| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC B 22 152 STREET NO 1 14 BABA FARID NAGAR BATHINDA 151001 PB | BATHINDA | PUNJAB | 151001 | ₹1.7 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹1.8 Cr+₹1.6 L (0.94%)Rejected-Finance VILLAGE SAHARNA | ₹1.8 Cr+₹1.6 L (0.94%) | L2 | Rejected-Finance due to higher rate |
| 3 | L3₹1.9 Cr+₹10.5 L (6.01%)Rejected-Finance GIDDERBAHA PUNJAB | ₹1.9 Cr+₹10.5 L (6.01%) | L3 | Rejected-Finance due to higher rate |
| Sl No | Description | Qty | Unit | SURINDER SINGH CONTRACTOR L3 | HARBANT SINGH CONTRACTOR L2 | HARPREET SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. | 1 | Cum | 81 ₹81 | 50 ₹50 Lowest | 81 ₹81 |
| 2.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods. | 1 | Cum | 114 ₹114 | 50 ₹50 Lowest | 114 ₹114 |
| 3.00 | Dressing of earth work (i) New work or remodeling work. | 1 | Sq.Mtr | 1 ₹1 Lowest | 1 ₹1 Lowest | 1.3 ₹1.3 |
| 4.00 | Earth filling (b (i)) Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres | 1 | Cum | 147 ₹147 | 100 ₹100 Lowest | 147 ₹147 |
| 5.00 | (a)) Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | Km | 848 ₹848 Lowest | 848 ₹848 Lowest | 848 ₹848 Lowest |
| 6.00 | LINING- Dressing bed and preparation of sub grade for lining. | 1 | Sq.Mtr | 11 ₹11 | 10 ₹10 Lowest | 11 ₹11 |
| 7.00 | Dismantling brick work tile, masonry or tile lining: (b) In cement | 1 | cum | 718 ₹718 Lowest | 718 ₹718 Lowest | 718 ₹718 Lowest |
| 8.00 | BRICK WORK (i)) First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 1 | Cum | 6,966 ₹6,966 | 6,719 ₹6,719 | 6,450 ₹6,450 Lowest |
| 9.00 | PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls & Top | 1 | Sq.Mtr | 190 ₹190 | 184 ₹184 Lowest | 190 ₹190 |
| 10.00 | PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors | 1 | Sq.Mtr | 146 ₹146 | 142 ₹142 Lowest | 180 ₹180 |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
29 Oct 2025, 10:00 amClosed
Executive Engineer
Executive Engineer, Bathinda Canal and Ground Water Division, Bathinda
Estimate for Relining of Watercourse By Brick masonary of Outlet RD 13180/R of Gehal Disty
2025_WR_151974_3
34/22A/2025-26
Open Tender
Civil Works - Canal
Item Rate
Raikot
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3.3 L
bathinda
28 Nov 2025
13 Oct 2025
29 Oct 2025
13 Oct 2025
29 Oct 2025
13 Oct 2025
21 Oct 2025
Amount
Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods.
Dressing of earth work (i) New work or remodeling work.
Earth filling (b (i)) Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres
(a)) Dag belling single kassi stroke minimum 7.5 cm depth.
LINING- Dressing bed and preparation of sub grade for lining.
Dismantling brick work tile, masonry or tile lining: (b) In cement
BRICK WORK (i)) First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls & Top
PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors
CONCRETE Supplying & laying dry brick bats
Cement concrete 1:2:4 With stone ballast or shingle mixing by manual means
CENTRING AND Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
STEEL AND IRON WORK Cold twisted deformed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Fixing of RCC frame in Nakka
Re-handling of Earthwork Recently Executed.
HARBANT SINGH CONTRACTOR (BID ID -692693)
SURINDER SINGH CONTRACTOR (BID ID -694637)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_307855.xls
BOQ • 0.28 MB
TB03.xls
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .