Loading…
Loading…
Tender Value
₹36,050
Closing Date
3 Aug 2026, 6:55 pm
Executive Engineer MHD Baramulla
Executive Engineer Mechanical and Hospital Division Baramulla
Routine / Corrective Maintenance to DRR No. 115 W/S pertaining to Mechanical and Hospitals Sub Division 1st Baramulla
2026_PWDJK_317450_1
MHDB/TS/2026-27/39
Open Tender
Repair and Maintenance Works
Percentage
10 days
M and H Sub-Division 1st Baramulla
Please refer Tender documents.
9 documents required · 9 mandatory
₹200
Accounts Officer, M and HED Kashmir
23 Jul 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to differential housing assembly by way of dismantling and removing the damaged housing using a suitable hoist mechanism to ensure damageless removal ,shifting the same to a local workshop for repairs, grinding and preparing the damaged surfaces, carrying out cast iron welding of damaged/cracked portions followed by machining and finishing to restore original dimensions, refitting the repaired differential housing with proper alignment, replenishing lubricant wherever required and conducting operational testing to ensure satisfactory performance, complete in all respects. | - | Job | - | - |
| 2 | Repairs to Lubrication oil sump by way of detaching the lubrication oil sump assembly which involves draining of M oil, cleaning of Bottom Surface of Lubrication sump and surface, prepration of Aluminium welding at two spots and removing of extra burrs produced due to welding and grinding at damaged places and checking for leakage after success | - | Job | - | - |
| 3 | Repairing tail piece assembly by removing worn-out ends, fabrication and welding of new end pieces, providing and fitting fasteners, alignment of transmission components and ensuring smooth operation, complete in all respects. | - | Job | - | - |
| 4 | Repairs to steering worm wheel by way of remetaling , turning and finishing it to required size , repairs to key washer for proper fitment of worm wheel and fabrication of lock bolt for steering pinion. | - | Job | - | - |
| 5 | Providing and replacing Engine Oil by draining out the old/stale engine oil and filling 18 litres of fresh Engine Oil (20W40) of approved make, including supply and fitting of Engine Oil Filter, cleaning of filter housing, checking for oil leakage and testing of the engine after completion, complete in all respects as directed by the Engineer-in-charge. | - | Job | - | - |
| 6 | Providing and replacing Gear Oil by draining out the old/stale gear oil and filling 16 litres of fresh Gear Oil (EP90 API GL-4) approved make, complete in all respects. | - | Job | - | - |
| 7 | Providing and fitting of complete Diesel Filter Set, including removal of old filter, cleaning of filter housing, complete in all respects. | - | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
NIT39.pdf
Tender Documents • 0.59 MB
BOQ_1040366.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].