Loading…
Loading…
Tender Value
₹20.5 L
EMD Value
₹51,200
Closing Date
8 Sept 2026, 3:00 pm
Divisional Engineer-(Elec-I), Tirupati
tpty
AMC for the Ductable AC plants and Exhaust systems available in ESD PAT, TTD, Tirupati for a period of 3years from 2026-29.
978104
140/DE(Elec.)-I/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
TIRUPATHI
7 documents required · 7 mandatory
₹725
₹51,200
20 Aug 2026
20 Aug 2026
20 Aug 2026
Part - A (AMC of AC Plants)
Annual Maintenance Charges / service charges for Air-Cooled ductable AC Plant with the following scope of work to undertake service and repairs to the AC plant for 36 months during normal working hours by carrying out the following of Voltas make.
Sri Kalyana Venkateswara Swamy Temple at Narayanavanam - 2 Nos. 5.5 TR x 2 Nos = 11 TR
Sri Vedanarayana Swamy vari Temple, Nagalapuram - 2 Nos 5.5 TR x 2 Nos = 11 TR
Sri Kodanda Rama Swamy Temple, Vontimitta - 2 Nos 5.5 TR x 2 Nos = 11 TR
Sri Venugopala Swamy Temple, Karvetinagaram - 2 Nos 5.5 TR x 2 Nos = 11 TR
Sri Lakshmi Venkateswara Swamy Temple, Devunikadapa = 11 TR
Sri Prasanna Venkateswara swamy Temple, Appalayagunta - 2 Nos 8.75 TR x 2 Nos = 17.5 TR
Asthanamandapam, Tiruchanoor - 8 Nos 11 TR x 8 Nos = 88 TR
Sri Padmavathi Ammavari Temple, Tiruchanoor - 2 Nos 11 TR x 2 Nos = 22 TR
Sri Sundaraja Swamy Temple Tiruchanoor = 8.5 TR
Sri Sowmyanadha Swamy Temple Nandalur - 1 No 3.5TR & 1 No. 5.5TR, Total - 9 TR
For the Year 2026-27
For the Year 2027-28
For the Year 2028-29
Scope of work covered in AMC for AC Plants : Scope of work covered in AMC for AC Plants : 1) Inspecting the plant and / or the system and carrying out preventive maintenance as per standard practice twelve times a year (once in a month). 2) Checking the refrigeration system, motor and starters for performance and ensuring the overall healthy condition of the plant. 3) Checking the system for leaks and then rectifying the leaks, if any. 4) Checking the refrigeration control system for operation and adjusting the settings if necessary. 5) Descaling the condensers for water- cooled units if considered necessary. (Maximum two per year) 6) Cleaning the evaporator and condenser coils once /twice a year if considered necessary. 7) Lubricating the bearings of motors, pumps and fans as and when required. 8) Quarterly inspection of belts, which includes adjusting the tension and replacing the worn out belts if necessary. 9) Repairing the components of the equipment at site or at the service station as & when required.
10) Overhauling the components of the equipment at site or at the service station as and when required. 11) Replenishing the refrigerant as a result of a leak from the system arising out of standard wear and tear. 12) Attending to the plant when called upon. 13) Attending to complaints / Breakdown calls whenever received. 14) Reporting the healthiness of the plant and suggesting improvements if any. 15) Painting of equipment once in three years. 16) Checking the electrical items and control wiring and rectifying the defects if any. 17) Rewinding of compressors (or replacing), fans, Motors etc. will be taken up as and when required. 18) Service reports should be submit to the concern DE(Elec) DYEE(Elec) and AE (Elec) soon after each service.
AMC of Exhaust System
AMC of Exhaust Blowers 5000CFM available in Laddu Potu of Sri PAT Tiruchanoor for 3 Years.
For the year 2026-27
For the year 2027-28
For the year 2028-29
AMC of Exhaust Blowers 2000CFM In Ammavari Sannidhi of Sri PAT Tiruchanoor - 01 No for 3 Years
For the year 2026-27
For the year 2027-28
For the year 2028-29
The AMC of Exhaust system includes the following scope of work 1.Monthly inspection and servicing the system i.e., cleaning the filters of fresh air blower and exhaust blower. 2.Checking the alignment of pulleys and adjusting the same. 3. Checking the condition of the belts and replacing the worn belts, if any. 4. Checking the motor bearing and greasing the bearings and will be replaced the worn out bearings. 5.Cleaning the grease filters monthly once. 6. Checking the condition of the fresh air filters and will be replaced, if necessary. 7. Rewinding of motors of fresh blower and exhaust blower, if necessary. 8. Service reports should be submitted to the concern DE(Elec) DYEE(Elec) and AE (Elec) soon after each service.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 140.xlsx
TENDER_DOCUMENT • 0.07 MB
140 NIT.doc
TENDER_DOCUMENT • 2.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].