria
Currencies of Bid and Payment 32. Employer’s Right to Accept any Bid and to Reject any or all
Bid Validity 33. Notification of Award and Signing of Agreement
Bid Security 34. Performance Security
Alternative Proposals By Bidders 35. Advance Payment and Security
Format and Signing of Bid 36. Dispute Review Expert
37. Correct or Fraudulent Practices
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works
(as defined in these documents and referred to as ‘the works”) detailed in the table
given in IFB. The bidders may submit bids for any or all of the works detailed in the
table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their
derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat /
Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including
drawings and charts, as necessary. The proposed methodology should include a
program of construction backed with equipment planning and deployment duly
supported with broad calculations and quality assurance procedures proposed to be
adopted justifying their capability of execution and completion of work as per
technical specifications, within stipulated period of completion.
4.5 QUALIFICATION CRITERIA:
(Applicable for the works which require Post Qualification)
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/
fail criteria regarding the Applicant’s general and particular experience, personnel
and equipment capabilities and financial positions, as demonstrated by the
applicant’s responses in the forms attached to the letter of application ( specified
requirement for joint ventures are given under para 4.6 below ) Subcontractors
experience and resources shall not be taken in to account in determining the
applicants compliance with the qualifying criteria
To qualify for more than one contract, the applicant must demonstrate having
experience and resources sufficient to meet the aggregate of the qualification
criteria for each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed and the
financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
Applicant should indicate actual figures of costs and amount for the works
executed by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign
currency the above enhanced multiplying factors will not be applied. Instead, the
current market exchange rate (State Bank of India BC Selling rate as on the last date
of submission of the bid) will be applied for the purpose of conversion of the
amount in foreign currency into India rupees.
4.5.3. General Experience.
Similar Nature of Work :
The bidder must have completed similar nature of work i.e., Construction Any type
of Building work within last Five financial years and up to one month prior to last
date of submission of the bid of value not less than in One Contract 40% of
estimated cost+gst (Rs.47,33,504/ + Rs. 8,52,031/- = Rs.55,85,535 /-) estimated
cost in Gov. / semi Gov. / ULB with in last five years.
The Applicant shall meet with the following minimum criteria:
Bidder must have achieved minimum average annual financial turnover (at current price
level) from contract receipt of works (in all classes of civil engineering construction works
only) Of Rs.19,11,840/- (Min. 50% of Tender Cost) in Last Five financial years i.e. from
April-2019-20 to March – 2023-24
The details pertaining to turnover shall be certified by Chartered Accountant on his own letter
head and duly attested. Turnover of April 2022-23 to March 2024-25 financial year shall be
considered subject to submission of provisional/audited certificate from chartered accountant
The employers shall be submitted along with the application incorporating clearly the
name of the work, contract value, billing amount, date of commencement of works,
satisfactory performance of the contractor and any other relevant information.
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5. Equipment Capabilities:
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with
their bid, a detailed construction planning and methodology supported with layout
and necessary drawings and calculations to allow the employer to review their
proposals. The numbers, types and capacities of each plant/equipment shall be
shown in the proposals along with the cycle time for each operation for the given
production capacity to match the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid assets
(aggregate of working capital, cash in hand and uncommitted bank guarantees) and credit
facilities up to 25 percent of the value of the contract / contracts applied (29.58 lac) AS per
4.5.7. The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years If
necessary, the employer will make inquiries with the applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting
from contracts completed or under execution by him over the last five years. A consistent
history of awards against the Applicant or any partner of a joint venture may result in failure
of the applicant. The bidder Should Submit Detail As per Annexure at para 1.11 Of Section-2
Qualification information on their letter head, the decision of GMC shall be final in this
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualified if they have:
Made misleading or false representation in the forms, statements submitted, and /
or Record of poor performance such as abandoning the work, rescinding of contract
for which the reasons are attributable to the non – performance of the contractor;
consistent history of litigation awarded against the applicant or financial failure due
to bankruptcy. The rescinding of contract of a joint venture on account of reasons
other than non – performance, such as Most Experienced partner of joint venture
pulling out, court directions leading to breaking up of a joint venture before the start
of work, which are not attributable to the poor performance of the contractor will,
however, not affect the qualification of the individual partners.
4.6 JOINT VENTURE: Deleted
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if
their available bid capacity at the expected time of bidding is more than the total
estimated cost of the works. The available bid capacity will be calculated as
Assessed Available Bid Capacity = ( A*N*2-B), where
A = Maximum value of work executed in any one year during the last five years
(updated to the price level of the year indicated in appendix) taking into account
the completed as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing works
to be completed during the next 6 month ( period of completion of work for
which bids are invited ); and
N = Number of years prescribed for completion of the works for which the bids
Note: - In Case of joint venture, the available bid capacity will be applied for
each partner to the extent of his proposed participation in the execution of
4.8 Even though the bidders meet the above qualifying criteria, they are subject
to be disqualified if they have:
- Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and / or
Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to the
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals
with the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of
his Bid, and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and
examine the Site of work and its surrounding and obtain all information that may
be necessary for preparing the Bid and entering into a contract for construction of
Note: - The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and
addenda issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
Tender Notice / (SBD)
1 Instructions to Bidders
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as Volume-
V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, bill of quantities, forms, Annexes
and drawings in the Bid Document. Failure to comply with the requirements of Bid
Documents shall be at the bidder’s own risk. Pursuant to clause 26 hereof, bids
which are not substantially responsive to the requirements of the Bid Documents
shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may
notify the Employer in writing or through E-mail at the Employer’s address
indicated in the invitation to bid. The Employer will respond to any request for
clarification which he received earlier than 15 days prior to the deadline for
submission of bids. Employer’s response will be published on website including a
description of the enquiry but without identifying its source.
9.2. Pre-bid meeting (If Applicable)
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting which will
take place at the address, venue, time and date as indicated in the appendix.
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any matter
that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach the
Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the source of
enquiry) and the responses given will be published without delay on the tender website i.e.
www.nprocure.com. Any modification of the bidding documents listed in sub-Clause
which may become necessary as a result of the pre-bid meeting shall be made by the
Employer exclusively through the issue of an Addendum pursuant to Clause 10 and not
through the minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents
by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer will
assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into account in
preparing their bids, the Employer may, at his discretion, extend as necessary the deadline
for submission of bids, in accordance with Sub-Clause 20.2 below.
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause 8.1) shall
be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part
i.e. technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on
the priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and
words) for all items of the Works described in the Bill of Quantities along with total
(Both in figures and words). Items for which no rate or price is entered by the
bidder will not be paid for by the Bill of Quantities.
23. The rates quoted shall be Exclusive of GST, but inclusive of all other taxes and cess or
levies or duties which shall not be paid extra.
13.4 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 180 days after the deadline
date forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer
may request that the bidders may extend the period of validity for a specified period.
A bidder may refuse the request without forfeiting his bid security. A bidder agreeing
to the request will not be required or permitted to modify his bid, but will be
required to extend the validity of his security for a period of the extension, and in
compliance with Clause 16 in all respects.
#16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in
favor of Employer as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume III.
(Bank Guarantee is applicable only for Bid Estimated Amount of 01 Crore and above)
and Bank Guarantee of Schedule and Private Banks shall be considered as per GoG Finance
Department’s Circular No. FD/MSM/e- file/4/2023/0057/D.M.O. Date 21/04/2023 or as per
their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
# A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar Department of Govt
of Gujarat. Exemption Certificate is applicable only when Registration Certificate of
Appropriate Class and Category of Approved Contractors is required as eligible criteria
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for the
bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of 180+45 =
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated
in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of
the bid validity period specified in Sub-Clause
16.5 T h e Bid Security of the successful bidder will be discharged when the bidder has signed
the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid validity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He will be intimated maximum
three times within the validity period for negotiation, If contractor does not respond in time, his Bid
Security (EMD) will be forfeited and his tender will be rejected. Punitive action will be taken on such
contractors. (As per GoG R&B Dept’s Gr. No. S/22/2017/6369/D, Dt.08/06/2018)
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or
time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered further
in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of
these Instructions to bidder as the “Technical Bid “and “Financial Bid” in separate
parts to be uploaded.
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website specified
above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an amendment
in accordance with Clause 10, in which case all right and obligation of the Employer and
the bidders previously subject to the original deadline will then be subject to the new
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids
and the expiration of the original period of bid validity specified in Clause
above or as extended pursuant to Clause 15.2 may result in the forfeiture of the Bid
security pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant
to Clause 22, in the presence of the Bidders or their representatives who choose to
attend at time, date and the place specified in Appendix in the manner specified in
Clauses 20 and 23.3, In the event of the specified date of Bid opening being declared a
holiday for the Employer, the Bids will be opened at the appointed time and location
on the next working day.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security
furnished with each bid will be announced. If the bid security furnished does not
conform to the amount and validity period as specified in the invitation for bid (ref.
Column 4 and paragraph 3), and has not been furnished in the form specified in Clause
16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with respect to the
Qualification information and other information furnished in part I of the bid pursuant
to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification Documents
with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose financial bids
are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the total
amount of each bid, any discount and such other details as the Employer may consider
appropriate, will be announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found responsive
in accordance with Clause 23.4(iv) will be announced. The bids of only these bidders
will be opened. The responsive Bidders’ names, the Bid prices, the total amount of each
will be opened. The responsive Bidders’ names, the Bid prices, the total amount of each
bid, any discount, and such other details as the Employer may consider appropriate,
will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of
Bids and recommendations for the award of a contract shall not be disclosed to
Bidders or any other persons not officially concerned with such process until the
award to the successful Bidder has been announced. Any effort by Bidder to
influence the Employer’s processing of Bids or award decisions may result in the
rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may,
at his discretion, ask any Bidder for clarification of his Bid, including breakdowns of
unit rates. The request for clarification and the response shall be in writing or by e-
mail, but no change in the price or substances of the Bid shall be sought, offered, or
permitted except as required to confirm the correction of arithmetic errors
discovered by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relating to his Bid opening to the contract is awarded. If the Bidder wishes to bring
additional information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation,
bid comparison or contract award decision may result in the rejection of the Bidders’
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine
whether each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has
been properly signed; (c) is accompanied by the required securities and; (d) is
substantially responsive to the requirements of the Bidding document. During the
detailed evaluation of the “Financial Bid”, the responsiveness of the bids will be
further determined with respect to the remaining bid conditions, i.e., priced bill of
quantities, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits in
any substantial way, inconsistent with the Bidding documents, the Employer’s rights
or the Bidder’s obligations under the Contract; or (c) whose rectification would
affect unfairly the competitive position of other Bidders presenting substantially
responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be
substantially responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the requirements
of the Bidding documents or otherwise result in unsolicited benefits for the
shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not
be taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the
Engineer’s estimate of the cost of work to be performed under the contract the
Employer may require the Bidder to produce detailed consistency of those prices
with the construction methods and schedule proposed. After evaluation of the price
analyses, the Employer may require that the amount of the performance security set
forth in Clause 34 be increased at the expense of the successful /bidder to a level
sufficient to protect the Employer against financial loss in the event of default of the
successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be
rejected as non-responsive.
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid
has been determined.
(i) to be substantially responsive to the Bidding documents and who has offered the
lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price which is
the lowest evaluation in any of the packages opened earlier than the one
In no case, the contract shall be awarded to any bidder whose available bid capacity
is less than the evaluated bid price, even if the said bid is the lowest evaluated bid.
The contract will in such cases be awarded to the next lowest bidder at his
evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any
Bid, and to cancel the Bidding process and reject all Bids, at any time prior to the
award of contract, without thereby incurring any liability to the affected bidder or
Bidder or any obligation to inform the affected Bidder or Bidders of the grounds for
the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by cable, telex or facsimile
confirmed by registered letter. This letter (hereinafter and in the condition of
contract called the “Letter of Acceptance”) will state the sum that the Employer will
pay the Contractor in consideration of the execution, completion, and maintenance of
the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to
the furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder,
within 28 days following the notification of award along with the Letter of
Acceptance. Within 21 days of receipt, the successful Bidder will sign the Agreement
and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
34. Performance Security
34.1.(A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall
furnish to the Employer an irrevocable and unconditional guarantee from a Bank
in the form set forth in Section 8 (the “Performance Security”) for an amount equal
to 5% (five percent) of its Contract Price. In case of bids mentioned below, the
successful Bidder, along with the Performance Security,
shall also furnish to the Authority an irrevocable and unconditional guarantee
from a Bank in the same form given at Section 8 towards an Additional
Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but upto
20% of the Estimated Project Cost, then the Additional Performance Security
shall be calculated @ 20% of the difference in the (i) Estimated Project Cost (as
mentioned in Bid Document) - Minus 10% of the Estimated Project Cost and (ii)
Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the
Estimated Project Cost, then the Additional Performance Security shall be
calculated @ 30% of the difference in the (i) Estimated Project Cost (as
mentioned in Bid Document) - Minus 10% of the Estimated Project Cost and (ii)
Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days of the Defects
Liability Period and the Additional Performance Security shall be valid beyond
28 (twenty-eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a
Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and
acceptable to the Employer. As per GoG Finance Department’s Circular No.
FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of
the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated
in the Conditions of Contract, subject to maximum amount, as stated in the
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in completing for the
contract in question and will declare the firm ineligible, either indefinitely or for a
stated period of time, to be awarded a contract with National Highways Authority of
India/ State PWD and any other agencies, if it at any time determines that the firm
has engaged in corrupt or fraudulent practices in completing for the contractor, or
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of
the Conditions of Contract.
APPENDIX TO ITB
Clause Reference With respect to Section –I
1. The Name of the Employer is The Deputy Municipal [ Cl.1.1]
Commissioner, Gandhinagar Municipal Corporation (GMC),
2. The last five years.
3. This Annual Financial Turnover Amount is Rs. [Cl.4.5.3 (a)]
4. Value of Work is Rs. 1,18,33,761.68/-
8. Liquid assets and availability of credit facilities is Rs. [Cl.4.5.6 ]
9. Price level of the financial year 2025-2026 [Cl. 4.5.2]
10. The pre-bid meeting will take place at The Deputy Municipal [Cl. 9.2.1]
Commissioner, Gandhinagar Municipal Corporation (GMC),
11. The technical Bid will be opened at the office of the
12. Address of the Employer: The Deputy Municipal Commissioner,
Gandhinagar Municipal Corporation (GMC), Gandhinagar
14. The bid should be submitted latest by As stated on [Cl. 20.1 & 20.2]
15. The bid will be opened at GMC Office As stated on online NIT [Cl. 23.1 ]
16. The Bank Draft in favor of The Deputy Municipal Commissioner,
Gandhinagar Municipal Corporation (GMC), Gandhinagar
18. Escalation factors (for the cost of works executed and financial [Cl.4.5.2]
figure to a common base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they
propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this
work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work
to be executed is more than Rs.50 lakh
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed
is more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs
but more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to be
executed is less than Rs. 5 lakhs. The Engineer so employed for the Government work
must have sufficient experience to handle the work independently. Such an Engineer
shall have to stay at the site of work and he shall not be entrusted with other duty
except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the
Deputy Executive Engineer-in-charge of the work the Name, Qualifications, copy of
marksheet, Colour Photograph and the appointment order issued such engineers
engaged for this contract work. If 15 days after issue of work order such designated
Site Engineers do not resume or do not remain present on site of work, the recovery at
the rate of Rs.15,000-00 per month per Engineer will be made from the
bills/deposit/dues of the contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for
the purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders.
This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of
Bidder (Attach Copy)
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2024-2025
Work performed in the last five years 2023-2024
(in Rs. Lakhs) 2022-2023
15.2.1 Work performed as prime contractor, work performed in the past as a nominated
sub- contractor will also be considered the sub-contract involved execution of all
main items of work described in the bid documents, provided further that all other
qualification criteria are satisfied (in the same name) on works of a similar nature
over the last five years** and in current year before the submission of the bid.
Project Name of Description Contract Value of Date Stipulated Actual date Remark
Name the of work No. contract of period of of explaining
Employer (Rs. issue completion completion* reasons for
Crore) of delay &
order Completed
*Attach certificate(s) from the Engineer(s)in-charge
** Immediately preceding the financial year in which bids are received.
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a
nominated sub-contractor, will also be considered provided the sub-contract
involved execution of all main items of work described in the bid document,
provided, further that all other qualification criteria are called (in the same name and
style) in the last five years** and in current year before the submission of the bid.
Year Name Name of Quantity of work performed (Cum/MT) Remarks*
of the the Cement Masonry Earth Bituminous (indicate
work Employer Concrete Works Work contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works
which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place Contract Name & Value Stipulated Value of Anticipated
of works & No. Address Contract Period of Works* of
State of (Rs. Cr) Completion remaining completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of
the Conditions of Contract.
Position Name Qualification Year of Year of
Experience experience in
(General) the proposed
Project Manager
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Sub-Contractor Experience in
works Contractor (Name & similar work
Attach copies of certificates on possession of valid license for executing water
supply/ sanitary work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and
1.9 Evidence of access to financial resources to meet the qualification requirements:
cash in hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction
to Bidders. (Name of Consultant engaged for project preparations is.)
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs. to meet their working capital requirements for executing the
above during the contract period.
Senior Bank Manager
(on non-judicial stamp paper of Rs 300/- appropriate value, duly attested by
1. I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us for
such works have been rescinded, during last five years prior to the date of this
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested
by the Department to verify this statement or regarding any (our) competence
and general reputation.
4. The Undersigned understands and agrees that further qualifying information
may be requested, and agrees to furnish any such information at the request of
the Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake ......... that our firm
up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 37 37 Bill of Quantities
2 Interpretation 38 38 Changes in the Quantities
3 Language and Law 39 39 Variations
4 Engineer’s Decisions 39 40 Payments for Variations
5 Delegations 39 41 Cash Flow Forecasts
6 Communications 39 42 Payment Certificates
7 Sub-Contractors 39 43 Payments
8 Other Contractors 39 44 Compensations Events
9 Personnel 40 45 Tax
10 Employer’s & Contractor Risk 40 46 Currencies
11 Employers Risks 40 47 Price Adjustment
12 Contractor’s Risk 40 48 Retention
13 Insurance 40 49 Liquidated damages
14 Site Investigations Reports 41 50 Bonus
15 Queries about the Contract 41 51 Advance Payment
16 Contractors to Construct the 41 52 Securities
17 The Works to be Completed By 41 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 41 54 Cost of Repair
20 Discoveries 42 E. Finishing the Contract
21 Possession of the Site 42 55 Completion
22 Access to the Site 42 56 Taking Over
23 Instructions 42 57 Final Account
24 Disputes 42 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 43 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 44 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 44 F. Special Conditions of
30 Delays Ordered by The 44 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 45 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the
Conditions of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming part
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by the
Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute,
complete and maintain the Works till the completion of Defects Liability
Period. 1 Years (12 Month) It consists of the documents listed in Clause
The Contract data defines the documents and other information which comprise
The Contractor is a person or corporate body whose Bid to carry out the Work
has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the
Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter
as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and
calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the Works.
The Engineer is the person named in the Contract Data (or any other competent
person appointed and notified to the contractor to act in replacement of the
Engineer) who is responsible for supervising the Contractor, administering the
Contract, certifying payments due to the Contractor, issuing and valuing
Variations to the Contract, awarding extensions of time, and valuing the
Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to the
site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified in
the Contract Data. The Intended Completion Date may be revised only by the
Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the
Contract and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the
Contractor shall commence execution of the works. It does not necessarily coincide
with any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the
Contractor to carry out a part of the work in the Contract which includes work on
Temporary Works are works designed, constructed, installed, and removed
by the Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works. The
Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also
means female or neuter and the other way around. Heading have no significance.
Words have their normal meaning under the language of the Contract unless
specifically defined. The Engineer will provide instructions clarifying queries about
Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended Completion
Date apply to any Section of the Works (other than references to the Completion
Date and Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following order of
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the Contract.
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual
matters between the Employer and the Contractor in the role representing the
5.1 The Engineer may delegate any of his duties and responsibilities to other people
after notifying the Contractor and may cancel any delegation after notifying the
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is delivered
(in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the Contract
without the approval of the Employer in writing. Subcontracting shall not alter the
Contractor’s obligations. Sub-contracting of supply or specific items of work is
7.2 The sub-contractor must be registered in appropriate class and category for the
part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public
authorities, utilities and the Employer between the dates given in the Schedule of
other Contractor. The Contractors shall as refer to in the Contract Data, also provide
facilities and services for them as described in the Schedule. The employer may
modify the schedule of other contractors and shall notify the contractor of any such
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated in the
Schedule or other personnel approved by the Engineer. The Engineer will approve
any proposed replacement of key personnel only if their qualifications, abilities,
and relevant experience are substantially equal to or better than those of the
personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of the
Contractor Staff or his work force stating the reasons the Contractor shall ensure
that the person leaves the Site within seven days and has no further connection with
the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks, and
the Contractor carries the risks which these Contracts states are Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they
directly affect the execution of the Works, the risks of war, hostilities, invasion, act
of foreign enemies, rebellion, revolution, insurrection or military or usurped power,
civil war, riot commotion or disorder (unless restricted to the Contractor’s
employees), and contamination from any nuclear fuel or nuclear waste or
radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and death
which arise during and in consequence of the performance of the Contract other
than the excepted risks are the responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects Liability
Period, in the amounts and deductibles stated in the Contract data for the following
events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials
and Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the
Engineer for the Engineer’s approval before the Start Date. All such insurance shall
provide for compensation to be payable in the types and proportions of currencies
required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required, the
Employer may affect the insurance which the Contractor should have provided and
recover the premiums the Employer has paid from payments otherwise due to the
Contractor or, if no payment is due, the payment of the premiums shall be a debt
13.4 Alterations to the terms of an insurance shall not be made without the approval of
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports
referred to in the Contract Data, supplemented by any information available to the
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and shall
carry out the Works in accordance with the programme submitted by the
Contractor, as updated with the approval of the Engineer, and complete them by the
Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed
Temporary works to the Engineer, who is to approve them if they comply with the
Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of
the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the Temporary
works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary or
permanent work are subject to prior approval by the Engineer before their use.
18.6 The contractor shall carry out all the process “Detailed Design” of civil structural and
electrical and instrumentation designs and submit to client or their representative
for review and approval before executing the same. This is applicable to all the
components of this project.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to notify
the engineer of such discoveries and carry out the Engineer’s instructions for
dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and this
will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not
handed over to the Contractor, then contractor/ Employer may fore-close the
contract. Contractor/Employer has to foreclose the work within 30 days after
lapse of 25%-time limit and after 30 days foreclosure option will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any place
where materials or plants are being manufactured/ fabricated/ assembled for
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts
and records relating to the performance of the Contractor and to have them
audited by auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to Municipal Commissioner, GMC
within 14 days of the notification of the Engineer's decision. If the issue is not
resolved, any party can refer the matter for conciliation within 15 days from the
decision given by the #Superintending Engineer.
If the dispute is not resolved through the conciliation process, he may refer the
dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the
Contractor fails to refer a claim / dispute to the Higher Authority within 14 days
of the notification of the Engineer's decision, the Contractor shall not be entitled
to any additional payment/claim if he doesn’t follow the above sequence in
stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods, arrangements
orders, and timing for all the activities in the works along with monthly cash
27.2 An update of the Programme shall be a programme showing the actual progress
achieved on each activity and the effect of the progress achieved on the timing of
the remaining work including any changes to the sequence of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract data. If
the Contractor does not submit an updated programme within this period, the
Engineer may withhold the amount stated in the Contract data from the next
payment after the date on which the overdue programme has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation Event
occurs or a Variation is issued which makes it impossible for completion to be
achieved by the Intended Completion Date without the Contractor taking steps to
accelerate the remaining work and which would cause the Contractor to incur
additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a
decision upon the effect of a compensation event or Variation and submitting full
supporting information. If the Contractor has failed to give early warning of a
delay or has failed to cooperate in dealing with a delay, the delay by this failure
shall not be considered in assessing the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the Employer his
decision. The employer shall in not more than 21 days communicate to the
engineer the acceptance or otherwise of the Engineer’s decision. If the employer
fails to give his acceptance, the Engineer shall not grant the extension and the
contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to review
the plans for remaining work and to deal with matters raised in accordance with
the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the Employer.
The responsibility of the parties for actions to be taken is to be decided by the
Engineer either at the management meeting or after the management meeting
and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific
likely future events or circumstances that may adversely affect the quality of the
work, increase the Contract price or delay the execution of works. The Engineer
may require the contractor to provide an estimate of the expected effect of the
future event or circumstance on the contract price and completion date. The
estimate is to be provided by the Contractor as soon as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided or
reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
C. QUALITY CONTROL
33. Identifying Defects/ Defect liability period
33.1 : Defect liability period : The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of completion. The
Engineer in charge shall give the contractor a notice in writing about the defects
and the contractor shall make good the same within 15 days of receipt of the
notice. In the case of failure on the part of the contractor, the Engineer- in-charge
may rectify or remove or re-execute the work at the risk & cost of the contractor.
The Engineer- in-charge shall be entitled to appropriate the whole or any part of
the amount of security deposit towards the expenses, if any, Incurred by him in
rectification, removal or re-execution. The Defects Liability period shall be as
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall
be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put
tender), the period shall be 12 (Twelve) months from the certified date of
completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be 36 Months
from the certified date of completion which should include three monsoons.
(d) For original building works the defect liability period will be 4 years or elapse of
4 monsoon period following date of possession of building taken over by user
agency following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be
treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular
No.TNC/10/2016/Clause 17A (Correction/(1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year from the
date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee from the
certified date of completion. During this period the contractor shall visit the site
every six months along with the concerned Section Officer / Deputy Executive
Engineer and will examine the work already carried out in this contract like road
work, jungle cutting, side shoulders, side gutter, road furniture, patta etc. and will
prepare Km. wise inspection report duly signed by all concerned and any defect
observed shall be done within 15 days by the contractor at his risk and cost as per
the direction of Engineer in charge. The contractor needs to do videography of these
visits and require to submit at the time of release of FMG. If B.T. the surface during
the maintenance period of 4 years is worn out then agency shall have to provide
renewal coating as per tender item as directed by the Engineer-in- charge. The
amount equivalent to 5% of each running bill shall be withheld and will be
released after the free maintenance guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or bank guarantee
pledged in the name of Executive Engineer after completion certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under no
circumstances shall exceed the allowable limit set forth in the relevant clause for the
material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be withheld till the
miscellaneous items like earthwork in embankment / cutting for side shoulders, side
gutters, kilometer / indicator / guard stones, sign boards etc. are completed in all
respect by the contractor. After completion of the miscellaneous items, the above said
2% withheld amount shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd. 13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as per Govt.
letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing more than Rs.
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate equipment. Till the
setting up of adequate laboratory is completed & reported of this to the engineer
(subject to due verification by engineer’s representative) by contractor in writing,
Rs.2,00,000/- shall be withheld. The qualified quality Engineer shall be deployed
exclusively for this contract by the contractors. If quality Engineer is not deployed by
contractor within one month after the date of work order, the amount equivalent to
Rs.20,000 per month shall be recovered till the actual deployment of quality engineer.
The amount so recovered towards the deployment of quality engineers shall not be
(5) Asphalt work will have to be cross checked as per G.R. No.: RGN/60/2006/35/C,
dtd.31/05/07 before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own risk and cost,
the existing lane(s) of the road so that the traffic worthiness and safety thereof are at no
time materially inferior as compared to their condition 10 (ten) days prior to the date of
the Agreement, and shall undertake the necessary repair and maintenance works for
this purpose; provided that the Contractor may, at his cost, interrupt and divert the flow
of traffic if such interruption and diversion is necessary for the efficient progress of
works and conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken by the Contractor
only with the prior written approval of the City Engineer GMC which approval shall
not be unreasonably withheld. For the avoidance of doubt, it is agreed that the
Contractor shall at all times be responsible for ensuring safe operation of the road.
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of any
defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a Defect and
to uncover and test any work that the Engineer considers may have a Defect.
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that it
does, the Contractor shall pay for the test and any samples. If there is no defect the
test shall be a Compensation Event.
34.2 #1% of the amount of work done should be deducted from R.A. Bill of the
contractor for testing the quality of material workmanship, irrespective of actual
34.3 Agency has to establish testing laboratory on site for the various test to be carried
out in the work for this purpose agency shall construct a pukka laboratory building
with all facility on site at location specified by the engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end of the
defects Liability Period, which begins at Completion and is defined in the contract
data. The Defects Liability Period shall be extended for as long as Defects remain to
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified defect
within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect corrected,
and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is paid
for the quantity of the work done at the rate in the Bill of Quantities for each item.
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the original
specifications , drawings, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be
bound to carry out the work in accordance with any instruction in this connection
which may be given to him in writing signed by the Engineer and such alteration
shall not invalidate the contract and any additional work which the contractor may
be directed to do in the manner above specified as part of the work shall be carried
out by the contractor on the same conditions in all respects on which he agreed to
do the main work and at the same rate as are specified in the tender for the main
Except that when the quantity of any item exceeds the quantity as in the tender by
more than 130%, the contractor will be paid for the quantity in excess of 130%, at
the rate entered in the SOR of the year during which the excess in quantity is first
39.1 All Variations shall be included in updated programmes produced by the Contractor.
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the
one involving additional or altered class of work; where there are more than one
comparable items, the item of the contract which is nearest in comparison with
regard to class or classes of the work involved shall be selected and the decision of
the Superintending Engineer as to the nearest comparable item shall be final and
binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall
be carried out at the rate entered in the Schedule of Rates of the division
for the year in which the tender was received, increased or decreased by the
percentage by which the tender amount is more or less as compared to the amount
arrived at the rates in the “Schedule of Rates” of the Division in the year in which
the tender was received. If the Schedule of rates of the Division does not contain all
the items, the percentage increase or decrease of the tender shall be calculated
considering such items which were included in the “Scheduled Rates” of the
division for the year and for materials consumed on such item the rate to be
charged would be the basic rate taken into account for fixing the rate in S.O.R.
referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work
shall be carried out at the rate decided by the competent authorities on the basis
of detailed rate analysis after hearing the contractor before a Committee of two
Executive Engineers stationed at the same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of
Rates” of the Division is ordered to be carried out before the rate is agreed upon,
then the contractor shall within seven days of the date of receipt by him of the order
to carry out the work, inform the Engineer-in-charge of the rate, which it is his
intention to charge for such class of work and if the Engineer in charge does not
agree to this rates, he shall by notice in writing be at liberty to cancel his order to
carry out such class of work and arrange to carry it out in such manner as he may
consider it advisable, provided always that if the contractor shall commence work
or incur any expenditure in regard thereof before the rates shall have been
determined as lastly herein before mentioned, then in such cases he shall only be
entitled to be paid in respect of the work carried out or expenditure incurred by him
prior to the date of the determination of the rate as aforesaid according to such rate
or rates as shall be fixed by the Engineer-in-charge. In the event of the dispute, the
decision of the GMC of the Circle shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted by the
competent authority, the alternation above referred to shall be within the scope of
such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to the cost
of the original work and the certificate of the Engineer-in-charge as to such
proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with an
updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the estimated
value of the work completed less the cumulative amount certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days and
certify the amount to be paid to the Contractor after taking in to account any credit
or debit for the month in question in respect of materials for the works in the
relevant amounts and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the items
in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or reduce the
proportion of any item previously certified in any certificate in the light of later
43.1 Payments shall be adjusted for deductions for advance payments, retention, other
recoveries in terms of the contract and taxes at source, as applicable under the law.
The Employer shall pay the Contractor the amounts certified by the Engineer
within 28 days of the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the contract to the
Contractor will be made by the Employer. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be paid
by the Employer and shall be deemed covered by other rates and prices in the
44. Compensation events
44.1 The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to a part of the Site by the site Possession
date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed
beyond the Intended Completion Date then Authority will approve EOT with
eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on due
date of bid submission except GST. However, any subsequent changes in the tax
structure by Government after due date of bid submission will be compensated (+/-
) on availability or submission of actual documentation. Contractor will have to
intimate Engineer regarding changes occurred in the tax structure after bid
submission. If the contractor fails to provide such information and if any financial
obligation may arise due to change in tax structure, same will be recovered from
the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of
labour, materials, fuels and lubricants in accordance with the following principles
and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date given in the
contract data up to end of the initial intended completion date or extensions
granted by the Engineer and shall not apply to the work carried out beyond the
stipulated time for reasons attributable to the contractor.
(b) The price adjustment shall be determined during each month from the formula
given in the contract data.
(c) Following expressions and meanings during to the work done during each month
R = Total value of work done during the month. It would include the amount of
secured advance granted, if any, during the month less the amount of secured
advance recovered, if any during the month. It will exclude value for works
executed under variations for which price adjustment will be worked separately
based on the terms mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the contractor is
not covered by the provisions of this or other clause in the contract, the unit rates
and prices included in the contract shall be deemed to include amounts to cover the
contingency of such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the proportion
stated in the Contract Data until Completion of the whole of the Works.
48.2 On Completion of the whole of the Works half the total amount retained is repaid to
48.2 On Completion of the whole of the Works half the total amount retained is repaid to
the Contractor and half when the Defects Liability Period has passed and the
Engineer has certified that all Defects notified by the Engineer to the Contractor
before the end of this period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention money
with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by
the Employer under the provision of this clause, Employer shall consider the said
request of the Contractor provided that the refund hereunder shall be made in
tranches of not less than 1% (One Percent) of the Contract Price and Contractor
furnishes an irrevocable and unconditional Bank guarantee for an equal amount
substantially in the format of Bank Guarantee for Performance Guarantee enclosed
with SBD and valid up to 60 day beyond the scheduled / extended Defects Liability
Period. On completion of the whole works, the contractor has however an option to
submit a fresh irrevocable and unconditional Bank Guarantee for an amount equal
to 5% of the total value of work executed substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to 60 days
beyond the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per day
stated in the Contract Data for each day that the Completion Date is later than the
Intended Completion Date (for the whole works or the milestone as stated in the
contract data). The total amount of liquidated damages shall not exceed the amount
contract data). The total amount of liquidated damages shall not exceed the amount
defined in the Contract Data. The Employer may deduct liquidated damages from
payment due to the Contractor. Payment of liquidated damages does not affect the
Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have been
paid, the Engineer shall correct any overpayment of liquidated damages by the
Contractor by adjusting the next payment certificate. The Contractor shall not be
entitled for any interest on the over payment calculated from the date of payment to
the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in the
tender, then the contractor shall pay to the employer the relevant sum stated in the
Contract Data as Liquidated damages for such default and not as penalty for
everyday or part of day which shall elapse between relevant time for completion
and the date stated in the taking over certificate of the whole of the works on the
relevant section, subject to the limit stated in the contract data.
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to the
contractor. The payment or deduction of such damages shall not relieve
the contractor from his obligation to complete the works on from any other of his
obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable any
Section, a Taking Over Certificate has been issued for any part of the Works or of a
Section, the liquidated damages for delay in completion of the remainder of the
Works or of that Section shall, for any period of delay after the date stated in such
Taking-Over-Certificate, and in the absence of alternative provisions in the
Contract, be reduced in the proportion which the value of the part so certified bears
to the value of the whole of the Works or Section, as applicable. The provisions of
this Sub-clause shall only apply to the rate of liquidated damages and shall not
affect the limit thereof.
50 Bonus - Deleted
51. Advance Payment. - Deleted
52.1 The performance Security (including additional security for unbalanced bids) shall
be provided to the Employer no later than the date specified in the Letter of
Acceptance and shall be issued in an amount and form and by a bank or surety
acceptable to the Employer, and denominated in Indian Rupees. The performance
Security shall be valid until a date 60 days from the date of expiry of Defects
Liability Period and the additional security for unbalanced bids shall be valid until a
date 28 days from the date of issue of the certificate of completion.
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works between
the Start date and the end of Defects Correction periods shall be remedied by the
Contractor at the Contractor’s cost if the loss or damages arises from the
Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion of the
works and the Engineer will do so upon deciding that the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the total
amount that the Contractor considers payable as full and final settlement of all
claims under the Contract for items before the end of the Defects Liability Period.
The Engineer shall issue a Defect Liability Certificate and certify any final payment
that is due to the Contractor within 56 days of receiving the Contractor's account if
it is correct and complete. If it is not, the Engineer shall issue within 56 days a
schedule that states the scope of the corrections or additions that are necessary. If
the Final Account is still unsatisfactory after it has been resubmitted, the Engineer
shall decide on the amount payable to the Contractor and issue a payment
certificate, within 56 days of receiving the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses and
savings in final account is observed, the Engineer/Employer shall be at liberty to
restrict the final payment of BOQ items to the lowest amount evaluated of the bids
considering the final quantities and the rates quoted including the rebates if any.
Payment of variation items shall however be made at the rates approved by the
Employer, within 90 days from the physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are required, the
Contractor shall supply them by the dates stated in the Contract data.
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates stated
in the Contract data, or they do not receive the Engineer’s approval, the Engineer
shall withhold the amount stated in the Contract Data from payments due to the
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the following:
1. The contractor stops work for 28 days when no stoppage of work is shown on the
current programme and the stoppage has not been authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the Works and the
instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation other
than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the Contractor
within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it within a
reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of days for
which the maximum amount of liquidated damages can be paid as defined in the
Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering,
giving, receiving or soliciting of anything of value to influence the action of a public
official in the procurement process or in contract execution. “Fraudulent practice”
means a misrepresentation of facts in order to influence a procurement process or
the execution of a contract to the detriment of the borrower, and includes collusive
practice among Bidders (prior to or after bid submission) designed to establish bid
prices at artificial non-competitive levels and to deprive the Borrower of the
benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by the
Contractor, the Engineer shall issue a Certificate for the value of the work done less
advance payments received up to the date of the issue of the
certificate, less other recoveries due in terms of the contract, less taxes due to
deducted at source as per applicable law and less the percentage to apply to the
work not completed as indicated in the Contract data. Additional Liquidated
Damages shall not apply. If the total amount due to the Employer exceeds any
Damages shall not apply. If the total amount due to the Employer exceeds any
payment due to the Contractor the difference shall be a debt payable to the
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought by
the contractor and available at site, the reasonable cost of removal of equipment,
repatriation of the Contractor’s personnel employed solely on the works, and the
Contractor’s cost of protecting and securing the Works and less advance payment
received up to the date of the certificate, less other recoveries due in terms of the
contract and less taxes due to deducted at source as per applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because of a
Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event entirely
outside the control of either the Employer or the Contractor the Engineer shall
certify that the Contract has been frustrated. The Contractor shall make the Site safe
and stop work as quickly as possible after receiving this certificate and shall be paid
for all work carried out before receiving it and for any work carried out afterwards
to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his
own arrangements for the engagement of all staff and labour, local or other, and
for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a
return in detail, in such form and at such intervals as the Engineer may prescribe,
showing the staff and the numbers of the several classes of labour from time to
time employed by the Contractor on the site and such other information as the
Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor
shall abide at all times by all existing labour enactments and rules made
thereunder, regulations, notification and bye laws of the State or central
Government or local authority and any other labour law (including rules),
regulations, bye laws that may be passed or notifications that may be issued
under any labour law in future either by the State or the Central Government or
the local authority. Salient features of some of the major labour laws that are
applicable to the construction industry are given below. The Contractor shall keep
the Employer indemnified in case any action is taken against the Employer by the
competent authority on account of contravention of any of the provisions of any
Act or rules made thereunder, regulations or notifications including amendments.
If the Employer is caused to pay or reimburse, such amounts as may be necessary
to cause or observe, or for observance of the provisions stipulated in the
notifications/bye laws/Acts/Rules/regulations including amendments, if any, on
the part of the Contractor, the Engineer/employer shall have the right to deduct
any money due to the Contractor including his amount of performance security.
The Employer/Engineer shall also have the right to recover from the Contractor
any sum required or estimated to be required for making good the loss or damage
suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923 :- The Act provides for compensation in case of
injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the Act on
satisfaction of certain conditions on separation if an employee has completed 5 years
service or more on death, the rate of 15 days wages for every completed year of service.
The Act is applicable to all establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The benefits
payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other benefits to
women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for certain
welfare measures to be provided by the Contractor to contract labour and in case the
Contractor fails to provide, the same are required to be provided, by the Principal
Employer by Law. The principal Employer is required to take Certificate of Registration
and the Contractor is required to take license from the designated Officer. The Act is
applicable to the establishments or Contractor of Principal Employer, if they employ
or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if the
employment is a scheduled employment. Construction of Building, Roads, Runways are
scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to be
paid, when it will be paid and what deductions can be made from the wages of the
H) Equal remunerations Act 1979 :- The Act provides for payment of equal wages for
work of equal nature to Male and Female workers and for not making discrimination
against female employees in the matter of transfer, training and promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments employing
20 or more employees. The Act provides for payments of annual bonus subject to a
minimum of 8.33% of wages and maximum of 20 % of wages to employees drawing Rs.
3500/- per month or less. The bonus to be paid to employees getting Rs, 2500/- per
month or above Rs. 3500/- per month shall be worked out by taking wages as Rs.
2500/- per month only. The Act does not
apply to certain establishments. The newly set-up establishments are exempted for five
years in certain circumstances. Some of the State Governments have reduced the
employment size from 20 to 10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and procedure for
resolutions of Industrial disputes, in what situations a strike or lock-out becomes illegal
and what are the requirements for laying off or retrenching the employees or closing
down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by some of
the State and Central Government to 50). The Act provides for laying down rules
governing the conditions of employment by the Employer on matters provided in the
Act and get the same certified by the designated Authority.
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade unions of
workmen and employers. The Trade Unions registered under the Act have given certain
immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits employment
of children below 14 years of age in certain occupations and process and provides for
regulation of employment of children in all other occupations and processes.
Employment of Child labour is prohibited in Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of
service) Act 1979:- The Act is applicable to an establishment which employs 5 or more
inter-state migrant workmen through an intermediary (who has recruited workmen in
one state for employment in the establishment situated in another state).The inter-state
migrant workmen, is an establishment to which this Act becomes applicable, are
required to be provided certain facilities such as housing, medical aid, traveling
expenses from home upto the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of employment and
Conditions of Service) Act 1996 and the Cess Act of 1996:- All the establishments
who carry on any building or other constructions work and employ 10 or more workers
are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of the cost
of construction as may be modified by the government. The Employer of the
establishment is required to provide safety measures at the Building or construction
work and other welfare measures, such as canteens, First Aid facilities, Ambulance,
Housing accommodations for workers near the workplace etc. The Employer to whom
the Act applies has to obtain a registration certificate from the Registering Officers
appointed by the Government.
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans
before setting up a factory, health and safety provisions, welfare provisions,
working hours, annual earned leave and rendering information regarding
accidents or dangerous occurrences to designated authorities. It is applicable to
premises employing 10 persons or more with aid of power or 20 or more persons
without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from
time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management
plan for best energy use, waste management, the reduction of pollution as
in EMS (Environmental Management system)ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
65.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to The Municipal Commissioner
within 14 days of the notification of the Engineer's decision.
65.2 1. Deleted.
65.3 2. Deleted
If the dispute is not resolved through the conciliation process, contractor may
refer the dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If
the Contractor fails to refer a claim / dispute to the Higher Authority within
days of the notification of the Engineer's decision, the Contractor shall not be
entitled to any additional payment/claim if he doesn’t follow the above sequence
in stipulated time. However, during such period, he would not stop the work in
(૧૨) સરકારશ્રીના વખતો વખતના ઠરાવ ર્ુજબ ઈજારિારશ્રીએ ર્ેન પાવરને લઘુત્તર્ વેતન ચૂકવવાનુાં રહેશે. તેર્જ કાર્િારને દનયર્ોનુસાર ESI,
EPF બોનસ, ચૂકવવાનુાં રહેશે તથા તે અાંગેના આધાર પુરાવા રજૂ કરવાના રહેશે.
ગણવાર્ાાં આવશે. તેર્જ દડફે ક્ટ લાઇબીલીટી દપરીયડ િરદર્યાન Monthly Inspection Report અત્રેની કચેરીર્ાાં રજુ કરવાનો રહેશે નદહતો
(૨૦) પાટનરશીપ ફોર્મ દકસ્સાર્ાાં POA રજુ કરવાનો રહેશે.
કોટમ ના બિલે પહેલા The Gujarat Public Work Contracts Dispute Arbitration Tribunal Act, 1992. પ્રર્ાણે કાયમવાહી કરવાની રહેશે.
(૨૨) સિર ટે ન્ડરની રકર્ના ભાવ GST વગરના લેવાર્ાાં આવેલ છે . GST અલગથી ચૂકવવાર્ાાં આવશે. જે બાબત ધ્યાનર્ાાં લઈને ટે ન્ડરના ભાવ
પ્રદત બનાવ દિઠ (For Every Incident) ભરવાની રેહશે.
Sr. Required Documents List
No (Must be upload scanned copy the time of online tender submission)
1 Bid Document Fee / Tender Fee
2 Bid Security / EMD
3 Registration Certificate “C” class & Above
5 If have related work experience
7 Litigation History
8 Bank Certificate
Clause Reference With respect To section
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Gandhinagar Municipal Corporation (GMC), Gandhinagar
Address: Gandhinagar Municipal Corporation (GMC), The Deputy Municipal
Commissioner, Pandit Dindayal Upadhyay Bhavan, Behind Fire Station, Sector-
17, Gandhinagar-382117
Name of authorized Representative (will be intimated later)
2. The Engineer is The Deputy Municipal Commissioner, Gandhinagar
Municipal Corporation (GMC), Gandhinagar
Name of Authorized Representative: The Deputy Municipal Commissioner
3. The Defects Liability Period is 1 years from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Noticeto [CL.1.1]
proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&
06 Months after start of work with the following milestones: 2]
Milestone dates: [CL.2.2&
Physical works to be completed Period from the start date 49.1]
Milestone 1 i.e. 25% 45 days.
Milestone 2 i.e. 50% 90 days.
Milestone 3 i.e. 75 % 135 days.
Milestone 4 i.e. 100% 180 days.
6. The Site is located at NABHOI . Gandhinagar [CL.1.1]
7. The name and identification number of the Contract is:. CONSTRUCTION [CL.1.1]
OF NEW CLASS ROOMS IN NABHOI PRIMARY SCHOOLAT NABHOI VILLAGE OF
8. The works consist of Building Work with items as per B.O.Q. The [CL.1.1]
works shall, inter alia, include the following, as Specified or as directed:
Site clearance; setting – out and layout; widening of existing carriageway
and strengthening including camber corrections; construction of new
road/ Parallel service road; bituminous pavements
remodeling/construction of Junctions, intersections, bus bays, lay-bays;
supplying and placing of drainage Channels, flumes, guard posts and
guard other related items; construction/extension of
cross drainage works, bridge, approaches and other related stones;
protective works for roads/bridge; all aspects of quality assurance of
variouscomponents of the works; rectification of The defects in the
completed works during the Defects Liability Period; submission of “As-
built’’ drawings and any other related documents; and other item of work
as may be required to be carried out for completing the work in
accordance with the drawings and the provisions of the contract and
to ensure safety.
(C ) Other Items [CL.1.1]
Any Other Items as required to fulfill all contractual obligations as per the
10. The following documents also form part of the Contract [CL.2.3 (9)]
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death is Rs. 5 [CL.13]
lakhs per occurrence with the number of occurrences limited to four. After each
occurrence, the contractor will pay an additional premium necessary to make
insurance valid for four occurrences always.
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be from the issue of letter of work order [CL.21]
19. The period for submission of programme for approval of the engineer shall be [CL.27.1]
21 days from the issue of Letter of Acceptance.
20. The period between program updates will be 30 days. [CL.27.3]
21. The amount to be withheld for late submission of an updated programme Shall [CL.27.3]
be Rs. 0.10 lakhs per days
22. The following events shall also be Compensation Events Substantially adverse[CL.44]
ground conditions encountered during the course of execution of work not
provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring additional mobilization
by the contractor, e.g. ordinary soil to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps, etc. not caused by
the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures, monuments
interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or military
23. The currency of the Contract is Indian Rupees [CL.46]
24. The formula (e) for adjustment of prices are as under: • If any of the[CL.47]
commodities like Cement, Steel or Bitumen are not found applicable in a work,
the weight component of that commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or
‘Bitumen' (Pb) as indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm), such that the gross
% weight of the components shall remain as 100%.
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to labour shall be paid in accordance
with the following formula:
VL = Increase or decrease in the cost of work during the month under consideration due to changes in
rates for local labour
L0 = The consumer price index for industrial workers for the State on 28 days preceding the scheduled
date of opening of technical Bids as published by Labour Bureau, Ministry of Labour, Government of
Li = The consumer price index for industrial workers for the State for the month under consideration as
published by the Labour Bureau, Ministry of Labour, Government of India.
Pl = Percentage of labor component of the work.
Adjustment for cement component
(ii) Prices adjustment for increase or decrease in the cost of cement procured by the
contractor Vc= 0.85 x (Pc/100) x R x (Ci – C0)/C0
Vc = Increase or decrease in the cost of work during the month under consideration due to changes in
rates for cement.
C0 = The all-India wholesale price index for Ordinary Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry of Commerce & Industry.
Ci = The all-India average wholesale price index for Ordinary Portland Cement for the month under
consideration as published by Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by
the contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under consideration due to
changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products Rebars) on
28 days preceding the date of opening of Bids as published by the Office of the Economic
Adviser, Department for Promotion of Industry and Internal Trade, Ministry of Commerce
Si= The all India average wholesale price index for steel (Mild Steel - Long Products
Rebars) for the month under consideration as published by Office of the Economic
Adviser, Department for Promotion of Industry and Internal Trade, Ministry of Commerce
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long products Rebars
has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in accordance
with the following formula
Vb = Increase or decrease in the cost of work during the month under consideration due
to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest centre on the day
28 days prior to the scheduled date of opening of technical bid.
Bi = The official retail price of bitumen of IOC depot at the nearest centre for the 15th day
of the month under consideration.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and lubricant) shall be paid
in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under consideration due to
changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing consumer pumps
of IOC at the nearest centre on the day 28 prior to the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of IOC at the nearest
centre for the 15th day of the month of the under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has been
chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and Machinery spare
procured by the Contractor shall be paid in accordance with the following formula
Vp= Increase or decrease in the cost of work during the month under consideration due
to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of machinery for mining,
quarrying and Construction for the month under consideration as published Office
of the Economic Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer of machinery for
mining, quarrying and Construction for the month under consideration as
published Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts has been
chosen to represent the Plant and Machinery Spares group
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials other than
cement, steel, bitumen and POL procured by the contractor shall be paid in
accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under consideration
due to change in rates for local materials other than cement, steel, bitumen and
M0 = The All Indian wholesale price index (all commodities) on 28 days preceding
the scheduled date of opening of technical Bids, as published by the Office of
the Economic Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the month under
consideration as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Pm = Percentage of local material components (other than cement, steel,
bitumen and POL) of the work.
The following percentage will govern the price adjustment for the entire contract:
Labour -Pl 25.65%
Cement – Pc 30.88%
Steel - Ps 29.94%
Bitumen – Pb 0.00%
Other Materials – Pm 13.53%
24. The proportion of payments retained {CL. 48}
(retention money) shall be 6% from each
bill subject to a maximum of 5% of
contract price.
25. Amount of Liquidated damages for delay
in completion of works For Whole of work {CL.49}
(1/2000)th of the Initial contract price,
rounded off to the nearest Thousand, per
day. For sectional Completion (wherever
specified In item 6 of Contract data)
(1/2000)th of initial contract price for 5 km
Section, rounded off to the
thousand per day.
26. Maximum limit of liquidated damages For 10 percent of the Initial Contract {CL. 49}
delay in completion work Price rounded off to the nearest
27. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be
given as per CL.50 of Section-3
28. Maximum limit of bonus for early 5 percent of the Contract Price {CL. 50}
Completion of work
29. The amount of the advance payment are: {CL. 51 & 52}
Nature of Advances Amount (Rs.) Conditions to Be
i Mobilization Deleted
ii Equipment Deleted
iii Secured Deleted
Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after fulfillment
of the above conditions).
30. Repayment of advance payment for mobilization and equipment {CL. 51.3}
The advance loan shall be repaid with percentage deduction from the
interim payments certified by the Engineer under the Contract.
Deduction shall commence in the next Interim Payment Certificate
following that in which the total of all such payments to the Contractor
has reached not less than 20 percent of the Contract Price or
(six) months from the date of payment of first installment of
advance, whichever period concludes earlier, and shall be made at the
rate of 20 percent (collectively for both Mobilization Advance and
Equipment Advance) of the amounts of all Interim Payment
Certificate until such time as the loan has been repaid, always
provided that the loan
shall be completely repaid prior to the expiry of the original time for
completion pursuant to Clause 17 and
32. The securities shall be for the following minimum amounts equivalent {CL. 52}
As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs.……………..
(to be decided after evaluation of the bid) as additional security in
terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be an unconditional
Bank Guarantee of the type as presented in Section 8 of the Bidding Documents.
33. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
34. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58}
are required within 28 days of the issue of certificate of completion of
the whole or section of the work, as the case may be.
35. The amount to be withheld for failing to supply “as built” drawings by {CL. 58}
the Date required is Rs. 0.10 Lakhs per day.
36. The following events shall also be fundamentals breach of contract: “The {CL.59.2}
Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
37. The percentage to apply the value of the work not {Cl 60}
representing the Employer’s additional cost for completing the Works
shall be 20 per cent.
TECHNICAL SPECIFICATION
SEPARAT SHEETS ATTACHED
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein in
conformity with the conditions of Contract, specification, drawings, Bill of
Quantities and Addenda for the sum (s) of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is
reasonably possible after the receipt of the Engineer’s notice to commence, and to
complete the whole of the Works in the Contact within the time stated in the
3. We agree to abide by this Bid for the period of 120 Days from the date fixed for
receiving the same, and it shall remain binding upon it and may be accepted at any
time before the expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid, together
with your written acceptance thereof, shall constitute a binding contract between
5. We understand that you are not bound to accept the lowest or any tender you may
------- duly authorized to sign bids for and on behalf of ---------------------------------
(in block capitals or typed)
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis for bidding. The basis of payment will be the actual quantities of
work ordered and carried out, as measured by the Contractor and verified by the Engineer and
valued at the rates and prices tendered in the priced Bill of Quantities, where applicable, and
otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it is
otherwise provided under the Contract, include all constructional plant, layout, supervision,
materials, erection, maintenance, insurance, profit, taxes and duties, together with all general
risks, liabilities and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to enter a
rate or price shall be deemed to be covered by other rates and prices entered in the Bill of
Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost shall
be deemed to be distributed among the rates and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated or
summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the Bill of
8. The method of completed work of payment shall be in accordance with the specification
for Road and Bridge works. For building works specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting, or
the use of metal wedges and sledgehammers, or the use of compressed air drilling for its
removal, and which cannot be extracted by ripping with a tractor of at least 150 kw with a
single rear mounted heavy duty ripper.
BILL OF QUANTITIES (AS PER ATTACHED SCHEDULE-B)
(A) Percentage Rate Tender
Item Description of Item (with Quantity Unit Rate In Amount
No brief specification and figures
reference to book of
specifications)
I/We am/are willing to carry out the work at… .................. % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my
/ourtender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book
of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
2. All columns in the Schedule should be filled in ink and the total of the entire in the
last columns should be struck by the contractor under his signature.
3. Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
4. To be continued on additional sheets, if found necessary.
5. The Labour Cess will be deducted as per prevailing rules i.e.1% of the work done.
6. Credit Value of Dismantle Material Rs.0.00 will be recovered in 1st RA bill of Contractor.
7. The bituminous work shall be carried out by the contractor or as under by utilizing.
8. For abnormal high or law rates payment of such items shall be regulated as per
Govt. Circular letter No. Parach-102008-61-S dated 27-11-2008 attached with tender
10. The Contractor shall exhibit a board with detailed specification and details of work
as directed by the Engineer-In-Charge for which no extra payment shall be made.
11. GST and Income tax TDS will be deducted at a source while making payments of bills.
12. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Signature of Contractor
The Deputy Commissioner
Gandhinagar Municipal Corporation (GMC),
SECURITIES AND OTHER FORMS
BID SECURITY (BANK GUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter
called the “The Bidder”) has submitted his bid Dated ------------------------ (Date)
for the construction of ------------- (Name of Contractor hereinafter called “the Bid”)
KNOW ALL PEOPLE by these presents that We -----------------------------------------------
(name of Bank) of----------------------------------------------- (name of country) having our
registered office at -------------------------------------------------------( hereinafter
“the bank”) are bound unto --------------------------------------------(name of
(hereinafter called “The Employer”) in the sum of------------------------------------------ *
for which payment well and truly to be made to the said Employer the Bank itself, his
successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this ---------------------- day of -20
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid
validity specified in the Form of Bid;
(2) If the Bidder has been notified of the acceptance of
his bid by the Employer during the period of Bid
A Fails or refuses to execute the Form of Agreement in accordance with
the Instructions to Bidders, if required; or
B. Fails or refuse to furnish the Performance Security, in accordance with the
Instructions to Bidders; or
C. does not accept the correction of the Bid Price pursuant to Clause
(Correction of Errors)
We undertake to pay to the Employer up to the above amount upon
receipt of his first written demand, without the employer having to substantiate
his demand, provided that in his demand the Employer will note that the
amount claimed by him is due to him owing to the occurrence of one or any of
the three conditions, specifying the occurred conditions or conditions.
This Guarantee will remain in force up to and including the date ------------------ **
days after the deadline for submission of Bids as such the deadline is stated in the
Instructions to Bidders or as it may be extended by the Employer, notice of which
extension (s) to the Bank is hereby waived. Any demand in respect of this
guarantee should reach the Bank not later than the above date
(Signature, name and address)
* The Bidder should insert the amount of the guarantee in words and figures
denominated in Indian Rupees. This figure should be the same as shown in
Clause 16.1(Bid Security) of the Instructions to Bidders.
**45 days after the end of the validity period of the Bid. Date should be
inserted by the Employer before the Bidding documents are issued.
PERFORMANCE SECURITY
contractor) (hereafter called “the Contractor”) has undertaken, in pursuance of
--------- (name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the
sum specified therein as security for compliance with his obligation in accordance
with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to
you on behalf of the Contractor, up to a total of ----------------------------------
(amount of guarantee)* ----------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you, upon your first written demand and without cavil or
argument, any sum or sums within the limits of ---------------------------------------
- (amount of guarantee) as aforesaid without your needing to prove or to show
grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the
contractor before presenting is with the demand.
We further agree that no change or addition to or other modification of the terms of
the Contract to of the Works to be performed thereunder or of any of the Contract
documents which may be made between your and the Contractor shall in any way
release us from any liability under this guarantee, and we hereby waive notice of any
such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of the
Defect Liabilities period.
Signature and Seal of the guarantor ---------------------------
*An amount shall be inserted by the Guarantor, representing the percentage the
Contract price specified in the Contract denominated in Indian Rupees.
ADDITIONAL PERFORMANCE SECURITY
[Clause 34.1. (A)]
contractor) (hereafter called “The Contractor”) has undertaken, in pursuance of
- ------- (Name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the
sum specified therein as security for compliance with his obligation in accordance
with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to
you on behalf of the Contractor, up to a total of ----------------------------------
(amount of guarantee) ----------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you, upon your first written demand and without cavil or
argument, any sum or sums within the limits of ---------------------------------------
- (amount of guarantee) as aforesaid without your needing to prove or to show
grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the
contractor before presenting is with the demand
We further agree that no change or addition to or other modification of the terms of
the Contract to of the Works to be performed thereunder or of any of the Contract
documents which may be made between your and the Contractor shall in any way
release us from any liability under this guarantee, and we hereby waive notice of any
such charge, addition or modifications.
This guarantee shall be valid until 28 days from the project completion date.
Signature and Seal of the guarantor ---------------------------
BANK GUARANTEE FOR ADVANCE PAYMENT
In accordance with the provisions of the Conditions of Contract, sub-clause
51.1 (“Advance Payment”) of the above mentioned Contract, -------------------------------
address of Contractor) (hereinafter called ----------------- “the
Contractor”) shall deposit with--------------------------------------------------------- (name of
Employer) a bank guarantee his proper and faithful performance under the
said Clause of the Contract in an amount of --------------------- (amount of Guarantee)* -
We, the --------------------------------- (bank of financial institution), as instructed
by the Contractor, agree unconditionally and irrevocably to guarantee as primary
obligator and not as Surety merely, the payment to ------------------------------------
---- (name of Employer) on his first demand without whatsoever right of obligation
on our part and without his first claim to the Contractor, in the amount not exceeding
We further agree that no change or addition to or other modifications of the terms of
the Contractor or Works to be performed thereunder or of any of the Contract
documents which may be made between --------------------------------- (name
of Employer) and the Contractor, shall in any way release us from any liability under
this guarantee, and we hereby waive notice of any such change, addition or
modifications. This guarantee shall remain valid and in full effect from the date of the
advance payment under the Contract until ----------------------------- (name of employer)
receives full repayment of the same amount from the contractor.
Signature and Seal
Name of Bank/ Financial Institution
* An amount shall be inserted by that Bank or Financial Institution representing the
amount of the Advance Payment, and denominated in Indian Rupees.
Letter of Acceptance
(Letter head paper of the Employer)
(Name and address of the Contractor)
This is to notify you that your Bid dated for execution of
the (Name of the contract and identification number, as
given in the Instructions to Bidders) for the Contract Price of Rupees
( ) (amount in words and figures) as corrected and modified in
accordance with the Instructions to Bidders* is hereby accepted by our agency.
You are requested to furnish performance security, in the form detailed in para
34.1 of ITB for an amount equivalent to Rs. within 10 days of the receipt of this
letter of acceptance up to beyond 60 days from the date of expiry of defects Liability
period i.e. up to and the Additional Performance Security for an
amount equivalent to Rs. shall be valid beyond 28 (twenty-eight) days of
Project Completion Date i.e. up to and sign the contract, failing which
action as stated in Para 34.3 of ITB will be taken.
Yours Faithfully
Authorized Signature
Name and title of
Signatory Name of
* Delete “Corrected and” or and modified if only one of these actions applies. Delete as
corrected and modified in accordance with the Instructions to Bidders, if corrections or
modifications have not been affected.
Issue of Notice to proceed with the work
(Letterhead of the Employer)
(Name and address of the Contractor)
Pursuant to your furnishing the requisite security in ITB Clause
and signing of the Contract for the construction of
at a bid Price of Rs.
You are hereby instructed to proceed with the execution of the said works in
accordance with the contract documents.
Yours faithfully
(Signature, name and title of signatory authorized
To sign on behalf of Employer)
This agreement, made on the day of between
(name and address of Employer) (Hereinafter called “the
Employer) and (name and address of
contractor) hereinafter called “the Contractor” of the other
Whereas the Employer is desirous that the Contractor execute
Name and identification number of contract (hereinafter called “the works”) and the
employer has accepted the Bid by the Contractor for the execution and completion
of such works and the remedying of any defects therein, at a cost of Rs.
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS
1. In this Agreement, words and expression shall have the same meanings as are
respectively assigned to them in the conditions of contract hereinafter referred
to and they shall be deemed to form and be read construed as part of this
2. In Consideration of the payment to be made by the Employer to the contractor as
hereinafter mentioned, the Contractor hereby covenants with the Employer to
executive and complete the works and remedy any defects therein in conformity
in all aspects with the provisions of the contracts.
3. The employer hereby covenants to pay the Contractor in consideration of the
execution and completion of the works and the remedying the defects wherein
contract price or such other sum as may become payable under the provisions of
the Contract at the times and in the manner prescribed by the contract.
4. The Following documents shall be deemed to form and be ready and construed
as part of this Agreement viz
i) letter of Acceptance
ii ) Notice to proceed with the works:
iii ) Contractor’s Bid
iv ) Conditions of contract: General and Special
v) Contract Data
vi) Additional conditions
viii ) Bill of Quantities and
ix ) Any other documents listed in the
data as forming part of the Contract.
In witness whereof the parties there to have caused this Agreement to be
executed the day and year first before written
The Common seal of
Was hereunto affixed in the presence of :
Signed, sealed and Delivered by the said
In the presence of
Binding signature of Employer
Binding Signature of Contractor
(For Investment)
I, the undersigned do hereby undertake that our firm M/s
…………………………………………………..……………………………….. would invest a minimum cash up
to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
I, the undersigned do hereby undertake that our firm M/s ……………………………………
……………..……………………………….. agree to abide by this bid for a period .................................. days
for date fixed for receiving the same and it shall be binding on us and may be
accepted at any time before the expiration of that period.
(Signed by an Authorized officer of the firm)
Title of officer
Note: If the bidder is black listed in any organization/ authority they should fill the table as below
compulsory otherwise bidder has to fill ANTI-BLACKLISTING UNDERTAKING during the bidding of the
ANTI-BLACKLISTING UNDERTAKING WITH LITIGATION HISTORY
(On Company’s Letter Head with Sign and Stamp)
1/We M/s. Bidder).........………………………………………………….(Name of the
bidder)……………………………………………………(addresses of the register) hereby certify and confirm that we or any of
our Promoter/s/Director/s/Partner/s are neither barred by Government of Gujarat (GoG) / any other entity of
GoG nor blacklisted by any state government or central Government/Department/Local Government/ Agency in
India or from Abroad from participating in Project/s, either individually or as member of a Consortium in last five
years and 1/We declare this as on ...............(Bid submission date). In addition to this I/We also confirm that we or
nay of our Promoter/s / Director/s/ Partner/s are not declared default by any Bank or NBFC in last five years.
We further confirm that we are aware that our Application for the…………………………………………… (Project Name)
would be liable for rejection in case any material misrepresentation is made or discovered with regard to the
requirements of this Tender at any stage of the Bidding Process or thereafter during the agreement period.
History of Blacklisting
Provide details as under :
SR No. Name of Govt./ Name of Work Cause of Black Listing Explanation
Semi Govt. / Blacklisting order with
Municipalities/ date
Please attach the order
1.4 Information on Litigation history in which the Bidder is involved in last five years.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
QUALIFICATION CRITERIA
Financial & Experience Criteria:
Tender fee : DD Rs. 4248/- favor of Deputy Municipal Commissioner Gandhinagar municipal
corporation Gandhinagar
EMD : FDR or BG Rs. 1,18,350.00/- with the validity period of not less than 3 months of any
Registration : The contractor shall have a registration with State / Central Government or State
Class Water Supply Boards or in Municipal Corporation in ‘C’ Class Civil Supporting documents
to be submitted in hard copy. and
GST : Attached scan copy
PAN : Attached scan copy
Annual : The bidder shall have the financial capability and having Any one annual turnover in
Turnover last five financial years, ending 31st March of the previous financial year (i.e.
Bank : The applicant should give undertaking that he has access to, or has available, liquid
Certificate assests (aggregate of working capital, cash in hand and uncommitted bank gurantees)
and credit facilities upto 25 percent of the value of the contract / contracts appilied
(Rs. 29.58 lacs) as per Annexure
Similar : The bidder must have completed similar nature of work i.e., Construction Any type of
Nature Building work within last Five financial years and up to one month prior to last date of
submission of the bid of value not less than in One Contract 40% of estimated
cost+gst (Rs.47,33,504/ + Rs. 8,52,031/- = Rs.55,85,535 /-) estimated cost in Gov.
/ semi Gov. / ULB with in last five years.
Bid : The bidder must have Available Bid Capacity (ABC) more than the amount put to
Capacity tender (will be calculated as under) Assessed Available Bid Capacity (ABC)= 2 x A x N-B
Should be 4.28 Lacs
Litigation : Litigation history submitted on company letter head
Affidavit : Bidder must have to submit affidavit otherwise bidder shall be technivally disqualified
and his bid shall be outright rejected.
REQUIRED DOCUMENT LIST (MUST BE UPLOAD SCANNED COPY AT THE TIME OF ONLINE TENDER SUBMISSION TENDER SUBMISSION)
Bid Document Fee / Tender Fee
Bid Security / EMD
Registration Certificate “C” class & Above
work experience, as required..
Litigation History
Bank Certificate
DOCUMENTS TO BE FURNISHED BY BIDDER
List of Mandatory Documents
Bid Document Fee / Tender Fee
Bid Security / EMD
Registration Certificate “C” class & Above
work experience, as required..
Litigation History
Bank Certificate
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD NABHOI SCHOOL.pdf
4.Building-Specification Booklet.pdf
3.make list civil ele.pdf
2.SCHEDULE-B .pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .