Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | ₹9.3 L Quoted ₹9.6 L | L1 | Accepted-AOC Due to L1 |
Tender Value
₹7.8 L
EMD Value
₹15,600
Closing Date
1 Oct 2019, 10:30 amClosed
EE Bilaspur Division No. 2 HPPWD Bilaspur
EE Bilaspur Division No. 2 HPPWD Bilaspur
Annual Maintenance plan for the year 2018-19 for State Rural roads (under PMGSY) (Additionality) (SH- Providing and laying, 25mm thick bituminous concrete on link road to Swahan to Dolra Km. 0/0 to 1/110) (DRRP No. HP0101VR 197)
2019_PWD_31587_1
PW-NBT/CB/Tender/2018/7596-99 dated 22.08.2019
Open Tender
Civil Works
Item Rate
90 days
Bilaspur
Refer in SBD
9 documents required · 9 mandatory
₹350
EE Bilaspur Division No. 2 HPPWD Bilaspur
₹15,600
8 Mar 2020
20 Sept 2019
1 Oct 2019
20 Sept 2019
1 Oct 2019
20 Sept 2019
Amount
Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.20 to 0.25Kg(zero point twenty into zero point twenty five kilogramme )per square metre on the prepared bitumenious surface cleaned with Hydraulic broom as per Technical Specification Clause-503. including carriage of materials, within all leads and lifts as per direction of Engineer-in-charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying bitumenious concrete with 100-120 TPH batch type hot mix plant producing an average output of 75(Seventy five) Tonne per hour using crushed aggregates of specified grading premixed with bitumenious binder V.G 30(Viscosity grade Thirty @ 5.4 to 5.6 (Five point four to Five point Six)percent of mixed and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and tandern rollers to achieve the desired degree of compaction as per MORTH Specifications clause 509 complete in all respect .(B.C. Thickness 25mm(Twenty five milimetre) including carriage of materials, within all leads and lifts as per direction of Engineer-in-Charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 KN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506, 50mm(Fifty milimetre ) thick bitumen V.G-10)(Viscosity grade ten).including carriage of materials, within all leads and lifts as per direction of Engineer-in-charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .