DGM(MILL)
DGM(MILL), UCIL, TUMMALAPALLE
Construction of Sump pits at Tummalapalle plant area
2023_UCIL_178227_1
TMPL/CIVIL/MILL/017
Open Tender
Civil Works
Works
90 days
UCIL, TUMMALAPALLE
Refer tender document
2 documents required · 2 mandatory
₹0
₹5,000
Yes
18 Jan 2024
16 Dec 2023
6 Jan 2024
16 Dec 2023
5 Jan 2024
16 Dec 2023
Construction of Sump pits at Tummalapalle plant area.
Earth work in excavation by mechanical means / manual means in foundation trenches or drains, including dressing of sides and ramming of bottoms, all lead and lifts, including getting out the excavated soil and disposal of surplus excavated soil as directed, all kinds of soil.Including cost of Labor, Tools & tackles, Taxes, etc., complete as per direction of Engineer-in-charge.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - in 1:3:6 (1 Cement : 3 coarse sand: 6 graded stone aggregate 20 mm nominal size, - At all lead and liftlevel: Including cost of Labor, Tools & tackles, Taxes, Royalty Charges etc., complete as per latest edition of IS code specifications and as per direction of Engineer-in-charge
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand), In below and above Plinth,up to all lead and lift, Including cost of all Materials, Labor, Tools & tackles, Taxes, Royalty Charges etc., complete as per latest edition of IS code specifications and direction of Engineer-in-charge.
CEMENT PLASTER WITH A FLOATING COAT OF NEAT CEMENT, 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand),up to all lead and lift, Including cost of all Materials, Labor, Tools & tackles, Taxes, Royalty Charges etc., complete as per latest edition of IS code specifications and direction of Engineer-in-charge.
CEMENT PLASTER IN TWO COATS 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 (1 cement : 6 fine sand)., up to all lead and lift, Including cost of all Materials, Labor, Tools & tackles, Taxes, Royalty Charges etc., complete as per latest edition of IS code specifications and direction of Engineer-in-charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more Including cost of all Materials, Labor, Tools & tackles, Taxes, complete as per latest edition of IS code specifications and direction of Engineer-in-charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc., consolidating each deposited layer by ramming and watering, at all leads and lifts as per specifications and drawings., Including cost of Labor, Tools & tackles, Taxes, etc., complete as per direction of Engineer-in-charge.
Providing and mixing water proofing material in proportion recommended by the manufacturers, Including cost of Labor, Tools & tackles, Taxes, etc., complete as per direction of Engineer-in-charge. (Note: Per bag of 50kg cement used in the mix )
POCHIREDDY POCHIREDDY
NAGGARI VARA PRASAD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .