Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
30 Sept 2020, 4:00 pmClosed
Executive Engineer, Electric Division Vijaypur
OFFICE OF EXECUTIVE ENGINEER ELECTRIC DIVISION VIJAYPUR JPDCL
RATE CONTRACT FOR REPAIR OF DAMAGED DISTRIBUTION TRANSFORMERS (11/0.433KV) OF DIFFERENT CAPACITIES VIZ. (25KVA- 630KVA) AT ELECTRIC WORKSHOP OF ELECTRIC DIVISION VIJAYPUR (SAMBA)
2020_PDD_103562_1
EDV/03 OF 2020-2021 dated 4-9-2020
Open Tender
Electrical Works
Item Wise
365 days
ELECTRIC WORKSHOP OF ELECTRIC DIVISION VIJAYPUR (S
as per SBD
5 documents required · 5 mandatory
₹1,000
Executive Engineer, Electric Division Vijaypur,
₹25,000
2 Nov 2020
4 Sept 2020
5 Oct 2020
4 Sept 2020
30 Sept 2020
4 Sept 2020
25 KVA Distribution transformers (Al/copper wound)
Unloading of damaged Distribution Transformer at workshop
Dragging of damagedvDistribution Transformer to repairing site
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Taking out of H.V and L.V coils, Core laminations
L.V Coills
H.V Coils
Labour charges for cleaning and washing of transformer tank, radiator, top cover etc. (inner and outer side).Complete job
Labour charges for repairing, welding of transformer tank, radiator, arresting of oil leakage, if any (inner and outer side).Complete job
Labour charges for painting of transformer tank, radiator, top cover etc. (inner and outer side) Complete job
Winding of new HV coils (Cu)
Winding of new HV coils (Al)
Rewinding of old HV coils (Cu)
Rewinding of old HV coils (Al)
Winding of new LV coils (Cu)
Winding of new LV coils (Al)
Reconditioning of LV Coils…(Cu)
Reconditioning of LV Coils…(Al)
Heat treatment of repaired Transformer
Filteration of Transformer oil including topping up
Refitting of repaired Transformer, including sundry items(bush, bush rod, bushing, gasket, cover bolt etc.) parts to be replaced
Dragging of repaired Distribution Transformer from repairing site to the Testing site, and testing thereof.
Dragging of repaired Distribution Transformer from testing to loading/stacking site
Loading of repaired Distribution Transformer
Labour Charges for Stacking of repaired/Damaged Distribution Transformers
Labour Charges for weighing, stacking and loading of Cu/Al Scrap etc
Description of Work / Item(s)
50/63 KVA Distribution transformers (Al/copper wound)
Unloading of damaged Distribution Transformer at workshop
Dragging of damagedvDistribution Transformer to repairing site
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Taking out of H.V and L.V coils, Core laminations
L.V Coills
H.V Coils
Labour charges for cleaning and washing of transformer tank, radiator, top cover etc. (inner and outer side).Complete job
Labour charges for repairing, welding of transformer tank, radiator, arresting of oil leakage, if any (inner and outer side).Complete job
Labour charges for painting of transformer tank, radiator, top cover etc. (inner and outer side) Complete job
Winding of new HV coils (Cu)
Winding of new HV coils (Al)
Rewinding of old HV coils (Cu)
Rewinding of old HV coils (Al)
Winding of new LV coils (Cu)
Winding of new LV coils (Al)
Reconditioning of LV Coils…(Cu)
Reconditioning of LV Coils…(Al)
Heat treatment of repaired Transformer
Filteration of Transformer oil including topping up
Refitting of repaired Transformer, including sundry items(bush, bush rod, bushing, gasket, cover bolt etc.) parts to be replaced
Dragging of repaired Distribution Transformer from repairing site to the Testing site, and testing thereof.
Dragging of repaired Distribution Transformer from testing to loading/stacking site
Loading of repaired Distribution Transformer
Labour Charges for Stacking of repaired/Damaged Distribution Transformers
Labour Charges for weighing, stacking and loading of Cu/Al Scrap etc
Description of Work / Item(s)
100/160 KVA Distribution transformers (Al/copper wound)
Unloading of damaged Distribution Transformer at workshop
Dragging of damagedvDistribution Transformer to repairing site
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Taking out of H.V and L.V coils, Core laminations
L.V Coills
H.V Coils
Labour charges for cleaning and washing of transformer tank, radiator, top cover etc. (inner and outer side).Complete job
Labour charges for repairing, welding of transformer tank, radiator, arresting of oil leakage, if any (inner and outer side).Complete job
Labour charges for painting of transformer tank, radiator, top cover etc. (inner and outer side) Complete job
Winding of new HV coils (Cu)
Winding of new HV coils (Al)
Rewinding of old HV coils (Cu)
Rewinding of old HV coils (Al)
Winding of new LV coils (Cu)
Winding of new LV coils (Al)
Reconditioning of LV Coils…(Cu)
Reconditioning of LV Coils…(Al)
Heat treatment of repaired Transformer
Filteration of Transformer oil including topping up
Refitting of repaired Transformer, including sundry items(bush, bush rod, bushing, gasket, cover bolt etc.) parts to be replaced
Dragging of repaired Distribution Transformer from repairing site to the Testing site, and testing thereof.
Dragging of repaired Distribution Transformer from testing to loading/stacking site
Loading of repaired Distribution Transformer
Labour Charges for Stacking of repaired/Damaged Distribution Transformers
Labour Charges for weighing, stacking and loading of Cu/Al Scrap etc
Description of Work / Item(s)
200/ 250 KVA Distribution transformers (Al/copper wound)
Unloading of damaged Distribution Transformer at workshop
Dragging of damagedvDistribution Transformer to repairing site
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Taking out of H.V and L.V coils, Core laminations
L.V Coills
H.V Coils
Labour charges for cleaning and washing of transformer tank, radiator, top cover etc. (inner and outer side).Complete job
Labour charges for repairing, welding of transformer tank, radiator, arresting of oil leakage, if any (inner and outer side).Complete job
Labour charges for painting of transformer tank, radiator, top cover etc. (inner and outer side) Complete job
Winding of new HV coils (Cu)
Winding of new HV coils (Al)
Rewinding of old HV coils (Cu)
Rewinding of old HV coils (Al)
Winding of new LV coils (Cu)
Winding of new LV coils (Al)
Reconditioning of LV Coils…(Cu)
Reconditioning of LV Coils…(Al)
Heat treatment of repaired Transformer
Filteration of Transformer oil including topping up
Refitting of repaired Transformer, including sundry items(bush, bush rod, bushing, gasket, cover bolt etc.) parts to be replaced
Dragging of repaired Distribution Transformer from repairing site to the Testing site, and testing thereof.
Dragging of repaired Distribution Transformer from testing to loading/stacking site
Loading of repaired Distribution Transformer
Labour Charges for Stacking of repaired/Damaged Distribution Transformers
Labour Charges for weighing, stacking and loading of Cu/Al Scrap etc
Description of Work / Item(s)
300/400 KVA Distribution transformers (Al/copper wound)
Unloading of damaged Distribution Transformer at workshop
Dragging of damagedvDistribution Transformer to repairing site
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Taking out of H.V and L.V coils, Core laminations
L.V Coills
H.V Coils
Labour charges for cleaning and washing of transformer tank, radiator, top cover etc. (inner and outer side).Complete job
Labour charges for repairing, welding of transformer tank, radiator, arresting of oil leakage, if any (inner and outer side).Complete job
Labour charges for painting of transformer tank, radiator, top cover etc. (inner and outer side) Complete job
Winding of new HV coils (Cu)
Winding of new HV coils (Al)
Rewinding of old HV coils (Cu)
Rewinding of old HV coils (Al)
Winding of new LV coils (Cu)
Winding of new LV coils (Al)
Reconditioning of LV Coils…(Cu)
Reconditioning of LV Coils…(Al)
Heat treatment of repaired Transformer
Filteration of Transformer oil including topping up
Refitting of repaired Transformer, including sundry items(bush, bush rod, bushing, gasket, cover bolt etc.) parts to be replaced
Dragging of repaired Distribution Transformer from repairing site to the Testing site, and testing thereof.
Dragging of repaired Distribution Transformer from testing to loading/stacking site
Loading of repaired Distribution Transformer
Labour Charges for Stacking of repaired/Damaged Distribution Transformers
Labour Charges for weighing, stacking and loading of Cu/Al Scrap etc
Description of Work / Item(s)
500/630 KVA Distribution transformers (Al/copper wound)
Unloading of damaged Distribution Transformer at workshop
Dragging of damagedvDistribution Transformer to repairing site
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Taking out of H.V and L.V coils, Core laminations
L.V Coills
H.V Coils
Labour charges for cleaning and washing of transformer tank, radiator, top cover etc. (inner and outer side).Complete job
Labour charges for repairing, welding of transformer tank, radiator, arresting of oil leakage, if any (inner and outer side).Complete job
Labour charges for painting of transformer tank, radiator, top cover etc. (inner and outer side) Complete job
Winding of new HV coils (Cu)
Winding of new HV coils (Al)
Rewinding of old HV coils (Cu)
Rewinding of old HV coils (Al)
Winding of new LV coils (Cu)
Winding of new LV coils (Al)
Reconditioning of LV Coils…(Cu)
Reconditioning of LV Coils…(Al)
Heat treatment of repaired Transformer
Filteration of Transformer oil including topping up
Refitting of repaired Transformer, including sundry items(bush, bush rod, bushing, gasket, cover bolt etc.) parts to be replaced
Dragging of repaired Distribution Transformer from repairing site to the Testing site, and testing thereof.
Dragging of repaired Distribution Transformer from testing to loading/stacking site
Loading of repaired Distribution Transformer
Labour Charges for Stacking of repaired/Damaged Distribution Transformers
Labour Charges for weighing, stacking and loading of Cu/Al Scrap etc
Description of Work / Item(s)
ABSTRACT
REPAIR/RECLAMATION OF DAMAGED 25 kVA DISTRIBUTION TRANSFORMER
REPAIR/ RECLAMATION OF DAMAGED 50/63 kVA DISTRIBUTION TRANSFORMER
REPAIR/ RECLAMATION OF DAMAGED 100/160 kVA DISTRIBUTION TRANSFORMER
REPAIR/ RECLAMATION OF DAMAGED 200/250 kVA DISTRIBUTION TRANSFORMER
REPAIR/ RECLAMATION OF DAMAGED 300/400 kVA DISTRIBUTION TRANSFORMER
REPAIR/ RECLAMATION OF DAMAGED 500/630 kVA DISTRIBUTION TRANSFORMER
MAHA SHAKTI ELECTRICAL WORKS
MAHA SHAKTI ELECTRICAL WORKS
MAHA SHAKTI ELECTRICAL WORKS
MAHA SHAKTI ELECTRICAL WORKS
M/S SUPER STAR ENGINEERS AND CONTRACTORS
M/S SUPER STAR ENGINEERS AND CONTRACTORS
M/S SUPER STAR ENGINEERS AND CONTRACTORS
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
Opening of damaged Distribution Transformer, draining of oil, disconnection of H.V& L.V connections, Yoke plate and assessment of damages
REPAIR/RECLAMATION OF DAMAGED 25 kVA DISTRIBUTION TRANSFORMER
Unloading of damaged Distribution Transformer at workshop
Unloading of damaged Distribution Transformer at workshop
Unloading of damaged Distribution Transformer at workshop
Unloading of damaged Distribution Transformer at workshop
Unloading of damaged Distribution Transformer at workshop
REPAIR/ RECLAMATION OF DAMAGED 300/400 kVA DISTRIBUTION TRANSFORMER
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .