Tender Value
₹32.6 L
EMD Value
₹32,700
Closing Date
2 Jun 2026, 6:00 pmClosed
UNIT MANAGER, DISTRICT WATER & SANITATION UNIT, BHAVNAGAR, WASMO
Providing, Supplying, Lowering Laying and Jointing 6kgf/sq.cm PVC Distribution Pipe line, Rising Main Pipe line, House Hold Connection, Pumping Machinery for Sump & Well, Construction of Pump House, VAP Slogan and One Month Trial run for PANIYALI village water supply scheme Ta. TALAJA, District Bhavnagar. UNDER AUGMENTATION OF TAP CONNECTION IN RURAL AREA PROGRAMME.
304735
01/2026-27
Open
Civil Works - Water Works
Works
Bhavnagar
1 document required · 0 mandatory · 1 optional
₹1,500
Executive Engineer, District Water and Sanitation unit, BHAVNAGAR.
₹32,700
13 May 2026
13 May 2026
13 May 2026
2 Jun 2026
13 May 2026
Estimated Cost : Rs.
WATER AND SANITATION MANAGEMENT ORGANIZATION
BID DOCUMENTS FOR — Providing, Supplying, Lowering Laying and Jointing 6kgf/sq.cm PVC
Distribution Pipe line, Rising Main Pipe line, House Hold Connection, Pumping Machinery for Sump &
Well, Construction of Pump House, VAP Slogan and One Month Trial run for PANIYALI village water
supply scheme Ta. TALAJA, District Bhavnagar..
Sr. No. Description
SCHEDULE B-1:: Providing, Supplying and Fixing of Pumping Machinery :
5 (i) 15 HP, 900 LPM, 37 Mt Head For Well In Dam
(ii) 15 HP, 870 LPM, 32.5 Mt Head For Exi. Sump
SCHEDULE B-2:: Providing, Supplying, Lowering Laying and Jointing
6 160 mm Dia. 6kgf/sq.cm PVC Rising Main Pipe line :
Exi. Sump to Exi. ESR
SCHEDULE B-3:: Providing, Supplying, Lowering Laying and Jointing
6kgf/sq.cm PVC Distribution Pipe line
8 SCHEDULE B-4:: House Hold Tap Connection
9 SCHEDULE B-5:: Construction of Pump Room (2.0m X 2.0m X 3.0m)
10 SCHEDULE B-6:: VAP Board and Slogan Writing
12 BREAK UP FOR INTERIM PAYMENTS
13 DATA SHEETS FOR CIVIL AND MECHANICAL WORKS
Name of Work:- Providing, Supplying, Lowering Laying and Jointing 6kgf/sq.cm PVC
Distribution Pipe line, Rising Main Pipe line, House Hold Connection, Pumping Machinery for
Sump & Well, Construction of Pump House, VAP Slogan and One Month Trial run for PANIYALI
village water supply scheme Ta. TALAJA, District Bhavnagar.
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined
in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other formats
will be rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be
permitted to withdraw his bid on this account.
free supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate
as called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and
(7) Wherever for a particular item the quantities have been specified payment shall be
on unit rate basis and unit variation in quantity will be paid with pro rata basis.
(8) Each item is to be individually priced online and the amounts shall be added up to
shall be left blank except where the item description requires the item to be priced
on "as applicable” basis. The item shall not be priced if it is “not applicable” to the
bidder’s design, in which case the bidder shall add the words “NOT APPLICABLE”.
The wording in the item description is for subject matter guidance only; clause
references are indicative only and all other relevant clauses shall also be referred
to. The prices shall allow for all the works covered under the bid and all liabilities
and contractual obligations whether separately specified or not. Items against
which no prices are quoted shall not be separately paid for and the bidder shall be
deemed to have covered the cost of execution of such items (according to the
requirements of the bid document) in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid
for by the Employer when executed and shall be deemed to be already covered by
other items and rates listed in the price sheets No extra payment shall be given for
any item which is required to complete and perform the project.
the pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor.
corrections if any will be considered for financial evaluation of the bid.
(11) Schedule ‘D gives the basis of interim payment for construction of works.
(12) The bidder shall be deemed to have allowed in his price for provision, maintenance
and final removal of all temporary works of whatsoever nature required for
construction including temporary bunds, diverting water, pumping, de-watering
etc. for the proper execution of works. The rates shall also be deemed to include
any works and setting out that may be required to be carried out for laying out of
all the works involved.
(13) Prices shall be filled online only.
the Specifications and other sections of these bid documents and these documents
are to be taken as mutually explanatory of one another.
(15) The bidder shall interpret the data furnished and carry out any additional survey
work, or investigation work required at his own cost.
(16) The prices quoted shall also include the cost of materials utilized for testing.
(17) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at
his own cost. These accesses will be used by the other contractors working for
the prices shall include all the equipments / materials / accessories and services
(19) 1% of the value of work will be deducted from the Running bill against labour cess
which is non refundable.
(20) Third Party Inspection / CSC agency will be deployed by WASMO and charges of
the same will be borne by WASMO.
(21) Any expenditure incurred by inspection/ CSC agency for the work misinformed by
the contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(22) The rates quoted shall be exclusive of GST but inclusive of all other taxes and cess
or levies or duties which shall not be paid extra. While GST will be paid for
admissible part of actual work done at the approved tender rates and tender
condition of price variation. GST shall be paid as per prevailing rates at the time of
payment. The TDS shall be deducted at source as per provision of IT rules and
(23) The rates should be quoted exclusive of GST but inclusive of all other taxes as per
Volume-I (B), General Conditions of Contract, Clause No.
(24) The rates quoted shall be inclusive of all taxes, duties and GST, also including of
service tax, which shall not be paid extra. The TDS shall be deducted at source as
per provision of IT rules and WASMO/GWSSB policy.
(25) The Bidders shall have to quote the rates in this tender keeping in view of the GST.
The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(26) The process requires that the bidder shall quote his price for the work components
and fix during the entire period of performance of the contract except price
variation allowed for supply of MS/DI/PVC/GI pipe as per Volume-IB Clause No.
59, General Conditions of Contract.
(27) Payment shall be made for the components for which lump sum prices are quoted,
as per the schedule of payment. Total cost will be worked out on the basis of work
done of individual items and rates quoted against those particular items only.
(28) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in the
Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-
2010-595- (6)- M.I. Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and
shall be recovered from the running bills of the work from time to time and
remaining amount if any shall be recovered from the final bill before releasing the
security deposit of the work. The contractor shall furnish the statement showing
the quantity of quarried materials / minerals from whom purchased ( with full
address of the seller) and copies of the bills for purchase to the Executive Engineer
of the in charge of the work. The contractor shall also furnish such additional
information as regards royalty payment to the competent authority.
(29) Agency shall have to take Insurance policy and intimate to WASMO along with the
evidence within time limit. In case of non compliance entire responsibility shall be
rest with the agency and required amount shall be recovered from any due amount
(30) WASMO can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
(31) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the state
of Gujarat. For arriving at the difference in procurement prices due to introduction
of GST it will be open for the Board to ask for original invoices, lorry receipt, weigh
bridge slips, payment details and such other documents as may be required for the
(32) The claim of contractor regarding GST shall have to be backed by documentary
evidence substantiating the actual payment of tax duly certified by the competent
tax authority. The final decision regarding the quantum of claim amount to be
recovered or reimbursed shall be of the competent authority of the WASMO and
shall be binding on the contractor.
SIGNATURE OF CHAIRMAN UNIT MANAGER
CONTRACTOR VWSC- PANIYALI WASMO BHAVNAGAR
Bidders are required to fill up all the blank spaces in this Bid Form.
THE UNIT MANAGER,
D.W.S.U. - WASMO,
SUB: Providing, Supplying, Lowering Laying and Jointing 6kgf/sq.cm PVC Distribution Pipe line,
Rising Main Pipe line, House Hold Connection, Pumping Machinery for Sump & Well,
Construction of Pump House, VAP Slogan and One Month Trial run for PANIYALI village water
supply scheme Ta. TALAJA, District Bhavnagar. The bidder shall quote his firm and fixed price
for the entire work under this Contract, defined in more details in various sections of this bid
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda/Amendments to the above, for the execution of the above Contract, we
the undersigned offer to design, engineer, procure, construct, complete and commission the
whole of the said works for 1 months from the date of commissioning including defects
liability period as given in Conditions of Contract and in conformity with the drawings,
Documents, including Addenda Nos._............. (insert numbers) for Lump sum fixed price of
_______________ Rupees _________________________________________ for Construction including free
trial run for One months or such other sum as may be ascertained in accordance with the
2. I/We agree that
a) If we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the inspection
and testing of materials and workmanship.
b) If we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative.
c) If we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any action
including termination of Contract and impose at his absolute discretion any penalties,
and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract within _________ months, inclusive of monsoons, from the date or receipt of
Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 120 days from the Last date of submission of
the bill and it shall remain binding upon us and may be accepted at any time before the
expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract there to annex but until such agreement
is prepared this Bid together with your written acceptance thereof shall constitute a
binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of value
specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in Appendix
to Bid and agree that they represent a fair estimate of the damages likely to be suffered by
you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the Person)
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
NAME OF SCHEME:- PANIYALI VILLAGE WATER SUPPLY SCHEME
TALUKA: TALAJA, DIST.: BHAVNAGAR
Providing, Supplying, Lowering Laying and Jointing 6kgf/sq.cm PVC Distribution Pipe line,
Rising Main Pipe line, House Hold Connection, Pumping Machinery for Sump & Well,
Construction of Pump House, VAP Slogan and One Month Trial run for PANIYALI village water
supply scheme Ta. TALAJA, District Bhavnagar.
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined
in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be charged.
Sr. No. Particular Qty. Rate at which the material Place of
will be charged to the Delivery
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by
the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his own
cost for loading, unloading, and transporting safety to the site of work the cement stipulated
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but available with
the dept. will be issued on request to the contractor. (For use in this contract only) at
prevailing market rates or departmental issue rates whichever is higher.
5. All the surplus materials supplied by the dept. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness and
soundness by the contractor before taking the delivery of the materials from the
7. Necessary cement will be purchased by the agency at their own cost from open market.
8. The persons of firm submitting the Tender should see that rates in the above schedule are
filled up by the Executive Engineer, on the issue of form prior to the submission of the
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition, otherwise
recovery at the double rates will be affected in view of Clause 12.4.
SIGNATURE OF CHAIRMAN UNIT MANAGER
CONTRACTOR VWSC-PANIYALI WASMO BHAVNAGAR
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey
Contract on EPC basis, the provision of measurement will be applicable only for the
assessment of value of work done for inclusion in any interim certificate for part payment
to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified in
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each items specified in Schedule B,
based on the Employer's best appreciation of the value of the component as related to the
total costs of the concerned item as whole. A head titled (any other item(s)) is included in
each breakdown of schedule and the tenderer shall at the time of tendering indicate any
additional items which he considers necessary but cannot be covered by any of the heads
indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to
the tenderer’s scheme and design and he should take this into account while quoting his
lump sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used
for assessment of percentage progress of the component at any stage. By measurement
jointly taken by the Employer's Representative and the Contractor, mutually agreed and
entered in the measurement books in the form and by the method approved by the
Employer's Representative, and signed jointly by both the parties.
SIGNATURE OF CHAIRMAN UNIT MANAGER
CONTRACTOR VWSC-PANIYALI WASMO BHAVNAGAR
BREAK UP FOR PAYMENTS SCHEDULE
Item Description of Items Percentage Payment to
a. On supply 65 % of Quoted rate
b. Completion of Lowering, Laying And Jointing 15 % of Quoted rate
c. After completion of Hydraulic Testing 10 % of Quoted rate
d. After refilling and disposal of surplus stuff and
10 % of Quoted rate
a. On supply 70 % of Quoted rate
b. On erection 20 % of Quoted rate
c. On Hydraulic Testing And Commissioning 10 % of Quoted rate
3 GROUND (UNDERGROUND) LEVEL SERVICE
RESERVOIRS/SUMPS
a. On completion of excavation and base slab 20 % of Quoted rate
b. On completion of vertical wall and braces 20 % of Quoted rate
c. Full supporting structure including column, ring 15 % of Quoted rate
beam and completion of top slab / dome
d. Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate
e. Procurement and fixing of inlet, outlet, washout, 15 % of Quoted rate
overflow pipes, valves, specials, chambers, lighting
arrester conductor and specials at site
f. Water level indictor, painting of letters, M.S ladder, 10 % of Quoted rate
pipes, railing and all miscellaneous items such as
snowcem paint in three coats etc (Completed with all
respect) including water tightness test
On hydraulic Testing 10 % of Quoted rate
4. Construction of RCC ESR
a. On completion of excavation and Concreting up to G.L. 10 % Quoted rate
On completion of Full shaft and braces including 20 % Quoted rate
staircase up to bottom slab/ dome level
Completion of bottom slab or dome vertical wall or slant 20 % Quoted rate
wall of container without top slab or dome
Top slab or dome, staircase with RCC cabin and door 10 % Quoted rate
Completion of Plaster and hydraulic test 15 % Quoted rate
Procurement and fixing of inlet, outlet, washout, 10 % Quoted rate
f. overflow pipe valves specials chambers, lighting
arrester conductor and specials at site
Fixing above pipes, specials as directed 5 % Quoted rate
Water level indictor, painting of letters M.S ladder pipe, 10 % Quoted rate
railing and all miscellaneous items such as paint in three
coats etc ( Completed with all respect ) including water
tightness test, including commissioning
5 Providing, Supplying ,Fitting & Commissioning
Pumping Machinery
a. On receipt of materials on site. 75 % of Quoted rate
b. Fitting and Testing Completed with all respect. 25 % of Quoted rate
6 Cattle Trough
a. Completion of work up to GL and Bottom Slab 25 % of Quoted rate
b. Completion of work up to Vertical wall 45 % of Quoted rate
c. Completion of work up to plaster and valves and inlet
25 % of Quoted rate
out let connections
d. After Defect Liability period 5 % of Quoted rate
a. Completion of work up to plinth level 20 % of Quoted rate
b. Completion of work up to lintel 10 % of Quoted rate
c. Completion of work up to slab level & slab 20 % of Quoted rate
d. Completion of work including plaster doors etc. inside
distempering and outside snowcem paint.(Completed 45 % of Quoted rate
with all respects)
e. After Successfully Commissioning (For 1 month) 5 % of Quoted rate
SIGNATURE OF CHAIRMAN UNIT MANAGER
CONTRACTOR VWSC-PANIYALI WASMO BHAVNAGAR
DATA SHEET FOR PUMP HOUSE
Sr.No. PARTICULARS PARAMETER/REQUIREMENT
1.1 Item Pump House
1.2 Type RCC /masonry Framed pump House
1.3 Carpet Area As per Price bid
1.4 Height As per Drawing
1.5 Location As per BOQ and Drawing
2.1 Control Levels
a) Average ground level (GL) As per Price Bid & Drawing
b) Pump House Floor Level 0.60 m above GL. The riser of step shall not be more
than 150 mm and the treads could not be less than
2.2 SBC at site NA
2.3 Water Table NA
2.4 Material Handling Arrangement As per Price Bid
2.5 Seismic Zone As per latest IS Code
2.6 Water Density 9.81 KN/cu.m.
3. DESIGNREQUIREMENT
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-25( Minimum)
3.3 Grade of Steel Only TMT Fe-500 steel to be used
3.4 Live Load on the Pump Floor Level Minimum 300 kg/Sq. m
3.5 Foundation As per type design of WASMO.
3.6 Column As per type design of WASMO.
3.7 Beam As per type design of WASMO.
3.8 Bottom Floor As per type design of WASMO.
3.9 Top Slab As per type design of WASMO.
3.10 Clear cover Foundation-60mm
Vertical Walls, beams, slabs-40mm & Other element
as per latest IS code.
Minimum Reinforcement for all Design requirements as set out in relevant IS codes
3.11 members in respect of all Reinforcements shall be strictly
For Exterior weather proof exterior emulsion paint
(Two coat) of approved brand and of required shade
of wall Surface to give an even shade after
thoroughly brushing the surfaces clean of all grease,
3.12 Painting dirt, loose pieces of scales and For internal Wall
painting ( coats) with plastic emulsion paint of
approved brand and manufacture on undecorated
wall surface to give an even shade including
thoroughly brushing the surface free from mortar
droppings and other foreign matter and sand
papered smooth.
DATA SHEET FOR PUMPING MACHINARY
Sr.No. Particular Value
1.0 APPLICATION To draw Raw / Clear water
1.1 Pump Type Horizontal Mono Sub. Pump
1.2 Number of Pumps As per Price bid
1.3 Number of normally working pumps As per Price bid
1.4 Design Capacity As per Price bid
1.5 Total head at design capacity As per Price bid
1.6 Total duration of operation 8 hours continuous
1.7 Speed 2900 (nominal)
1.8 Applicable standard IS -14220:1994
2.0 FEATURE OF CONSTRUCTION
2.1 Casing Sub Pump Set Open well type
2.2 Impeller Closed
2.3 Shaft Common shaft of pump & motor
2.4 Drive Transmission Direct
2.5 No. of Stage One
2.6 Nozzle orientation A. Suction Center suction
B. Discharge Top Side discharge
2.7 Flange Drilling IS
2.8 Direction of rotation As per manufacturer's standard
3.0 LIQUID DATA
3.1 Liquid handled To draw Raw / Clear water
3.2 Specific gravity
3.3 Temperature Ambient
4.0 MATERIAL OF CONSTRUCTION
4.1 Casing Cast iron Grade FG 200 of IS- 210:1993,
Alloy steel casing conforming to IS-3444:1987.
4.2 Impeller High tensile brass conforming to IS -304:1981
or leaded tin Bronze LTB 2 of IS-318:1981
4.3 Shaft (Common of Pump & motor) Grade X04 Cr 12, X12 Cr 12 or X20 Cr
Conforming to IS: 1570 (Part-5) 1985 or Grade
40C8 or 45C8 conforming to IS-1570 (Part-2/
4.4 Motor Rotor Electrical sheet steel and electro Grade copper
rods conforming to IS-613:1984or Aluminium
die cast rotor conforming to IS -617:1984.
4.5 Stator Core Electrical sheet steel and PVC Insulated
winding wire/polymer insulated winding
wires or with any suitable plastic covered
wires conforming to IS-8783:1978.
5.0 ACCESSORIES AND SERVICE REQUIRED
5.1 Foundation bolts Yes
5.2 Companion flanges Yes
5.3 Spare parts recommended Yes
5.4 Maintenance tools Yes
5.5 Start-up / essential spares Yes
5.6 Painting Yes
6.1 Hydrostatic test Test certificate required
6.2 Performance test At Manu. Works testing required as per IS
SIGNATURE OF CHAIRMAN UNIT MANAGER
CONTRACTOR VWSC-PANIYALI WASMO BHAVNAGAR
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. NIT Paniyali.pdf
2. Instruction to Bidder.pdf
3. Volume 2B General condition.pdf
4. Technical specification.pdf
5. GR.pdf
6. SCHEDULE B.pdf
7 Price bid PANIYALI.pdf
17_Royelty 18.06.19 New rate_510-513.pdf
Circular 10 Percentage Excess.pdf
Circular Unbalance rates Dt.12-06-2025.pdf
G.S.T. all Circular.pdf
I.P Address GR.pdf
Labour cess GR.pdf
Paniyali VWSS Distribution Network map.pdf
Pipe Factory inpection Pariptra.pdf
PumpRooms_2x2.pdf
Pipe Purchase With Village Taluka and District Name Circular.pdf
R and B Unbalance 03.05.2013.pdf
R and B Unbalance 27.11.2008.pdf
SD EMD GR 25-26.pdf
Submission of Doc GR.pdf
Time limit circular.pdf
WASMO Logo print on pipe (1000 meter)0001.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].