| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAccepted-AOC E 503 LODHA BEL AIR PATEL ESTATE S V ROAD JOGESHWARI WEST MUMBAI MAHARASHTRA 400102 | MUMBAI SUBURBAN | MAHARASHTRA | 400102 | L1 | Accepted-AOC L1-OK | |
| 2 | L2₹30.3 L+₹56,453 (1.90%)Rejected-AOC AL BELWAD POST VALLARNA VALLARNA SHAHAPUR THANE 421301 | SHAHAPUR | THANE | MAHARASHTRA | 421301 | L2 | Rejected-AOC L2-Reject | |
| 3 | L3₹33.0 L+₹3.3 L (11.2%)Rejected-AOC | L3 | Rejected-AOC L3-Reject | |
| 4 | L4₹35.7 L+₹6.0 L (20.2%)Rejected-AOC | L4 | Rejected-AOC L4-Reject |
| Sl No | Description | Qty | Unit | NEW STAR CONTRUCTION CO. L1 | GAURANG PRAKASH SAWANT L4 | M/s. Santosh Enterprises L3 | Shree Samarth Krupa Enterprises L2 |
|---|---|---|---|---|---|---|---|
| 1.00SE No. 1:- Renovation of compound wall at front side of Udyog sarathi bldg & Painting to barrak bldg. in Udyog Sarathi premises. | |||||||
| 1.01 | Removing wire fencing with iron/ C.C. fencing post and stacking the materials as directed with all leads, lifts etc. complete. | 100 | Running Meter | 55 ₹5,500 | 70.35 ₹7,035 | 59.79 ₹5,979 | 40 ₹4,000 Lowest |
| 1.02 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | 115 | Square Meter | 37 ₹4,255 Lowest | 47.25 ₹5,433.75 | 40 ₹4,600 | 130 ₹14,950 |
| 1.03 | Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 16 | Cubic Meter | 457 ₹7,312 Lowest | 585.9 ₹9,374.4 | 498 ₹7,968 | 750 ₹12,000 |
| 1.04 | Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. | 110 | Cubic Meter | 316 ₹34,760 Lowest | 399 ₹43,890 | 339 ₹37,290 | 600 ₹66,000 |
| 1.05 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. | 200 | Square Meter | 45 ₹9,000 Lowest | 54.6 ₹10,920 | 46.5 ₹9,300 | 100 ₹20,000 |
| 1.06 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/ gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) | 65 | Cubic Meter | 5,250 ₹3,41,250 Lowest | 6,676.6 ₹4,33,979 | 5,675 ₹3,68,875 | 6,000 ₹3,90,000 |
| 1.07 | Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete. | 110 | Cubic Meter | 4,200 ₹4,62,000 Lowest | 5,276.25 ₹5,80,387.5 | 4,484 ₹4,93,240 | 5,750 ₹6,32,500 |
| 1.08 | Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. | 200 | Square Meter | 531 ₹1,06,200 Lowest | 670.95 ₹1,34,190 | 570 ₹1,14,000 | 650 ₹1,30,000 |
| 1.09 | Providing & fixing decorative MS grill in hollow section of various thickness and size in square, rectangular and round shape from 20mm to 450mm section including frame structure of 50mm x 25mm in 3mm thick, 20mm x 20mm in 3mm thick including G. I. mesh in form of 50mm x 50mm x 12mm etc. as per detailed designs and drawing or as directed including cutting, fabricating, hoisting, erecting, fixing in position, making riveted/bolted/ welded connections and painting complete. | 180 | Square Meter | 4,800 ₹8,64,000 | 4,978.05 ₹8,96,049 | 5,738 ₹10,32,840 | 2,100 ₹3,78,000 Lowest |
Tender Value
₹38.9 L
EMD Value
₹38,900
Closing Date
12 Aug 2025, 5:00 pmClosed
Superintending Engineer Mumbai HQ
Office of the Superintending Engineer, Mumbai, MIDC, Udyog Sarathi, Mahakali Caves Road, Andheri East, Mumbai- 93.
M and R to Non Residential bldg at Udyog Sarathi.. Renovation of compound wall at front side of Udyog Sarathi bldg. and Painting to barrak bldg. in Udyog Sarathi premises.
2025_MIDC_1205025_1
MIDC_Renovation of Compound Wall_3887129
Open Tender
Support/Maintenance Service
Item Rate
180 days
Marol Industrial Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹38,900
2 Dec 2025
29 Jul 2025
14 Aug 2025
29 Jul 2025
12 Aug 2025
29 Jul 2025
29 Jul 2025 - 4 Aug 2025
Amount
SE No. 1:- Renovation of compound wall at front side of Udyog sarathi bldg & Painting to barrak bldg. in Udyog Sarathi premises.
Removing wire fencing with iron/ C.C. fencing post and stacking the materials as directed with all leads, lifts etc. complete.
Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete
Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete.
Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc.
Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete.
Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/ gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Providing uncoursed rubble masonry of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete.
Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Providing & fixing decorative MS grill in hollow section of various thickness and size in square, rectangular and round shape from 20mm to 450mm section including frame structure of 50mm x 25mm in 3mm thick, 20mm x 20mm in 3mm thick including G. I. mesh in form of 50mm x 50mm x 12mm etc. as per detailed designs and drawing or as directed including cutting, fabricating, hoisting, erecting, fixing in position, making riveted/bolted/ welded connections and painting complete.
Providing and applying two coats of exterior weather shield paint of approved manufacture and of approved colour to the plastered surfaces including cleaning ,preparing the plaster surface ,applying primer coat ,scaffolding if necessary, and watering the surface for two days etc complete. NOTE: For Item Nos. 15 to 18 prior approval of Superintending Engineer will be necessary
Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete.
Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including scaffolding and curing etc. complete.
SE No. 2:- Painting & Minor repairs to barrak bldg. in Udyog Sarathi premises.
Providing and applying two coats of exterior weather shield paint of approved manufacture and of approved colour to the plastered surfaces including cleaning ,preparing the plaster surface ,applying primer coat ,scaffolding if necessary, and watering the surface for two days etc complete. NOTE: For Item Nos. 15 to 18 prior approval of Superintending Engineer will be necessary
Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete.
Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Removing old paint from steel and other metal surfaces and making the surfaces even with hand scrapping, scaffolding etc. complete.
Providing and applying priming coat over new/old steel and other metal surfaces including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter and scoured with wire brushes, fine steel wool, scrappers and sand paper, scaffolding etc. complete.
Providing and applying two coats of synthetic enamel paint of approved colour to new /old structural steel work and wood work in buildings, including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete.
Removing G.I. or A.C. sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete.
Providing and fixing 6.00 mm thick ISI mark Asbestos Cement Corrugated sheet roofing including galvanised iron J or L hook bolts galvanised iron band bituminous G.I. washers, galvanised iron clamps, bolts, nuts and scaffolding etc. complete.
Providing and applying white-wash in two coats on old / new plastered or masonry surfaces and asbestos cement sheets including scaffolding and preparing the surface by brushing and brooming down etc. complete.
Shree Samarth Krupa Enterprises (BID ID -6815725)
M/s. Santosh Enterprises (BID ID -6818517)
GAURANG PRAKASH SAWANT (BID ID -6818860)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .