Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.9 Laccepted-aoc | accepted-aoc |
Tender Value
₹2.2 L
EMD Value
₹2,200
Closing Date
13 Feb 2026, 4:30 pmClosed
Executive Engineer
Old Mirchi Yard, Guntur
Repairs and Maintenance in Godowns No.1 and 2 at AP Markfed site, Thadikala Bazar, Nellore in S.P.S.R Nellore District
893904
EE(AM)GNT/Ep/06/07/2025-26, Dt.27-1-2026
OPEN - NCB
Civil Works
GUNTUR, ANDHRA PRADESH
7 documents required · 7 mandatory
₹77
₹2,200
28 Feb 2026
30 Jan 2026
30 Jan 2026
Engaging excavator (JCB) for leveling yard in front of godowns including cost and conveyance, crew transportation, pol etc. all incidental operational charges cost and conveyance of all materials etc. complete
Dismantling of Brick Masonry walls and Clearing a waythe materials and stacking the carefull useful for reuse including all labour chargers etc., complete for finished item of work.
Removal of old damaged cement mortar plastering of as directed by dy Executive Engineer duly taking actual premeasurements before dismantling including all labour charges, overheads & contractor profit etc., complete.
Brick masonry in C.M (1:6) prop. using 2nd class traditional well brunt bricks having crushing strength not less than 35 kgs/sqcm including cost and conveyance of materials and labour charges for all items of work, like cement, sand, bricks, curing etc., tp site including scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaing joints and filling joints with motor etc., complete as per standard specification and as directed by the Engineer-in-charges for finished item of work. (5.4m-3.66m-=1.74m)
Plastering with CM(1:5) Prop: 20mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (external)
UP TO3.66M HEIGHT
above 3.66m height
Plastering 12mm thick in single coat in CM (1:5) for even surface cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work. (internal)
UP TO3.66M HEIGHT
above 3.66m height
White washing two coats with white cement to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., and overheads & contractors profit complete for finished item of work in all floors.
Dismantling Damaged of G.C.I. SHEETS FROM ROOFING including removal of hold fasts, J Bolts, Nuts and washers and other attachments etc., complete and stacking at site within 100metres lead including all labour charges etc., complete for finished item of work.
Roofing With 0.5mm thick galvanized /pre painted G.I profiled sheets with crimp of 200mm length fixed to the purlins With 14 size self drilling with neoprene washer Side laps are stiched with self tapping drilling screws .End laps are to be sealed with 25x3 mm Butyl tape .the sheets are provided with anti capillary groove.including cost and labour charges etc., complete as per standard specification for finished item of work.(new sheets)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Markfed.xlsx
TENDER_DOCUMENT • 0.41 MB
Tende document.doc
TENDER_DOCUMENT • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .