| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹42.5 LAccepted-AOC 247 DHAMPURA LAKSAR ROAD DISTT HARIDWAR 249408 UTTARAKHAND | HARIDWAR | HARIDWAR | UTTARAKHAND | 249408 | ₹42.5 L | L-1 | Accepted-AOC Lowest Bid |
| 2 | L-2₹45.6 L+₹3.1 L (7.40%)Rejected-Finance | ₹45.6 L+₹3.1 L (7.40%) | L-2 | Rejected-Finance Higher bid |
| 3 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Others-Not meet FQR |
| Sl No | Description | Qty | Unit | M/s VEERPAL SINGH CONTRACTOR L2 | MAHAVEER TECHNO ENGINEERS L1 |
|---|---|---|---|---|---|
| 1.00220kV Substation, Piran Kaliyar | |||||
| 2.00 | Preventive maintenance of all Substation equipments, i.e. Power Transformers, Station Transformer, 220KV, 132KV & 33KV Bays (includes CT, PT, Isolator, LA, CB etc.) and lighting arrangement of switchyard by a team comprising the following technical personnels round the clock .
(a) Technician/fitter - 02 No.
(b) Skilled collie and line man - 02 No.
The maintenance work of the Substation shall be carried out on equipments as per technical specification and details enclosed. | 12 | Month | 1,50,000 ₹18,00,000 | 1,36,500 ₹16,38,000 Lowest |
| 3.00 | Upkeeping of control room building comprises of Control room, Battery room, ACDB room, committee room, EE office, AE office & JE office by providing one (01 no.) of housekeeper which includes the work of proper cleaning/dusting of control panels, doors, windows, tables, chairs and general maintenance of Batteries, ACDB's, DCDB's, lighting arrengement etc. | 12 | Month | 15,000 ₹1,80,000 | 12,000 ₹1,44,000 Lowest |
| 4.00220kV Lines | |||||
| 5.00Work of Patrolling of the following lines as per technical specification enclosed: | |||||
| 6.00 | 220 kV Piran Kaliyar-Sidcul Line (6 x 19 = 114 km). | 114 | Km | 650 ₹74,100 Lowest | 1,000 ₹1,14,000 |
| 7.00 | 220 kV Piran Kaliyar-Puhana Line Ckt-I (6 x 20= 120 km). | 120 | Km | 650 ₹78,000 Lowest | 1,000 ₹1,20,000 |
| 8.00 | 220 kV D/C Piran Kaliyar-Puhana Line Ckt-II & III (6 x 6.5 = 38 km). | 38 | Km | 650 ₹24,700 Lowest | 1,000 ₹38,000 |
| 9.00Work of lopping-chopping of trees under and near the line gallary as per technical specification enclosed: | |||||
| 10.00 | 220 kV Piran Kaliyar-Sidcul Line (4 x 19 = 72 km). | 72 | Km | 1,450 ₹1,04,400 Lowest | 1,500 ₹1,08,000 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
17 Jan 2026, 3:00 pmClosed
Chief Engineer O and M Garhwal Zone Roorkee
Chief Engineer O and M Garhwal Zone PTCUL 26 Civil lines Roorkee
Annual Preventive Maintenance of substations and associated lines under 220KV OandM Division, Piran Kaliyar
2025_PTCUX_90224_1
CE/GZR-39/2025-26
Open Tender
Electrical Works
Item Wise
365 days
Roorkee
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
SE Oand M Transmission Circle Roorkee
₹1.4 L
19 Sept 2026
22 Dec 2025
19 Jan 2026
22 Dec 2025
17 Jan 2026
22 Dec 2025
220kV Substation, Piran Kaliyar
Preventive maintenance of all Substation equipments, i.e. Power Transformers, Station Transformer, 220KV, 132KV & 33KV Bays (includes CT, PT, Isolator, LA, CB etc.) and lighting arrangement of switchyard by a team comprising the following technical personnels round the clock . (a) Technician/fitter - 02 No. (b) Skilled collie and line man - 02 No. The maintenance work of the Substation shall be carried out on equipments as per technical specification and details enclosed.
Upkeeping of control room building comprises of Control room, Battery room, ACDB room, committee room, EE office, AE office & JE office by providing one (01 no.) of housekeeper which includes the work of proper cleaning/dusting of control panels, doors, windows, tables, chairs and general maintenance of Batteries, ACDB's, DCDB's, lighting arrengement etc.
220kV Lines
Work of Patrolling of the following lines as per technical specification enclosed:
220 kV Piran Kaliyar-Sidcul Line (6 x 19 = 114 km).
220 kV Piran Kaliyar-Puhana Line Ckt-I (6 x 20= 120 km).
220 kV D/C Piran Kaliyar-Puhana Line Ckt-II & III (6 x 6.5 = 38 km).
Work of lopping-chopping of trees under and near the line gallary as per technical specification enclosed:
220 kV Piran Kaliyar-Sidcul Line (4 x 19 = 72 km).
220 kV Piran Kaliyar-Puhana Line Ckt-I (4 x 20= 80 km).
220 kV D/C Piran Kaliyar-Puhana Line Ckt-II & III (4 x 6.5 = 26 km).
Work of Thermoscanning of the 220kV lines which includes thermoscanning of all tension towers, jumpers, clamps, connectors etc. of the following 220kV lines:
220 kV Piran Kaliyar-Sidcul Line (4 x 19 = 72 km).
220 kV Piran Kaliyar-Puhana Line Ckt-I (4 x 20= 80 km).
220 kV D/C Piran Kaliyar-Puhana Line Ckt-II & III (4 x 6.5 = 26 km).
Work of repalcement/jointing of broken/damaged jumper of above mentioned line and proper tightening. Work should be complete in all aspects.
Work of jointing/attending the broken/damaged earth wire with span joint and stringing work of 220KV lines. Work should be complete in all aspects.
Work of cleaning of the disc insulators of 220KV lines with cleaning agent and removing the birds dropping etc.
Replacement work of damaged discs of suspension towers of 220KV lines which includes the work of dehoisting of the suspension string, replacement of defective insulator and refixing of string. Work should be complete in all aspects.
Replacement work of damaged disc of tension towers of 220KV lines which includes the work of dehoisting of tension string, replacement of defective insulators and refixing of string. Work should be complete in all aspects.
Work of removing the bushes, small trees etc near tower legs, checking of tower leg earthings and attending the same if found broken and removing the extra soil from the coping of tower foundations.
132kV Substation, Bhagwanpur
Preventive maintenance of complete Substation equipments, i.e. complete electrical equipments, Bays, Lighting arrangement etc. round the clock by a team comprising the following technical personal. (a) Technician/fitter - 01 No. (b) Skilled collie and line man - 01 No. The maintenance work of the Substation shall be carried out on equipments as per technical specification and details enclosed.
Upkeeping of control room building comprises of Control room, Battery room, ACDB room, committee room AE/JE offices by providing one (01 no.) of housekeeper which includes the work of proper cleaning/dusting of control panels, doors, windows, tables, chairs and general maintenance of Batteries, ACDB's, DCDB's, lighting arrengement etc.
132kV Lines
Work of Patrolling of the following lines as per technical specification and detail enclosed.
132 kV Roorkee-LSM Line on (6times x 8 = 48km).
132 kV LSM-Bhagwanpur Line on (6times x 17 = 102 km).
132 kV Piran Kaliyar-Bhagwanpur Line (6times x 10 = 60 km).
132 kV Piran Kaliyar-Chudiyala Line (6times x 16 = 96 km).
Work of lopping - chopping of the trees under and near the line gallary for following lines as per technical specification and detail enclosed:
132 kV Roorkee-LSM Line on (2times x 8 = 16 km).
132 kV LSM-Bhagwanpur Line on (2times x 17 = 34 km).
132 kV Piran Kaliyar-Bhagwanpur Line (2times x 10 = 20 km).
132 kV Piran Kaliyar-Chudiyala Line (2times x 16 = 32 km).
Work of Thermoscanning of the 132kV lines which includes thermoscanning of all tension towers, jumpers, clamps, connectors etc. of the following 132kV lines:
132 kV Roorkee-LSM Line (4times x 8 = 32 km).
132 kV LSM-Bhagwanpur Line (4times x 17.5 = 70 km).
132 kV Piran Kaliyar-Bhagwanpur Line (4times x 10.0 = 40.00 km).
132 kV Piran Kaliyar-Chudiyala Line (4times x 16.00 = 64.00 km).
Work of repalcement/jointing of broken/damaged jumper of above mentioned line and proper tightening. Work should be complete in all aspects.
Work of jointing/attending the broken/damaged earth wire with span joint and stringing work of 132KV lines. Work should be complete in all aspects.
Work of cleaning of the disc insulators of 132KV lines with cleaning agent and removing the birds dropping etc.
Replacement work of damaged discs of suspension towers of 132KV lines which includes the work of dehoisting of the suspension string, replacement of defective insulator and refixing of string. Work should be complete in all aspects.
Replacement work of damaged disc of tension towers of 132KV lines which includes the work of dehoisting of tension string, replacement of defective insulators and refixing of string. Work should be complete in all aspects.
Work of removing the bushes, small trees etc near tower legs, checking of tower leg earthings and attending the same if found broken and removing the extra soil from the coping of tower foundations.
132kV Substation, Chudiyala
Preventive maintenance of complete Substation equipments, i.e. complete electrical equipments, Bays, Lighting arrangement etc. round the clock by a team comprising the following technical personal. (a) Technician/fitter - 01 No. The maintenance work of the Substation shall be carried out on equipments as per technical specification and details enclosed.
Upkeeping of control room building comprises of Control room, Battery room, ACDB room, committee room, AE/JE office by providing one (01 no.) of housekeeper which includes the work of proper cleaning/dusting of control panels, doors, windows, tables, chairs and general maintenance of Batteries, ACDB's, DCDB's, lighting arrengement etc.
132kV Lines
Work of Patrolling of the following lines as per technical specification and detail enclosed.
132 kV Roorkee-Chudiyala Line on quarterly basis (6 times x 15 = 90 km).
Work of lopping - chopping of the following lines as per technical specification and detail enclosed.
132 kV Roorkee-Chudiyala Line (2 timesx 15 = 30 km).
Work of Thermoscanning of the 132kV lines which includes thermoscanning of all tension towers, jumpers, clamps, connectors etc. of the following 132kV lines:
132 kV Roorkee-Chudiyala Line (4times x 15 = 60 km).
Work of repalcement/jointing of broken/damaged jumper of above mentioned line and proper tightening. Work should be complete in all aspects.
Work of jointing/attending the broken/damaged earth wire with span joint and stringing work of 132KV lines. Work should be complete in all aspects.
Work of cleaning of the disc insulators of 132KV lines with cleaning agent and removing the birds dropping etc.
Replacement work of damaged discs of suspension towers of 132KV lines which includes the work of dehoisting of the suspension string, replacement of defective insulator and refixing of string. Work should be complete in all aspects.
Replacement work of damaged disc of tension towers of 132KV lines which includes the work of dehoisting of tension string, replacement of defective insulators and refixing of string. Work should be complete in all aspects.
Work of removing the bushes, small trees etc near tower legs, checking of tower leg earthings and attending the same if found broken and removing the extra soil from the coping of tower foundations.
*Taxes shall be applicable extra as per norms
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
TD39.pdf
Tender Documents • 1.12 MB
BOQ_106901.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .