| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance ANANDIPURAM KUSUMKHERA HALDWANI | NAINITAL | UTTARAKHAND | 244713 | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 CrAdmitted-Finance | ₹3.4 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical bidder disqualify |
| 4 | Rejected-Technical | - | - | Rejected-Technical bidder disqualify |
| 5 | Rejected-Technical | - | - | Rejected-Technical bidder disqualify |
| Sl No | Description | Qty | Unit | Neeraj Mishra L1 | Yogesh Singh Mehta L2 |
|---|---|---|---|---|---|
| .01Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. | |||||
| 1.00 | Excavation in hilly area for construction of road in all type of soils & rocks with E&B and BLB as met at site true to as per plan, X-section, L-section camber, super elevation as required also including cutting & cutting of bushess dressing lifts and safe disposal of surplus excavated material at suitable dumping placws by mechanical means/manual means including in the taking with out damaging forest and forest land including slip clearance during hill side cutting as directed by Engineer-in-charge. | 1 | Job. | 67,00,000 ₹67,00,000 Lowest | 67,20,000 ₹67,20,000 |
| 2.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 1,331.25 | Cum | 380 ₹5,05,875 Lowest | 381 ₹5,07,206.25 |
| 3.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 87.5 | Cum | 3,800 ₹3,32,500 Lowest | 3,810 ₹3,33,375 |
| 4.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 2,481.31 | Cum | 2,200 ₹54,58,882 Lowest | 2,210 ₹54,83,695.1 |
| 5.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 1,010.88 | Cum | 1,020 ₹10,31,097.6 Lowest | 1,025 ₹10,36,152 |
| 6.00FOR 1 M SPAN CULVERT | |||||
| 6.01 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 4,064.02 | Cum | 380 ₹15,44,327.6 Lowest | 381 ₹15,48,391.62 |
| 6.02 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 898.87 | Cum | 3,800 ₹34,15,706 Lowest | 3,810 ₹34,24,694.7 |
| 6.03 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 939.64 | Cum | 2,200 ₹20,67,208 Lowest | 2,210 ₹20,76,604.4 |
Tender Value
Refer Docs
EMD Value
₹8.4 L
Closing Date
13 May 2026, 1:00 pmClosed
Superintending Engineer
Superintending Engineer 1st Circle PWD Almora
Construction of Jawarnaidi to Bakswar Motor Road under State Sector Constituency Jageshwar of Distt Almora
2026_pwd_93968_1
1121/Nivida-01/2025-26 dated 02/04/2026
Open Tender
Civil Works
Item Rate
365 days
Jageshwar
As per technical bid
2 documents required · 2 mandatory
₹5,900
EE PD PWD Almora
₹8.4 L
Almora
7 Aug 2026
7 Apr 2026
13 May 2026
7 Apr 2026
13 May 2026
15 Apr 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in hilly area for construction of road in all type of soils & rocks with E&B and BLB as met at site true to as per plan, X-section, L-section camber, super elevation as required also including cutting & cutting of bushess dressing lifts and safe disposal of surplus excavated material at suitable dumping placws by mechanical means/manual means including in the taking with out damaging forest and forest land including slip clearance during hill side cutting as directed by Engineer-in-charge. | - | Job. | - | - |
| - | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | - | Cum | - | - |
| - | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | - | Cum | - | - |
| - | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | - | Cum | - | - |
| - | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | - | Cum | - | - |
| - | FOR 1 M SPAN CULVERT | - | - | - | - |
| 6.01 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | - | Cum | - | - |
| 6.02 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | - | Cum | - | - |
| 6.03 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | - | Cum | - | - |
| 6.04 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (Nominal mix (1:3:6) | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.21 MB
JawarnaidiBakswar.pdf
Tender Documents • 19.32 MB
BOQ_111211.xls
BOQ • 0.28 MB
1527bakswar.pdf
PDF • 0.37 MB
1420jawarnaidi.pdf
PDF • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].